- Conference Article
- 10.1061/9780784484296.020
Preventing Catastrophic Failure of a Force Main: Employing the Right Technologies, Construction Methods, and Materials
- Jul 28, 2022
- Daniel String + 1 more +1
A 24-in. prestressed concrete cylinder pipe (PCCP) between pump stations in north Dover, DE, and downtown Dover, constructed as part of the original network to convey wastewater to the Kent County Resource Recovery Facility had significant point failures in the past ten years, resulting in substantial damage to surrounding roadways and communities. The county identified 15,000 LF of sewer force main that needed immediate rehabilitation and renewal to prevent future failures. Located below Route 13, a key access road to the state capital, universities, businesses, and major tourist destinations, combined with buried utilities that had to be maintained throughout construction, and with work set to begin during the heavy tourist season and continuing into the holiday season, the project faced challenges that could only be overcome using the correct construction methods and materials. This paper will explore the benefits of using the appropriate rehabilitation technique and construction materials, including trenchless technologies such as sliplining, and jack-and-bore, with a combination of some traditional open-cut installations. Use of the appropriate pipe materials and their suitability for the selected renewal methods will also be discussed. Construction-related topics unique to the rehab method and materials will also be a focus of the discussions.
Read more