- Book Chapter
- 10.1007/978-3-031-49597-7_11
Goal 11: Sustainable Cities and Communities – The Case of LKAB
- Jan 01, 2025
- Anna Sörensson + 1 more +1
Publications from 2021 to 2026
Showing 8 of 8 papers
Goal 11: Sustainable Cities and Communities – The Case of LKAB
Goal 8: Decent Work and Economic Growth – The Case of Puma
Goal 12: Responsible Consumption and Production – The Case of IKEA
Goal 15: Life on Land – The Case of Unilever
A user-friendly tool for allocation of emission limits considering frequency-dependent impedance
Distribution system operators need simple tools for calculating the impact on voltage quality from new loads and renewable generation. This paper presents the further development and verification of a tool for allocating electrical emission quotas based on the standards IEC 61000-3-6, IEC 61000-3-7, and IEC 61000-3-13. The main focus is a simple methodology for estimating the frequency-dependent impedance, which will improve the accuracy of the allocation. Thus, the tool allows for higher single harmonic current limits for most customers, which could reduce their installation costs.
Read morePale Plumage in Golden Eagles from Scandinavia: Extreme Variants or a New Color Morph?
Computer Aided Arc Flash Risk Assessment According to IEEE and DGUV Standards
This paper presents an arc flash risk assessment procedure using different computer tools from different countries. Different computation methods according new requirements in NFPA 70E (2018), IEEE 1584 and DGUV I 203-077 standard. Three different software are used and compared incident energy (E <sub xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">I</sub> ) or full energy (W <sub xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">E</sub> ), arc flash boundary and the level of Personnel Protection Equipment (PPE). Arc flash risk assessment is today a mandatory part of each risk assessment for electrical workplaces and several recommendations exist in different countries. National OSHA rules in USA, EN 50110-1 in Europe and PPE Directive in Europe. A short circuit analysis is performed to calculate the values of arching currents and compute arc flash energy dissipated at busbars at HV and LV voltage busbars. Worst case scenario approach is used to examine what is highest level of Arc Thermal Performance Value (ATPV). There different software tools where used in computation: "EasyPower Arc Flash" (USA), BSD Arc Calculator (Germany) and RENblad 1710 (Norway). A practical sample case is presented and arc flash energy is computed and PPE recommended for high and low voltage busbars in one stone pit facility in Slovenia and biomass power plant in Croatia.
Read moreEstimation of Direction of Wavefront Propagation and Apparent Velocity Using Earthquake Signals Recorded in Small-Size Dense Seismic Arrays
This paper presents that the cross-correlation method is used for estimating the direction of wavefront propagation and the apparent velocity for seismic signals in the small-size dense seismic array. The near earthquake signals samples adopted from US Geological Survey Parkfield Dense Seismograph Array (UPSAR array) of the U.S are used for analyzing. The results analyzed indicate that the wavefront propagation and the apparent velocity of near earthquake signals can be succinctly and accurately estimated by the method proposed in this paper.
Read more