Abstract

The article suggests a technique for parameters determining of a maintenance and repair system (MRS) for a geographically dispersed park of technical systems (PTS). The solutions of problems of this class assume the formation, as a rule, of the topological and functional structures of the system. In addition, for geographically dispersed fleet of vehicles, it is necessary to solve the problem of distributing equipment that requires maintenance to service areas. The solution of the problem in such a formulation requires the consideration of a large number of heterogeneous factors (variables in the formalized representation of the problem). And this leads to a large dimension of the problem, which makes it difficult to obtain acceptable solutions by known methods. To overcome these difficulties, the article proposes a technique for solving such problems based on its decomposition into three problems (tasks of three levels) - the task of forming requests for maintenance, the task of forming the topological structure of the system and the task of forming the functional structure of MRS. To solve each of the problems, its formulation and methods of solution are proposed. At the first level, it is advisable to simulate the processes of changing the technical state of the PTS samples and forming applications for its servicing. Applications must be formed in such a way as to optimize the reliability (availability) of technical systems and (or) the costs of their operation. At the second level, taking into account the existing applications, it is necessary to model the functioning of the MRS elements, optimize the PTS readiness indicators and operational costs by selecting the MRS topology and the operational strategies of its elements, and by optimally distributing the maintenance and repair tasks according to the levels and elements of the system. At the third level, it is necessary to calculate and minimize the capital costs for the construction of the MRS and operating costs for various options for its construction, various ways of distributing the maintenance tasks and repairing the PTS by levels and elements of the system to make decisions about the meaning of the maintenance and repair parameters. The proposed methodology makes it possible to obtain acceptable solutions for large-dimensional problems and heterogeneous factors (task solution variables).

Similar Papers
  • Conference Article
  • Citations2

Maintenance task scheduling of wind turbines based on task priority

  • Aug 01, 2020
  • 2020 Asia-Pacific International Symposium on Advanced Reliability and Maintenance Modeling (APARM)
  • Longfei Wang
  • Research Article
  • Citations400

Fortran programs for the time-dependent Gross–Pitaevskii equation in a fully anisotropic trap

  • Apr 22, 2009
  • Computer Physics Communications
  • P Muruganandam +1
  • Research Article
  • Citations16

Extraction of Surface Primitives from Noisy Large-Scale Point-Clouds

  • Jan 01, 2009
  • Computer-Aided Design and Applications
  • H Masuda +1
  • Conference Article

Structural Reinforcement and Leak Sealing with Composite Materials

  • Apr 26, 2019
  • George Di Cesar Silva +4
  • PDF
  • Research Article
  • Citations12

Geometric Optimization of Drills Used to Repair Holes in Magnesium Aeronautical Components

  • Nov 18, 2020
  • Metals
  • Fernando Berzosa +3
  • Research Article
  • Citations10

Human-centered Evaluation of Shared Teleoperation System for Maintenance and Repair Tasks in Nuclear Power Plants

  • Aug 27, 2022
  • International Journal of Control, Automation and Systems
  • Chanyoung Ju +1
  • Research Article
  • Citations1

Semantic segmentation using synthetic images of underwater marine-growth.

  • Jan 08, 2025
  • Frontiers in robotics and AI
  • Christian Mai +2
  • PDF
  • Research Article
  • Citations6

Feasibility Study of Hole Repair and Maintenance Operations by Dry Drilling of Magnesium Alloy UNS M11917 for Aeronautical Components

  • Jun 30, 2019
  • Metals
  • Fernando Berzosa +3
  • Research Article
  • Citations70

UNION: underwater intelligent operation and navigation

  • Mar 01, 1998
  • IEEE Robotics & Automation Magazine
  • V Rigaud +12
  • Research Article
  • Citations13

Agent-based modeling of service maintenance and repair of rolling stock

  • Dec 01, 2019
  • IOP Conference Series: Earth and Environmental Science
  • Alexander Alexandrov +2
  • Conference Article
  • Citations2

Design Issues for Software Analysis and Maintenance Tools

  • Jan 01, 2005
  • D Jin
  • Conference Article
  • Citations6

Challenges for a Railway Inspection and Repair System from Railway Infrastructure

  • Nov 09, 2022
  • Miftahur Rahman +5
  • Single Book
  • Citations968

Geophysical Inverse Theory and Regularization Problems

  • Jan 01, 2002
  • Michael S Zhdanov
  • Research Article

Costs Recovered Twice in Hawaii?

  • Jun 01, 1997
  • Journal AWWA
  • Research Article
  • Citations55

Blast response and safety evaluation of a composite column for use as key element in structural systems

  • Feb 06, 2014
  • Engineering Structures
  • Ruwan Jayasooriya +2