РИЗИКИ В ІНЖИНІРИНГУ БУДІВЕЛЬ: СУТНІСТЬ, ПРИЧИНИ, НАПРЯМКИ ВИРІШЕННЯ

Show More
  • Abstract
  • Literature Map
  • References
  • Similar Papers
Abstract

Most construction projects carry a certain level of risk, and in order to determine and manage them, it is necessary to know their essence, causes, carefully plan the construction process and ensure the ability to quickly make the right decisions at each stage of the construction process [1]. Therefore, determining the essence of risks, their causes and effective methods of their management is extremely important to ensure the successful implementation of construction projects [3;4;5].During the construction process, several types of risk factors may arise simultaneously, in particular, an unexpected increase in the cost of construction materials, completed works, delays in meeting the deadlines of construction projects caused by the investor, contractor, environment, etc. As shown by the feedback of investors and contractors,the impact of COVID-19 on construction projects is significant, in particular, quarantine restrictions led to delays in the completion of projects and an increase in the cost of their completion.Analyzing the research data, it can be noted that construction projects regularly suffer from significant incidents, which are related to both the financial component and a large number of emergency situations. Effective construction risk management requires persistent attention to detail and training of the workforce to avoid undesirable situations during construction, including quality construction, accident prevention. International risk management standards vary widely, and there is almost always room for improvement. Infrastructure projects are becoming more and more complex and require more complex methods of control over them. When design work does not meet construction standards, the cost of repairs and associated risks can be extremely high. Therefore, insurers, contractors and clients should be interested in minimizing losses and perceive risk engineering as a way of positive contribution to the process of achieving a better result and as a result of a worthy investment in the future project.According to the PMBoK international standard, the risks of construction projects, their causes and solutions must be recorded, that is, timely response to negative risks contributes to the smooth execution of construction works without financial losses.

Similar Papers
  • Book Chapter

Suggestions for implementing geotechnical risk management

  • Jun 01, 2009
  • Martin Th Van Staveren
  • Research Article

Mitigating Risk in Construction Business: The Impact of Contractor Business Size and Risk Location (Office and Field)

  • Jun 21, 2023
  • International Journal of Membrane Science and Technology
  • Nufrizal Faried Hanafi +1
  • Research Article
  • Citations25

Financial risks in construction projects

  • Dec 07, 2011
  • AFRICAN JOURNAL OF BUSINESS MANAGEMENT
  • Antonio J
  • Research Article
  • Citations3

Quality monitoring in infrastructural design-build projects : the analysis of an audit-based monitoring system

  • Nov 18, 2015
  • Data Archiving and Networked Services (DANS)
  • R Ruben Favié
  • Research Article
  • Citations1

Risk Management of Construction in Sudan

  • Feb 22, 2021
  • FES Journal of Engineering Sciences
  • M S.M Ali +1
  • Research Article
  • Citations3

Risk prediction for mega construction prediction: a concise review

  • Jun 30, 2025
  • Sustainable and Resilient Infrastructure
  • Faraz Hasan Qadri +2
  • Discussion

Environmentally assisted crack growth

  • Aug 01, 1988
  • Materials Science & Engineering A
  • R.H Jones
  • Research Article

Aplicación de vehículo aéreo no tripulado para la identificación de riesgos en proyectos de construcción

  • Mar 30, 2025
  • Revista del Instituto de investigación de la Facultad de minas, metalurgia y ciencias geográficas
  • Ronald Antonio Julca Alcántara +1
  • Research Article
  • Citations35

Key risks in construction projects in Italy: contractors’ perspective

  • May 15, 2017
  • Engineering, Construction and Architectural Management
  • Ali Rostami +1
  • Research Article
  • Citations4

Analyzing Cost Overrun Risks in Construction Projects: A Multi-Stakeholder Perspective Using Fuzzy Group Decision-Making and K-Means Clustering

  • Jan 31, 2025
  • Buildings
  • Ahmed Mohammed Abdelalim +4
  • Research Article
  • Citations2

Mitigation Approach for Significant Causes of Contractor’s Delays in Construction Projects in Sri Lanka

  • Sep 29, 2021
  • Proceedings of International Conference on Business Management
  • P Tharsan +2
  • Research Article
  • Citations1

Safety risk assessment and ranking of the construction projects with combined approach of FMEA and fuzzy TOPSIS

  • Jul 11, 2020
  • Occupational Medicine
  • S Emamgholizadeh +1
  • Research Article
  • Citations4

RISK ANALYSIS OF CONSTRUCTION SECTOR IN EGYPT (DURING THE ECONOMIC RECESSION PERIODS)

  • Sep 01, 2017
  • Port-Said Engineering Research Journal
  • Shahenda El-Matbaegy +3
  • Research Article

Drivers of Successful Implementation of Infrastructure Projects in Laikipia County, Kenya

  • May 14, 2025
  • Journal of Entrepreneurship and Project Management
  • Abraham Kipkogei Rono +1
  • Research Article

Analysis of Occupational Safety Risks in Construction Projects: A Case Research of the Implementation of JSA and Hierarchy of Control

  • Aug 22, 2025
  • Devotion : Journal of Research and Community Service
  • Ade Adilla +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.