A (2 + ε )-approximation algorithm for preemptive weighted flow time on a single machine
- Jun 15, 2021
- Lars Rohwedder +1 more
Weighted flow time is a fundamental and very well-studied objective function in scheduling. In this paper, we study the setting of a single machine with preemptions. The input consists of a set of jobs, characterized by their processing times, release times, and weights and we want to compute a (possibly preemptive) schedule for them. The objective is to minimize the sum of the weighted flow times of the jobs, where the flow time of a job is the time between its release date and its completion time. It had been a long-standing open problem to find a polynomial time O(1)-approximation algorithm for this setting. In a recent break-through result, Batra, Garg, and Kumar (FOCS 2018) found such an algorithm if the input data are polynomially bounded integers, and Feige, Kulkarni, and Li (SODA 2019) presented a black-box reduction to this setting. The resulting approximation ratio is a (not explicitly stated) constant which is at least 10000. In this paper we improve this ratio to 2+e. The algorithm by Batra, Garg, and Kumar (FOCS 2018) reduces the problem to Demand MultiCut on trees and solves the resulting instances via LP-rounding and a dynamic program. Instead, we first reduce the problem to a (different) geometric problem while losing only a factor 1+e, and then solve its resulting instances up to a factor of 2+e by a dynamic program. In particular, our reduction ensures certain structural properties, thanks to which we do not need LP-rounding methods. We believe that our result makes substantial progress towards finding a PTAS for weighted flow time on a single machine.
- # Weighted Flow Time
- # Single Machine
- # Dynamic Program
- # Release Date
- # Geometric Problem
- # Release Times
- # Flow Time
- # Completion Time
- # Processing Times
- # Input Data