• Home
  • Search
  • A comparative analysis of two different approaches to scheduling in flexible flow shops
  • Cite Icon28
  • https://doi.org/10.1080/095372800414133Copy DOI Icon

A comparative analysis of two different approaches to scheduling in flexible flow shops

Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

This work is an investigation about the relative effectiveness of two approaches to scheduling in flexible flow shops: one approach advocating the possible use of different dispatching rules at different stages of the flow shop, and the other suggesting the use of the same dispatching rule at all the stages of the flow shop. In the latter approach, the dispatching rule contains the information related to both process time and duedate. Both approaches aim at the minimization of measures related to flowtime and tardiness of jobs. This paper essentially is an attempt at exploring the relative effectiveness of these two approaches to scheduling.

Similar Papers
  • Research Article
  • Citations48

Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness

  • Jun 16, 2006
  • The International Journal of Advanced Manufacturing Technology
  • K Natarajan +5
  • Research Article
  • Citations63

An immune algorithm approach to the scheduling of a flexible PCB flow shop

  • Aug 07, 2003
  • The International Journal of Advanced Manufacturing Technology
  • D Alisantoso +2
  • Dissertation

A scheduling in flexible flow shop problem with unrelated parallel machines and sequence-dependent setup times

  • Jan 01, 2007
  • Jitti Jungwattanakit
  • Research Article
  • Citations42

A swarm optimization approach for flexible flow shop scheduling with multiprocessor tasks

  • Dec 04, 2011
  • The International Journal of Advanced Manufacturing Technology
  • Manas Ranjan Singh +1
  • Research Article
  • Citations10

A constraint programming approach for resource-constrained flexible assembly flow shop scheduling problem with batch direct delivery

  • Sep 24, 2024
  • Computers and Operations Research
  • Chuangfeng Zeng +2
  • Research Article

Energy‐aware scheduling in a flexible flow shop using a hybrid constraint programming approach

  • Mar 24, 2026
  • International Transactions in Operational Research
  • Joyce Mhanna +3
  • Research Article
  • Citations30

Scheduling of multi-component products in a two-stage flexible flow shop

  • Mar 25, 2015
  • Applied Soft Computing
  • Fatemeh Nikzad +3
  • Research Article
  • Citations54

Flexible flow shop scheduling with uniform parallel machines

  • Feb 01, 2006
  • European Journal of Operational Research
  • George J Kyparisis +1
  • Research Article
  • Citations4

Robust and Stable Flow Shop Scheduling Problem under Uncertain Processing Times and Machines’ Disruption

  • Jan 01, 2021
  • International Journal of Engineering
  • Zeinab Abtahi +1
  • Conference Article
  • Citations3

Metaheuristics for two-stage no-wait flexible flow shop scheduling problem

  • Mar 01, 2015
  • Mageed A Ghaleb +2
  • Research Article
  • Citations29

New dispatching rules to minimize rejection and tardiness costs in a dynamic flexible flow shop

  • Apr 01, 2009
  • The International Journal of Advanced Manufacturing Technology
  • K Kianfar +2
  • Book Chapter

Smart Make-to-Order Production in a Flow Shop Environment for Industry 4.0

  • Jan 01, 2019
  • Humyun Fuad Rahman +2
  • Research Article
  • Citations1352

A survey of scheduling problems with setup times or costs

  • Jun 01, 2008
  • European Journal of Operational Research
  • Ali Allahverdi +3
  • Conference Article
  • Citations2

Research on Buffer Dynamic Capacity-Increase Scheduling Method in Flexible Flow Shop Based on Public Buffer

  • Jul 01, 2018
  • Shuo Lin +3
  • Research Article
  • Citations98

Scheduling flexible flow shops with sequence-dependent setup effects

  • Jan 01, 2000
  • IEEE Transactions on Robotics and Automation
  • Chung-Yang Liu +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.