A Daily Work Report Based Approach for Schedule Risk Analysis

  • Oct 11, 2019
  • Chau Le +1 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

The Critical Path Method (CPM) has been the dominant scheduling method for the past several decades. Most State Departments of Transportation (DOTs) in the U.S. currently apply CPM to estimate project duration for major and complex projects. The method, however, has limitations, and one of them is its poor ability to analyze schedule risks. While previous studies have identified various factors that cause uncertainties in schedules, the estimated duration from CPM is deterministic. To quantify schedule risks, the Program Evaluation Review Technique which uses three-point estimates for activity duration and Monte Carlo Simulation (MCS) based methods that assign uncertainties to work activities through the probability distributions of activity durations have been limitedly used in the industry. After running the simulation thousands of times, the probability distribution of the total project duration can be developed to assist risk analysis, such as determining a schedule contingency for the project. In current practices, the use of the MCS method is still limited due to various reasons. One of the most challenging issues is the difficulties in estimating the probability distributions of activity durations objectively. This study aims to leverage historical digital daily work report (DWR) data available in the DOTs’ databases to determine the probability distributions of the production rates of work activities then estimate the distributions of activity durations when quantities of the activities are provided. Since the DWRs record the daily accomplished quantity of each work item in the construction phase, the actual production rates of the work items can be calculated to obtain a more accurate and realistic duration estimate for a future project. DWR data collected from a DOT were used to conduct a case study that demonstrates the value of this new approach for schedule risk analysis.

Similar Papers
  • Research Article
  • Citations1

A Comparative Analysis of the CPM and PERT Methods in Project Time Management for a High-Rise Building Construction Project in Yogyakarta

  • May 01, 2025
  • Sustainable Civil Building Management and Engineering Journal
  • Fazabella Wijaya Santoso +2
  • Research Article
  • Citations2

Scheduling The Construction of Low-Income Community Houses in Palu City Using the Probabilistic Duration Method

  • Jun 01, 2024
  • IOP Conference Series: Earth and Environmental Science
  • A Setiawan +2
  • Conference Article
  • Citations2

Random Simulation Method for the PERT Network Based on the CrystalBall and Excel Environment

  • Sep 01, 2011
  • Hongxiang Ouyang +1
  • Research Article
  • Citations2

Quantitative Decision-Making Framework to Evaluate Environmental Commitment Tracking Systems

  • Jan 01, 2012
  • Transportation Research Record: Journal of the Transportation Research Board
  • Mehmet E Ozbek +2
  • Conference Article
  • Citations8

Engineering, procurement and construction (EPC) project management for reducing cost and time: A case study of petrochemical plant

  • May 01, 2018
  • Supakan Sangroungrai +2
  • Research Article
  • Citations1

ANALISIS PELAKSANAAN PENJADWALAN PROYEK PEMBANGUNAN GEDUNG CLUBHOUSE DENGAN PENDEKATAN CPM DAN PERT PADA PT. XY

  • Apr 30, 2018
  • JKIE (Journal Knowledge Industrial Engineering)
  • Kasid Kasid +1
  • Research Article
  • Citations42

Schedule risk analysis for new-product development: The GERT method extended by a characteristic function

  • Jun 16, 2017
  • Reliability Engineering & System Safety
  • Liangyan Tao +3
  • Single Book
  • Citations10

Strategic Planning and Decision Making in State Departments of Transportation

  • May 06, 2004
  • National Academies Of Sciences, Engineering, And Medicine
  • Abstract
  • Citations1

P02 Promotion of Active Transportation among State Departments of Transportation in the US

  • Jun 01, 2015
  • Journal of Transport & Health
  • Jennifer Dill
  • Research Article

Evaluating the Michigan Access Management Program

  • Jan 01, 2011
  • Transportation Research Record: Journal of the Transportation Research Board
  • William L Eisele +2
  • Research Article
  • Citations15

Criticality measurement in fuzzy project scheduling

  • May 22, 2019
  • International Journal of Construction Management
  • Mohammad A Ammar +1
  • Book Chapter
  • Citations7

Chapter 3 - Prefeasibility Assessment of a Tidal Energy System

  • Oct 19, 2018
  • Tidal Energy Systems
  • Vikas Khare +3
  • Research Article
  • Citations6

Life-cycle cost comparison of chip seal and striping: in-house workers versus private contractors

  • Feb 11, 2019
  • Engineering, Construction and Architectural Management
  • Kishor Shrestha +2
  • Research Article

Assessment of Schedule Quality Problems from the DOT Schedule Reviewers’ Perspective: Case of TxDOT

  • Mar 31, 2024
  • Transportation Research Record: Journal of the Transportation Research Board
  • Junghye Son +3
  • Research Article

Compensation Pathways for Utility Accommodation on Public Rights of Way

  • Aug 03, 2023
  • Transportation Research Record: Journal of the Transportation Research Board
  • Tarig Omer +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.