• Home
  • Search
  • A Differential Evolution Algorithm for Solving Resource Constrained Project Scheduling Problems
  • Cite Icon9
  • https://doi.org/10.1007/978-3-319-28270-1_18Copy DOI Icon

A Differential Evolution Algorithm for Solving Resource Constrained Project Scheduling Problems

  • Jan 1, 2016
  • Ismail M Ali +3 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

The resource constrained project scheduling problem is considered as a complex scheduling problem. In order to solve this NP-hard problem, an efficient differential evolution DE algorithm is proposed in this paper. In the algorithm, improved mutation and crossover operators are introduced with an aim to maintain feasibility for generated individuals and hence being able to converge quickly to the optimal solutions. The algorithm is tested on a set of well-known project scheduling problem library PSPLIB, with instances of 30, 60, 90 and 120 activities. The proposed DE is shown to have superior performance in terms of lower average deviations from the optimal solutions compared to some of the state-of-the-art algorithms.

Similar Papers
  • Book Chapter

Chemical Reaction Optimization for Solving Resource Constrained Project Scheduling Problem

  • Jan 01, 2020
  • Lecture notes of the Institute for Computer Sciences, Social Informatics and Telecommunications Engineering
  • Ohiduzzaman Shuvo +1
  • Research Article
  • Citations4

Application of Three Meta-Heuristic Algorithms for Maximizing the Net Present Value of a Resource-Constrained Project Scheduling Problem with Respect to Delay Penalties

  • Jan 01, 2016
  • International Journal of Applied Industrial Engineering
  • Masoud Rabbani +3
  • Research Article
  • Citations4

An S-graph Based Approach for Multi-Mode Resource-Constrained Project Scheduling with Time-Varying Resource Capacities

  • Aug 01, 2018
  • Chemical engineering transactions
  • Olivér Ősz +1
  • Research Article
  • Citations29

Solving the Resource Constrained Project Scheduling Problem using the parallel Tabu Search designed for the CUDA platform

  • Nov 26, 2014
  • Journal of Parallel and Distributed Computing
  • Libor Bukata +2
  • Supplementary Content
  • Citations1

Discrete Time-Cost Tradeoff Model for Optimizing Multi-Mode Construction Project Resource Allocation

  • Aug 20, 2015
  • American Journal of Civil Engineering and Architecture
  • Shuangshuang Nie +1
  • PDF
  • Research Article
  • Citations8

Review of conventional metaheuristic techniques for resource-constrained project scheduling problem

  • Jan 01, 2022
  • Journal of Project Management
  • Amir Golab +3
  • Research Article
  • Citations26

Resource-Constrained Project Scheduling Problem under Multiple Time Constraints

  • Dec 07, 2020
  • Journal of Construction Engineering and Management
  • Feng Kong +1
  • Research Article
  • Citations21

Genetic algorithm stopping criteria for optimization of construction resource scheduling problems

  • Jan 01, 2013
  • Construction Management and Economics
  • Jin-Lee Kim
  • Research Article
  • Citations19

Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach

  • Jan 01, 2021
  • IEEE Access
  • Md Humyun Fuad Rahman +2
  • Book Chapter
  • Citations32

On the Multi-mode, Multi-skill Resource Constrained Project Scheduling Problem – A Software Application

  • Jan 01, 2011
  • Mónica A Santos +1
  • Research Article
  • Citations10

Mixed-integer linear programming for project scheduling under various resource constraints

  • Jun 27, 2024
  • European Journal of Operational Research
  • Nicklas Klein +2
  • Research Article
  • Citations2

Time-Cost Trade Off Resource-Constrained Project Scheduling Problem with Stochastic Duration and Time Crashing

  • Jan 01, 2018
  • International Journal of Applied Decision Sciences
  • Zhe Zhang +1
  • Research Article
  • Citations1

Solving Extended Project Scheduling Problems

  • Oct 01, 2020
  • Műszaki Tudományos Közlemények
  • Krisztián Mihály +1
  • Research Article
  • Citations11

On some implementations of solving the resource constrained project scheduling problems

  • Jan 01, 2019
  • YUJOR
  • E.Kh Gimadi +2
  • Research Article
  • Citations2

A Genetic Algorithm Based Solution with Schedule Mode for RCPSP

  • Jul 04, 2011
  • Advanced Materials Research
  • Yan Hua Ren +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.