A Differential Evolution-Based Algorithm to Schedule Flexible Assembly Lines

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Scheduling is key towards improving the performance of a Flexible Assembly Line (FAL). In this paper, a Bilevel Differential Evolution (BiDE) algorithm to solve a FAL scheduling problem is proposed. The BiDE algorithm optimizes the performance of the FAL with respect to two criteria: the weighted sum of Earliness/Tardiness (E/T) penalties and the balance of the FAL. The performance of BiDE is evaluated using the data sets available in the literature and an evolutionary heuristic algorithm published earlier called BiGA. The experimental results show that the BiDE algorithm can solve the FAL scheduling problem effectively and exhibits a superior performance over BiGA.Note to Practitioners-This paper was motivated by the problem of allocating time and equipment resources efficiently in a flexible assembly line to improve its performance. Among the different methods to solve this problem, heuristic search techniques are becoming more popular. Current work in literature have proposed a heuristic search algorithm to solve this problem. However, there is ambiguity in the model. This paper aims to clarify the ambiguity in the proposed flexible assembly line model, as well as applying a different heuristic search algorithm for comparison purposes. Experimental results show that the proposed technique can solve the problem effectively.

Similar Papers
  • Single Book
  • Citations52

Production Planning and Scheduling in Flexible Assembly Systems

  • Jan 01, 1999
  • Tadeusz Sawik
  • Research Article
  • Citations11

Research on balancing and sequencing problems of flexible mixed model assembly lines with alternative precedence relations

  • Dec 10, 2022
  • International Journal of Production Research
  • Yunfang Peng +3
  • Research Article

Research of the Architecture of the Flexible Assembly Line Based on the Extension Method and Multi-Agent

  • Feb 01, 2014
  • Advanced Materials Research
  • Le Gao +3
  • Research Article
  • Citations2

A heuristic search algorithm for Hamiltonian circuit problems in directed graphs

  • Oct 15, 2019
  • Wireless Networks
  • Dawei Jin +2
  • Conference Article

Modeling and optimizing of flexible mixed-flow assembly line scheduling problem with non-tight operations priority constraints

  • Aug 01, 2020
  • Hali Pang +1
  • Research Article

Variable-Number Differential Evolution and its Application on Uranium Ore Classification

  • Aug 30, 2013
  • Advanced Materials Research
  • Chao Yu +2
  • Conference Article
  • Citations7

A heuristic bidirectional search algorithm for automatic Web service composition

  • Jan 01, 2010
  • Bo Zhang
  • Conference Article

A Mathematical Model for the Lexicographic Bottleneck Mixed-Model Flexible Assembly Line Balancing Problem

  • Jan 15, 2020
  • Islam Ali +2
  • Research Article
  • Citations23

Workspace Synthesis for Flexible Fixturing of Stampings

  • Aug 01, 1999
  • Journal of Manufacturing Science and Engineering
  • Jinkoo Lee +2
  • Research Article
  • Citations18

Improving multi-agent manufacturing control system by indirect communication based on ant agents

  • May 03, 2017
  • Proceedings of the Institution of Mechanical Engineers, Part I: Journal of Systems and Control Engineering
  • Ali Vatankhah Barenji +1
  • Research Article
  • Citations34

Some complexity results in cyclic scheduling

  • Jul 01, 1994
  • Mathematical and Computer Modelling
  • S.T Mccormick +1
  • Research Article
  • Citations7

Planning of distribution substations, feeders and sectionalizing switches using heuristic algorithms

  • Jun 01, 1996
  • International Journal of Electrical Power & Energy Systems
  • Y-.Y Hsu +1
  • Research Article
  • Citations4

Intelligent traffic analysis: A heuristic high-dimensional image search algorithm based on spatiotemporal probability for constrained environments

  • May 15, 2020
  • Alexandria Engineering Journal
  • Xingli Huang +2
  • Research Article
  • Citations48

Hybrid method integrating agent-based modeling and heuristic tree search for scheduling of complex batch processes

  • Sep 18, 2013
  • Computers & Chemical Engineering
  • Yunfei Chu +2
  • Conference Article
  • Citations3

ANN

  • Dec 23, 2016
  • Guangli Li +5
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.