- Conference Article
1
- 10.1109/coase.2017.8256290
Multi-point to multi-point multi-task fourth party logistics routing problem considering tardiness risk
- Aug 01, 2017
- Lishuai Deng + 3 more +3
Under uncertainty environment, tardiness risk is inevitable when we transport logistics task. In this paper, aimed at the problem of multi-point to multi-point and multi-task, we propose path optimization mathematical model considering tardiness risk which is described by Value-at-Risk. The model aims to minimize tardiness risk's maximum of all tasks based on the constraints of total cost, carrying capacity requirements; we can measure tardiness risk of different confidence levels. Considering to the characteristics of the problem, we design the Ant Colony Optimization (ACO) algorithm and the Dynamic Ant Colony Optimization (DACO) algorithm. According to numerical analysis, we can conclude that the DACO algorithm can improve the stability of solution and global search ability compared with the ACO algorithm, and tardiness risk increases with the increase of the confidence level.
Read more