Optimization of Cycle Time in an Assembly Line Balancing Problem
- Jan 01, 2016
- Procedia Technology
- A.S Vishnu Raj + 3 more +3
Optimization of Cycle Time in an Assembly Line Balancing Problem
A genetic algorithm based approach to the mixed-model assembly line balancing problem of type II
Optimization of Cycle Time in an Assembly Line Balancing Problem
Optimization of Cycle Time in an Assembly Line Balancing Problem
A new hybrid genetic algorithm to solve more realistic mixed-model assembly line balancing problem
Continuous and unexpected changes in demands of customised products force companies to produce various types of products, concurrently. One of the intelligent methods to satisfy various customer demands and compete with rivals in today's business environment is to assemble diverse models on the same assembly line, simultaneously. So, mixed-model assembly line balancing problem with parallel workstations and zoning constraints is studied in this paper. Firstly, relevant studies in the literature were presented in a summary. Then, solutions have been sought with hybrid genetic algorithm that is obtained from the combination of modified Comsoal method and genetic algorithm. Computational experiments were carried out on 20 benchmark problems to demonstrate the superiority of the proposed algorithm. The obtained results were compared with the results of pure genetic algorithm and other previous researches. Obviously, it has been observed that proposed algorithm has promising solution capacity especially on large-sized mixed-model assembly line balancing problems.
Read moreMathematical model and bee algorithms for mixed-model assembly line balancing problem with physical human–robot collaboration
Mathematical model and bee algorithms for mixed-model assembly line balancing problem with physical human–robot collaboration
Read moreSolving Mixed-Model Assembly Lines Using a Hybrid of Ant Colony Optimization and Greedy Algorithm
The assembly line balancing problem deals with the assignment of tasks to work stations. Mixed-model assembly line problem is a type of assembly line balancing problem at which two or more models of the same product are assembled sequentially at the same line. To achieve optimality and efficiency of solving this problem, tasks at each work station have to be well balanced satisfying all constraints. This paper deals with the mixed-model assembly line balancing problem (MALBP) in which the objective is to minimize the cycle time for a given number of work stations. The problem is solved by using a hybrid of an ant colony optimization and a greedy algorithm (Ant-Greedy). MATLAB Software is used to perform the proposed method. Then, the proposed method is applied to a real case problem found in the literature for the assembly line of automatic changeover in the Electronic Industries Company in Iraq. The results of the proposed method are compared with the performance of the Merging Shortest and Longest Operation (MMSLO) method. The comparison shows that the Ant-Greedy optimization method is more efficient, where the efficiency increased from 93.53% for MMSLO method to 97.26% for the Ant-Greedy method.
Read moreA heuristic approach for balancing mixed-model assembly line of type I using genetic algorithm
The mixed model assembly line is becoming more important than the traditional single model due to the increased demand for higher productivity. In this paper, a set of procedures for mixed-model assembly line balancing problems (MALBP) is proposed to make it efficiently balance. The proposed procedure based on the meta heuristics genetic algorithm can perform improved and efficient allocation of tasks to workstations for a pre-specified production rate and address some particular features, which are very common in a real world mixed model assembly lines (e.g. use of parallel workstations, zoning constraints, resource limitation). The main focus of this study is to study and modify the existing genetic algorithm framework. Here a heuristic is proposed to reassign the tasks after crossover that violates the constraints. The new method minimises the total number of workstation with higher efficiency and is suitable for both small and large scale problems. The method is then applied to solve a case of a plastic bag manufacturing company where the minimum number of workstations is found performing more efficiently.
Read moreA linear physical programming model for assembly line balancing problem
A linear physical programming model for assembly line balancing problem
Examining Rebalancing Considers of the Mixed-Model Assembly Line Type-II for the Straight and U-shaped Layout Using the Taguchi Method
Facing the increasingly competitive market environment, assembly lines are gained attention because of the assembly process expenditure consumes more than 20 % of the manufacturing cost, and also improve its products to meet demand. In this paper, an attempt has been made to develop worker-task assigned to workstation heuristic (W-TAWH) approach for solving mixed-model assembly line balancing problem (M-MALBP), in which the assembly tasks have to be assigned to workstations, and each workstation needs to select only one of the available operators to perform the assigned tasks corresponding to the straight and U-shaped assembly lines with the objective minimum cycle time. The performance of the developed approach was evaluated and validated through applying the practical case in the Dayla State Company for Electrical Industries (DSCEI) particularly in the electric transformer factory (ETF). Taguchi method was used to evaluate the contribution of each one of the considerations in the assembly line are solution approach, layout, sequence vector (SV), and workstation numbers. All results proved the stated considerations have impact significant in any trying to re-balance the assembly line.
Read moreMILP models and metaheuristic for balancing and sequencing of mixed-model two-sided assembly lines
Mixed-model assembly lines are becoming increasingly popular due to flexibility of producing customised products. In a mixed-model assembly line, line balancing and model sequencing problems are tightly interrelated and very important for efficiency. This paper proposes a new assembly line configuration based on paced mixed-model two-sided assembly lines where balancing and sequencing problems are considered simultaneously. Minimal work has been reported considering both problems simultaneously for this type of assembly line configuration. Two mixed-integer linear programming (MILP) models are developed and a restarted SA algorithm with new encoding, decoding and neighbourhood procedures is developed. The parameters of the proposed algorithm are selected based on a statistical technique and the performance of it is tested on a set of new benchmark problems. The computational results demonstrate the effectiveness of the MILP models and the high efficiency of the proposed algorithm. The proposed algorithm outperforms the comparative original SA algorithm. [Received 22 July 2016; Revised 1 December 2016; Accepted 14 February 2017]
Read moreMulti-objective optimization of mixed-model assembly lines incorporating musculoskeletal risks assessment using digital human modeling
In line with Industry 5.0, ergonomic factors have recently received more attention in balancing assembly lines to enhance the human-centric aspect. Meanwhile, today’s mass-customized trend yields manufacturers to offset the assembly lines for different product variants. Thus, this study addresses the mixed-model assembly line balancing problem (MMALBP) by considering worker posture. Digital human modeling and posture assessment technologies are utilized to assess the risks of work-related musculoskeletal disorders using a method known as rapid entire body analysis (REBA). The resulting MMALBP is formulated as a mixed-integer linear programming (MILP) model while considering three objectives: cycle time, maximum ergonomic risk of workstations, and total ergonomic risks. An enhanced non-dominated sorting genetic algorithm (E-NSGA-II) is developed by incorporating a local search procedure that generates neighborhood solutions and a multi-criteria decision-making mechanism that ensures the selection of promising solutions. The E-NSGA-II is benchmarked against Epsilon-constraint, MOGA, and NSGA-II while solving a case study and also test problems taken from the literature. The computational results show that E-NSGA-II can find promising Pareto front solutions while dominating the considered methods in terms of performance metrics. The robustness of E-NSGA-II results is evaluated through one-way ANOVA statistical tests. The analysis of results shows that a smooth distribution of time and ergonomic loads among the workstations can be achieved when all three objectives are simultaneously considered.
Read moreSimultaneous balancing and buffer allocation decisions for the design of mixed-model assembly lines with parallel workstations and stochastic task times
Simultaneous balancing and buffer allocation decisions for the design of mixed-model assembly lines with parallel workstations and stochastic task times
Read moreCoupling a genetic algorithm approach and a discrete event simulator to design mixed-model un-paced assembly lines with parallel workstations and stochastic task times
Coupling a genetic algorithm approach and a discrete event simulator to design mixed-model un-paced assembly lines with parallel workstations and stochastic task times
Read moreModeling and solving multi-objective mixed-model assembly line balancing and worker assignment problem
Modeling and solving multi-objective mixed-model assembly line balancing and worker assignment problem
A goal programming approach to mixed-model assembly line balancing problem
A goal programming approach to mixed-model assembly line balancing problem
An efficient multiobjective genetic algorithm for mixed-model assembly line balancing problem considering demand ratio-based cycle time
Mixed-model assembly lines (mALs) are becoming more and more important by producing different models of the same product on an assembly line. How to calculate the cycle time based on demand of different models also making problem more difficult. According to different work experiences and skill level, the processing time of a given task and the operating costs such as wages differ among workers. Appointing the proper worker to the proper station and assigning the suitable task to the suitable station in order to decrease the cycle time, increase the line efficiency, and reduce the total cost make the problem more complex. This paper proposes a new concept for calculating the cycle time based on demand ratio of each model and another one for calculating the human resource cost. A generalized Pareto-based scale-independent fitness function genetic algorithm (gp-siffGA) is described for solving mixed-model assembly lines balancing (mALB) problems to minimize the cycle time, the variation of workload and the total cost under the constraint of precedence relationships at the same time. The gp-siffGA uses Pareto dominance relationship to solve the problems without using relative preferences of multiple objectives. Comparisons with existing multiobjective genetic algorithms demonstrate that our approach efficiently solves mALB problems.
Read moreHybrid Behavior Ant Colony Optimization for Mixed-model Assembly Line Balancing Problem
For the purpose of solving mixed-model assembly line balancing problem (MMALBP), MMALBP is transformed into a single-model assembly line balancing problem with a combined precedence diagram. A hybrid behavior ant colony optimization with pheromone summation rules for MMALBP is proposed. The proposed algorithm makes use of the trail information which is deposited between the task and the task selected position, and pheromone summation rules are adopted. Hybrid search mechanism, which comprehensively considers utilization, exploration and random search, are adopted. Global pheromone trail update and local pheromone trail update are considered. The heuristic information is set to the position weight for tasks of MMALBP, which collaboratively considers the operation time of assembly task and the number of follow-up tasks. Finally, example verification is carried out, and which indicates the validity of the proposed algorithm.
Read more