Abstract

A hybrid algorithm for the multi-stage flow shop group scheduling with sequence-dependent setup and transportation times

Similar Papers
  • Research Article
  • Citations23

A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem

  • Jan 01, 2013
  • International Journal of Systems Science
  • Cheng-Dar Liou +2
  • Research Article
  • Citations24

Group-shop scheduling with sequence-dependent set-up and transportation times

  • Apr 01, 2014
  • Applied Mathematical Modelling
  • Fardin Ahmadizar +1
  • Research Article
  • Citations57

A discrete differential evolution algorithm for flow shop group scheduling problem with sequence-dependent setup and transportation times

  • May 09, 2020
  • Journal of Intelligent Manufacturing
  • Shuaipeng Yuan +2
  • Research Article
  • Citations49

Solving a multi-objective job shop scheduling problem with sequence-dependent setup times by a Pareto archive PSO combined with genetic operators and VNS

  • Aug 11, 2010
  • The International Journal of Advanced Manufacturing Technology
  • Reza Tavakkoli-Moghaddam +2
  • Research Article
  • Citations16

An improved artificial bee colony algorithm for solving open shop scheduling problem with two sequence-dependent setup times

  • Jan 01, 2019
  • Procedia CIRP
  • Zilong Zhuang +5
  • Research Article

A novel heuristic method for flexible job-shop scheduling problem with sequence-dependent setup time, transportation time and machine efficiency constraints

  • Sep 30, 2025
  • Archives of Control Sciences
  • Jolanta Krystek +1
  • Research Article
  • Citations19

Scheduling algorithms for parallel machines with sequence-dependent set-up and distinct ready times: Minimizing total tardiness

  • Jun 01, 2007
  • Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
  • Sang-Il Kim +2
  • Research Article
  • Citations44

Joint optimization of a flow-shop group scheduling with sequence dependent set-up times and skilled workforce assignment

  • Feb 17, 2014
  • International Journal of Production Research
  • Antonio Costa +2
  • Research Article
  • Citations122

Hybridizing ant colony optimization via genetic algorithm for mixed-model assembly line balancing problem with sequence dependent setup times between tasks

  • Aug 14, 2012
  • Applied Soft Computing
  • Sener Akpınar +2
  • Research Article
  • Citations13

Application of graph search and genetic algorithms for the single machine scheduling problem with sequence-dependent setup times and quadratic penalty function of completion times

  • Oct 22, 2013
  • Computers & Industrial Engineering
  • Viswanathan Kodaganallur +2
  • Research Article
  • Citations169

A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect

  • Mar 16, 2012
  • International Journal of Production Economics
  • Nima Hamta +3
  • Book Chapter
  • Citations4

Solving Optimization Problem with Particle Swarm Optimization: Solving Hybrid Flow Shop Scheduling Problem with Particle Swarm Optimization Algorithm

  • Jan 01, 2021
  • Fatma Selen Madenoğlu
  • Research Article
  • Citations65

A novel combination of Particle Swarm Optimization and Genetic Algorithm for Pareto optimal design of a five-degree of freedom vehicle vibration model

  • Dec 03, 2012
  • Applied Soft Computing
  • M.J Mahmoodabadi +3
  • Research Article
  • Citations14

Minimizing total weighted tardiness on a single machine with sequence-dependent setup and future ready time

  • Feb 05, 2013
  • The International Journal of Advanced Manufacturing Technology
  • Yue Xi +1
  • Conference Article
  • Citations8

A hybrid algorithm for earliness-tardiness scheduling problem with sequence dependent setup time

  • Nov 22, 2002
  • Li Wang +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.