• Home
  • Search
  • A modified colonial competitive algorithm for the mixed-model U-line balancing and sequencing problem
  • Cite Icon48
  • https://doi.org/10.1080/00207543.2011.653453Copy DOI Icon

A modified colonial competitive algorithm for the mixed-model U-line balancing and sequencing problem

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Implementation of mixed-model U-shaped assembly lines (MMUL) is emerging and thriving in modern manufacturing systems owing to adaptation to changes in market demand and application of just-in-time production principles. In this study, the line balancing and model sequencing (MS) problems in MMUL are considered simultaneously, which results in the NP-hard mixed-model U-line balancing and sequencing (MMUL/BS) problem. A colonial competitive algorithm (CCA) is developed and modified to solve the MMUL/BS problem. The modified CCA (MCCA) improves performance of original CCA by introducing a third type of country, independent country, to the population of countries maintained by CCA. Implementation details of the proposed CCA and MCCA are elaborated using an illustrative example. Performance of the proposed algorithms is tested on a set of test-bed problems and compared with that of existing algorithms such as co-evolutionary algorithm, endosymbiotic evolutionary algorithm, simulated annealing, and genetic algorithm. Computational results and comparisons show that the proposed algorithms can improve the results obtained by existing algorithms developed for MMUL/BS.

Similar Papers
  • Research Article
  • Citations64

Integrating ant colony and genetic algorithms in the balancing and scheduling of complex assembly lines

  • Jun 10, 2015
  • The International Journal of Advanced Manufacturing Technology
  • Ibrahim Kucukkoc +1
  • Research Article
  • Citations110

A Coevolutionary Algorithm for Balancing and Sequencing in Mixed Model Assembly Lines

  • Nov 01, 2000
  • Applied Intelligence
  • Yeo Keun Kim +2
  • Research Article
  • Citations7

A Mathematical Model for an Integrated Assembly Line Regarding Learning and Fatigue Effects

  • Jan 08, 2021
  • Robotica
  • Reza Eslamipoor +1
  • Research Article
  • Citations247

A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem

  • Mar 15, 2008
  • International Journal of Production Research
  • S Agrawal +1
  • Research Article
  • Citations2

Minimising by Simulation‐Based Optimisation the Cycle Time for the Line Balancing Problem in Real‐World Environments

  • Jan 01, 2025
  • Applied Stochastic Models in Business and Industry
  • Luis A Moncayo–Martínez +2
  • Research Article
  • Citations70

Balancing of robotic mixed-model two-sided assembly line with robot setup times

  • Jun 18, 2014
  • The International Journal of Advanced Manufacturing Technology
  • Mojtaba Aghajani +2
  • Research Article
  • Citations3

An Efficient Q-Learning-Based Multi-Objective Intelligent Hybrid Genetic Algorithm for Mixed-Model Assembly Line Efficiency

  • May 22, 2025
  • Symmetry
  • Mudassar Rauf +4
  • Research Article
  • Citations1

An Artificial Immune System Approach for Type E Assembly Line Balancing Problem

  • Dec 09, 2018
  • International Journal of Engineering & Technology
  • Mohd Nor Akmal Khalid +2
  • Research Article
  • Citations31

A risk-averse two-stage stochastic programming model for a joint multi-item capacitated line balancing and lot-sizing problem

  • Oct 09, 2021
  • European Journal of Operational Research
  • Yuchen Li +3
  • PDF
  • Research Article
  • Citations35

A Network Model for Parallel Line Balancing Problem

  • Jan 01, 2007
  • Mathematical Problems in Engineering
  • Recep Benzer +3
  • Book Chapter
  • Citations14

Artificial bee colony algorithms for two-sided assembly line worker assignment and balancing problem

  • Jun 21, 2017
  • Mukund Nilakantan Janardhanan +3
  • Research Article
  • Citations16

Heuristic production line balancing problem solution with MATLAB software programming

  • Nov 07, 2016
  • International Journal of Clothing Science and Technology
  • Aysun Türkmen +2
  • Research Article
  • Citations46

Balancing U-shaped assembly lines with resource dependent task times: A Simulated Annealing approach

  • Jun 02, 2014
  • Journal of Manufacturing Systems
  • Sachin Jayaswal +1
  • Research Article
  • Citations59

A goal programming mixed-model line balancing for processing time and physical workload

  • Jan 08, 2009
  • Computers & Industrial Engineering
  • Gyunghyun Choi
  • Research Article

Development of an application for balancing product flow lines through genetic algorithms

  • Jan 01, 2016
  • International Journal of Business Excellence
  • Manuel F Silva +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.