• Home
  • Search
  • A Modified Priority-Based Encoding for Design of a Closed-Loop Supply Chain Network Using a Discrete League Championship Algorithm
  • Cite Icon20
  • https://doi.org/10.1155/2018/8163927Copy DOI Icon

A Modified Priority-Based Encoding for Design of a Closed-Loop Supply Chain Network Using a Discrete League Championship Algorithm

Show More
  • Abstract
  • PDF
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

In a closed-loop supply chain network, the aim is to ensure a smooth flow of materials and attaining the maximum value from returning and end-of-life goods. This paper presents a single-objective deterministic mixed integer linear programming (MILP) model for the closed-loop supply chain (CLSC) network design problem consisting of plants, collection centers, disposal centers, and customer zones. Our model minimizes the total costs comprising fixed opening cost of plants, collection, disposal centers, and transportation costs of products among the nodes. As supply chain network design problems belong to the class of NP-hard problems, a novel league championship algorithm (LCA) with a modified priority-based encoding is applied to find a near-optimal solution. New operators are defined for the LCA to search the discrete space. Numerical comparison of our proposed encoding with the existing approaches in the literature is indicative of the high quality performance of the proposed encoding.

Loading PDF

Similar Papers
  • Research Article
  • Citations60

Closed-Loop Supply Chain Network Design Under Demand and Return Uncertainty

  • Nov 01, 2017
  • Transportation Science
  • Halit Üster +1
  • Research Article
  • Citations2

A case-oriented computational study for sustainable fleet planning in a battery closed-loop supply chain network under uncertainty

  • Sep 12, 2023
  • Engineering Computations
  • Kemal Subulan +1
  • Research Article
  • Citations64

A Green Dual-Channel Closed-Loop Supply Chain Network Design Model

  • Dec 13, 2021
  • Journal of Cleaner Production
  • Yigit Kazancoglu +4
  • Research Article
  • Citations18

Embedding risk in closed-loop supply chain network design

  • Jul 03, 2017
  • Journal of Modelling in Management
  • Surya Prakash +2
  • Research Article
  • Citations22

A multi-stage stochastic programming model for sustainable closed-loop supply chain network design with financial decisions: A case study of plastic production and recycling supply chain

  • Aug 26, 2019
  • Scientia Iranica
  • Amir Salar Mohammadi +3
  • Research Article
  • Citations4

Application of Hybrid Genetic Algorithm for CLSC Network Design Problem in Fashion Footwear Industry—A Case Study Approach

  • Jan 01, 2016
  • Journal of Service Science and Management
  • Muthusamy Aravendan +1
  • PDF
  • Research Article
  • Citations6

Carbon market sensitive robust optimization model for closed loop supply chain network design under uncertainty

  • Jan 01, 2019
  • Journal of Physics: Conference Series
  • F Mohammed +2
  • Research Article
  • Citations300

A robust fuzzy optimization model for carbon-efficient closed-loop supply chain network design problem: a numerical illustration in electronics industry

  • Dec 02, 2015
  • Journal of Cleaner Production
  • Mohammad Talaei +4
  • Research Article
  • Citations8

Evaluating Supply Chain Network Designs: An Approach Based on SNA Metrics and Random Forest Feature Selection

  • Dec 29, 2021
  • Universal Journal of Operations and Management
  • Sara Akbar Ghanadian +1
  • Research Article
  • Citations11

A closed loop supply chain network design problem with multi-mode demand satisfaction in fuzzy environment

  • Jul 17, 2020
  • Journal of Intelligent & Fuzzy Systems
  • Ali Mahmoodirad +2
  • Research Article
  • Citations9

Robust Hazardous Materials Closed-Loop Supply Chain Network Design with Emergency Response Teams Location

  • Feb 12, 2021
  • Transportation Research Record: Journal of the Transportation Research Board
  • Nasrin Mohabbati-Kalejahi +1
  • Research Article
  • Citations32

A fuzzy bi-objective mixed-integer programming method for solving supply chain network design problems under ambiguous and vague conditions

  • May 25, 2014
  • The International Journal of Advanced Manufacturing Technology
  • Kaveh Khalili-Damghani +2
  • PDF
  • Research Article
  • Citations24

Closed loop supply chain network design with fuzzy tactical decisions

  • Jan 28, 2016
  • Journal of Industrial Engineering International
  • Mahtab Sherafati +1
  • Research Article

Cost optimization in closed-loop supply chain network design: a multi-period MILP model incorporating discount incentives and environmental awareness

  • Mar 11, 2026
  • Cogent Engineering
  • Rahmi Yuniarti +2
  • Book Chapter

Selection of Transportation Channels in Closed-Loop Supply Chain Using Meta-Heuristic Algorithm

  • Jan 01, 2020
  • Sonu Rajak +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.