• Home
  • Search
  • A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem with makespan minimization
  • Cite Icon24
  • https://doi.org/10.1007/s00170-008-1881-yCopy DOI Icon

A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem with makespan minimization

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

This paper proposes a modified shifting bottleneck heuristic (MSBH) for the reentrant job shop scheduling problem (RJSSP) with makespan minimization objective. Recently, the reentrant job shop has come into prominence as a new type of manufacturing shop. The principle characteristic of a reentrant job shop is that a job may visit certain machines more than once during the process flow, whereas in the classic job shop, each job visits a machine only once. The shifting bottleneck heuristic (SBH) is one of the most successful heuristic approaches for the classical job shop scheduling problem, which decomposes the problem into a number of single-machine subproblems. This paper adapts the SBH for the RJSSP and proposes a new sequencing heuristic for the single-machine maximum lateness subproblem considering the reentrant jobs in order to handle large-size RJSSPs. It also uses a subproblem criticality measure that further shortens the implementation time. The proposed MSBH is tested by using instances up to 20 machines and 100 jobs, and it is illustrated that good quality solutions can be obtained in reasonable computational times. A real-life application of the MSBH is also given as a case study to evaluate its performance.

Similar Papers
  • Research Article
  • Citations75

Lot streaming for product assembly in job shop environment

  • Mar 12, 2007
  • Robotics and Computer-Integrated Manufacturing
  • F.T.S Chan +2
  • Conference Article
  • Citations6

A Novel Artificial Immune Algorithm for Job Shop Scheduling

  • Jun 01, 2009
  • Lu Hong
  • Book Chapter

Cooperative Ant Colony Algorithm for Flexible Manufacturing Systems

  • Dec 12, 2018
  • Asmaa Kamal +2
  • PDF
  • Research Article
  • Citations77

Flexible Job Shop Scheduling Problem Using an Improved Ant Colony Optimization

  • Jan 01, 2017
  • Scientific Programming
  • Lei Wang +3
  • Research Article

A genetic-operator-integrated whale optimization algorithm for solving the flexible job shop scheduling problem

  • Oct 16, 2025
  • Journal of King Saud University - Computer and Information Sciences
  • Ying Duan +5
  • Research Article
  • Citations7

The Machine Duplication Problem in a Job Shop with Two Jobs

  • Jan 01, 1995
  • International Transactions in Operational Research
  • A Agnetis +1
  • Book Chapter

Recent Bio-inspired Algorithms for Solving Flexible Job Shop Scheduling Problem: A Comparative Study

  • Jan 01, 2020
  • Dongsheng Yang +3
  • Conference Article
  • Citations16

Analysis of double-resource flexible job shop scheduling problem based on genetic algorithm

  • Mar 01, 2018
  • Chao Peng +3
  • Research Article
  • Citations277

Ant colony optimization combined with taboo search for the job shop scheduling problem

  • Aug 22, 2006
  • Computers & Operations Research
  • Kuo-Ling Huang +1
  • Research Article
  • Citations16

An extended flexible job shop scheduling problem with parallel operations

  • Jul 26, 2018
  • ACM SIGAPP Applied Computing Review
  • Willian Tessaro Lunardi +1
  • PDF
  • Research Article
  • Citations5

Application of Levy flight-based harmony search algorithm for the flexible job shop scheduling

  • May 24, 2025
  • Scientific Reports
  • Jun Li +1
  • Research Article
  • Citations2

Solving flexible job-shop scheduling problem using harmony search-based meerkat clan algorithm

  • Jun 01, 2022
  • IAES International Journal of Artificial Intelligence (IJ-AI)
  • Muna Mohammed Jawad +2
  • Research Article
  • Citations73

Using multiple objective tabu search and grammars to model and solve multi-objective flexible job shop scheduling problems

  • Dec 01, 2004
  • Journal of Intelligent Manufacturing
  • Adl Baykasoğlu +2
  • Supplementary Content

Job Shop Scheduling with Flexible Maintenance Planning

  • Aug 09, 2017
  • University of Lancaster
  • Ivar Struijker Boudier
  • Book Chapter
  • Citations4

Transient Chaotic Discrete Neural Network for Flexible Job-Shop Scheduling

  • Jan 01, 2005
  • Xinli Xu +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.