  • A Multistage Robust Transmission Expansion Planning Model Based on Mixed Binary Linear Decision Rules—Part I
  • Cite Icon48
  • https://doi.org/10.1109/tpwrs.2018.2799946Copy DOI Icon

A Multistage Robust Transmission Expansion Planning Model Based on Mixed Binary Linear Decision Rules—Part I

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

This two-paper series introduces a new multistage robust approach for solving the transmission expansion planning (TEP) problem under the uncertainty of loads and wind power productions. The proposed multistage robust TEP model is formulated using mixed binary and linear decision rules, which aims at finding a solution withstanding any realization of the uncertain parameters belonging to a set-based uncertainty model. The robustness of the optimal expansion plan can be adjusted by the budget of uncertainty. The first part of this two-paper series presents the extended and compact formulations for a deterministic TEP problem. Then, the compact formulation of the TEP problem under the uncertainty of loads and wind power productions is introduced as a multistage robust optimization problem, which is reformulated using mixed binary and linear decision rules. The extended formulation of these decision rules, as functions of uncertain parameters, is presented in this part as well.

Similar Papers
  • Conference Article
  • Citations9

Transmission Network Expansion Planning under Wind Farm Uncertainties Using Cuckoo Search Algorithm

  • Jan 01, 2014
  • S.S Taheri +2
  • Supplementary Content

Efficient reduction techniques for a large-scale Transmission Expansion Planning problem

  • Jan 01, 2019
  • Research Repository (Delft University of Technology)
  • Quentin Ploussard
  • Research Article
  • Citations22

Transmission expansion planning using multivariate interpolation

  • May 28, 2015
  • Electric Power Systems Research
  • Ebrahim Mortaz +3
  • Research Article
  • Citations2

Long-Term Multiyear Transmission Expansion Planning in Turkish Power System

  • May 25, 2024
  • International Transactions on Electrical Energy Systems
  • Ahmet Ova +2
  • Research Article
  • Citations1

A new adequacy evaluation method for transmission expansion planning problems

  • Jul 01, 2016
  • Scientia Iranica
  • M.R Habibi +2
  • Book Chapter
  • Citations7

Chapter 2 - Expansion planning of transmission networks

  • Nov 13, 2020
  • Uncertainties in Modern Power Systems
  • Hesam Mazaheri +3
  • Research Article
  • Citations9

Transmission expansion planning in a wind-dominated power system: A closed-loop approach

  • Feb 18, 2024
  • Sustainable Energy, Grids and Networks
  • Adham E Ragab +1
  • Conference Article

Transmission expansion planning based on hybrid EDA/DE algorithm considering wind power penetration

  • Jun 01, 2015
  • Wenxia Liu +4
  • Conference Article
  • Citations1

Contingency-Constrained Transmission Expansion Planning Considering a Representative Daily Demand Curve

  • Sep 01, 2018
  • J Isai Garcia-Mercado +1
  • PDF
  • Research Article
  • Citations6

Analysis of Constraint-Handling in Metaheuristic Approaches for the Generation and Transmission Expansion Planning Problem with Renewable Energy

  • Oct 02, 2018
  • Complexity
  • Lourdes Martínez-Villaseñor +4
  • Research Article
  • Citations19

Literature review of transmission expansion planning problem test systems: detailed analysis of IEEE-24

  • Sep 03, 2021
  • Electric Power Systems Research
  • Selçuk Mutlu +1
  • Research Article
  • Citations1

TEP Considering Wind Farms, Network Congestion, Line Repairs, and Reliability

  • Oct 17, 2018
  • Iranian Journal of Science and Technology, Transactions of Electrical Engineering
  • Majid Ajalli +1
  • Research Article
  • Citations8

Interactive fuzzy satisfying-based HVDC/AC transmission expansion planning considering investment cost and network loss

  • Apr 18, 2016
  • International Transactions on Electrical Energy Systems
  • Hasan Doagou-Mojarrad +2
  • Conference Article
  • Citations1

A novel approach for transmission expansion planning to a real system (400KV system of WBSEDCL)

  • Jan 01, 2014
  • P K Das +3
  • Research Article
  • Citations7

Transmission Expansion Planning Considering an Hourly Demand Curve

  • Mar 01, 2018
  • IEEE Latin America Transactions
  • Nestor GonzáLez-Cabrera +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.