• Home
  • Search
  • A new CSP graph-based representation to resource-constrained project scheduling problem
  • Cite Icon9
  • https://doi.org/10.1109/cec.2014.6900543Copy DOI Icon

A new CSP graph-based representation to resource-constrained project scheduling problem

  • Jul 1, 2014
  • Antonio Gonzalez-Pardo +1 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Resource-Constrained Project Scheduling Problem (RCPSP) is a NP-hard combinatorial problem that consists in scheduling different activities in such a way the resource, precedence, and temporal constraints are satisfied. The main problem when dealing with NP-hard problems is the exponential growth of the computational resources needed to solve the problems. This work is an extension of a previous one, where a new CSP graph-based representation to solve Constraint Satisfaction Problems (CSP) by using Ant Colony Optimization (ACO) were proposed. This paper studies the behaviour of the CSP graph-based representation when it is applied to a real-world complex problem, in this case the RCPSP. The dataset used in this work has been extracted from Project Scheduling Problem Library (PSPLIB). Experimental results show that the proposed approach provides excellent results, closer to the optimum values published in the PSPLIB repository. Also, it has been analysed how the number of jobs and the number of different execution modes affect the performance of the algorithm.

Similar Papers
  • Research Article
  • Citations4

An Enhanced Discrete Bees Algorithm for Resource Constrained Optimization Problems

  • Dec 25, 2019
  • Inteligencia Artificial
  • Mohamed Amine Nemmich +2
  • Research Article
  • Citations25

Fuzzy-based adaptive sample-sort simulated annealing for resource-constrained project scheduling

  • Jan 27, 2007
  • The International Journal of Advanced Manufacturing Technology
  • Sanjay Kumar Shukla +2
  • Research Article
  • Citations3

Estimation of Distribution Algorithm for solving the Multi-mode Resource Constrained Project Scheduling Problem

  • Apr 24, 2020
  • EAI Endorsed Transactions on Energy Web
  • Gaafar Sadeq S Mahdi +3
  • Research Article
  • Citations3

A Two-Phase Algorithm for a Resource Constrained Project Scheduling Problem with Discounted Cash Flows

  • Jan 01, 2013
  • Decision Making in Manufacturing and Services
  • Marcin Klimek +1
  • Research Article
  • Citations36

Comparative study of pheromone control heuristics in ACO algorithms for solving RCPSP problems

  • Jun 24, 2017
  • Applied Soft Computing
  • Antonio Gonzalez-Pardo +2
  • Research Article
  • Citations1

A RESOURCE OPTIMISATION BASED HEURISTIC FOR RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM

  • Aug 30, 2019
  • NED University Journal of Research
  • Mazhar Ali +2
  • Conference Article
  • Citations11

Recent trends in solving the deterministic resource constrained Project Scheduling Problem

  • Mar 01, 2013
  • A Karam +1
  • Research Article
  • Citations5

A hybrid evolutionary algorithm for the resource-constrained project scheduling problem

  • Oct 30, 2012
  • Artificial Life and Robotics
  • Arit Thammano +1
  • Conference Article
  • Citations7

Radius particle swarm optimization for resource constrained project scheduling problem

  • Mar 01, 2014
  • Mana Anantathanvit +1
  • Research Article
  • Citations93

Resource constrained project scheduling with uncertain activity durations

  • Jan 03, 2017
  • Computers & Industrial Engineering
  • Ripon K Chakrabortty +2
  • Research Article
  • Citations11

Dynamic Optimization of the Multi-Skilled Resource-Constrained Project Scheduling Problem with Uncertainty in Resource Availability

  • Aug 25, 2022
  • Mathematics
  • Min Wang +2
  • Conference Article
  • Citations1

Improved Ant Colony Algorithm for Solving Multi-modal Resource Constrained Project Scheduling Problem

  • Jan 01, 2022
  • Jie Chen +2
  • Research Article
  • Citations325

A branch and bound algorithm for the resource-constrained project scheduling problem

  • Jun 01, 1998
  • European Journal of Operational Research
  • Peter Brucker +3
  • Research Article
  • Citations95

Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem

  • Dec 21, 2010
  • Expert Systems with Applications
  • Ruey-Maw Chen
  • Research Article
  • Citations6

Resource-constrained project scheduling with ant colony optimization algorithm

  • Dec 30, 2020
  • Journal of Civil Engineering
  • Niken Anggraini Savitri
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.