• Home
  • Search
  • A Probe-Based Algorithm for Piecewise Linear Optimization in Scheduling
  • Cite Icon11
  • https://doi.org/10.1023/a:1021897321637Copy DOI Icon

A Probe-Based Algorithm for Piecewise Linear Optimization in Scheduling

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

A scheduling problem with piecewise linear (PL) optimization extends conventional scheduling by imposing a conjunction of combinatorial PL constraints involving the objective function variables. To solve this problem, this paper presents a hybrid algorithm where Constraint Programming (CP) search is supported and driven by a (integer) linear programming solver running on a well-controlled subproblem which is dynamically tightened. The paper discusses and compares different ways of decomposing the problem constraints between the CP search and the solver. We show how the subproblem structure and the piecewise linearity are exploited by the search.

Similar Papers
  • Research Article
  • Citations10

An Integrated Approach for Shift Scheduling and Rostering Problems with Break Times for Inbound Call Centers

  • Nov 21, 2018
  • Mathematical Problems in Engineering
  • Turgay Türker +1
  • Research Article
  • Citations4

Trade-Off Ratio Functions for Linear and Piecewise Linear Multi-objective Optimization Problems

  • Nov 28, 2020
  • Journal of Optimization Theory and Applications
  • Siming Pan +3
  • Conference Article
  • Citations1

Minimizing Cumulative Batch Processing Time for an Industrial Oven Scheduling Problem

  • Jan 01, 2021
  • DROPS (Schloss Dagstuhl – Leibniz Center for Informatics)
  • Marie-Louise Lackner +4
  • PDF
  • Research Article
  • Citations7

Continuous Piecewise Linear Approximation of Plant-Based Hydro Production Function for Generation Scheduling Problems

  • Feb 24, 2022
  • Energies
  • David Lucas Dos Santos Abreu +1
  • Research Article
  • Citations18

Solution and Optimization of Systems of Pseudo-Boolean Constraints

  • Oct 01, 2007
  • IEEE Transactions on Computers
  • Fadi A Aloul +3
  • Research Article
  • Citations4

Piecewise smooth extreme functions are piecewise linear

  • Sep 14, 2018
  • Mathematical Programming
  • Marco Di Summa
  • Research Article
  • Citations2

Purchase and production optimization in a meat processing plant

  • Aug 27, 2025
  • International Transactions in Operational Research
  • Marek Vlk +3
  • PDF
  • Research Article
  • Citations11

Exact methods for the Oven Scheduling Problem

  • Jun 01, 2023
  • Constraints
  • Marie-Louise Lackner +4
  • Research Article
  • Citations11

An Iterative local-search framework for solving constraint satisfaction problem

  • Jan 05, 2008
  • Applied Soft Computing Journal
  • Mohamed Tounsi +1
  • Research Article
  • Citations15

Constraint Satisfaction Problems over Numeric Domains

  • Jan 01, 2017
  • DROPS (Schloss Dagstuhl – Leibniz Center for Informatics)
  • Manuel Bodirsky +1
  • Research Article
  • Citations19

Constraint programing for solving four complex flexible shop scheduling problems

  • Feb 21, 2021
  • IET Collaborative Intelligent Manufacturing
  • Leilei Meng +7
  • Book Chapter
  • Citations19

Flexible, Rule-Based Constraint Model Linearisation

  • Apr 21, 2016
  • Sebastian Brand +3
  • Research Article
  • Citations63

A Hybrid MIP–CP Approach to Multistage Scheduling Problem in Continuous Casting and Hot-Rolling Processes

  • Oct 01, 2019
  • IEEE Transactions on Automation Science and Engineering
  • Yuanyuan Tan +4
  • Research Article
  • Citations18

Learning with continuous piecewise linear decision trees

  • Nov 03, 2020
  • Expert Systems with Applications
  • Qinghua Tao +5
  • Research Article
  • Citations31

Evaluating the solution performance of IP and CP for berth allocation with time-varying water depth

  • Feb 09, 2016
  • Transportation Research Part E: Logistics and Transportation Review
  • Tianbao Qin +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.