Abstract

This study aims to identify the causes of excessive change orders and their impact on public construction projects in Saudi Arabia. This should support the organizations working in the construction industry to improve variation order management (VOM) as a preventive action by dealing proactively with variation order causes. Therefore, a new methodology was proposed to minimize change orders and their impact on the successful completion of projects as well as cost during the project lifecycle. The methodology involved ten selected turnkey building projects at King Faisal University (KFU) campus, Saudi Arabia. Statistical analyses were conducted to predict the cost overrun in project size and contract value. The findings showed the most significant causes leading to variation order in public construction projects. These include the combined effect of the designer and owner technical committee, designer document, and owner stakeholder committee. Hence, a new model for VOM was developed as a best practice approach, including three stages. The first stage is the initiation process, which includes seven procedures, seven tools, and key responsibilities. The second stage deals with the course of change orders based on a certain number of procedures and weight for each parameter assigned to this phase. It supports decision processes based on a certain average ratio of weights calculation. The third stage is the decision to support decision makers in proceeding or not proceeding with the variation order. Although the present study was conducted in Saudi Arabia’s public building construction project, it is envisaged that these research results are widely applicable to other developing countries. The paper presents a direction for further research to enhance the impact of cost overrun in public sector construction projects in developing countries, i.e., Saudi Arabia.

Loading PDF

Similar Papers
  • Research Article
  • Citations21

Effects of change orders on the budget of the public sector construction projects in the kingdom of Saudi Arabia

  • Nov 29, 2023
  • Results in Engineering
  • Loai Alkhattabi +2
  • PDF
  • Research Article
  • Citations1

Success Factors of the Consultant Selection Stage of the Ghanaian Public Construction Projects: The Road Sector’s Perspective

  • Jul 03, 2024
  • Construction Economics and Building
  • Chelteau Barajei +6
  • Research Article
  • Citations7

Exploring the application of BIM in Tanzanian public sector projects using social network analysis

  • May 30, 2023
  • Built Environment Project and Asset Management
  • Abdullatif Abdallah +2
  • Research Article
  • Citations26

Success factors for implementing Uganda’s public road construction projects

  • Mar 21, 2019
  • International Journal of Construction Management
  • Noah Mwelu +4
  • Research Article
  • Citations25

Theoretical framework of the causes of construction time and cost overruns

  • Nov 01, 2017
  • IOP Conference Series: Materials Science and Engineering
  • K Ullah +4
  • Research Article

Impact of Risk Management on the Successful Completion of Construction Projects in Public Primary Schools: A Case Study of Dodoma Urban District, Tanzania

  • Dec 09, 2025
  • Journal of Entrepreneurship and Project Management
  • Pascal Tuja +1
  • PDF
  • Research Article
  • Citations2

Study on Risk Management Practices on Public Building Construction Project: In Case of Eastern Wollega Zone

  • Jan 01, 2021
  • American Journal of Civil Engineering
  • Zelalem Mebrate
  • Research Article
  • Citations3

Factors Affecting the Client's Performance in the Public Construction Projects: Case Study of Oman

  • Sep 02, 2020
  • International Journal of Sustainable Construction Engineering and Technology
  • Mohamed A Albarami +2
  • Research Article
  • Citations5

Evaluation of insurance policies in the Saudi Arabian construction contracts

  • May 23, 2024
  • Heliyon
  • Fahad K Alqahtani +5
  • Research Article
  • Citations31

Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam

  • Sep 30, 2020
  • The Journal of Asian Finance, Economics and Business
  • Thong Quoc Vu +5
  • Research Article
  • Citations7

ASSESSMENT OF FACTORS AFFECTING ACCURACY OF COST ESTIMATION IN PUBLIC BUILDING CONSTRUCTION PROJECTS IN WESTERN OROMIA REGION, ETHIOPIA

  • Sep 30, 2020
  • Journal of Civil Engineering, Science and Technology
  • Jifara Chimdi +3
  • Research Article
  • Citations49

Collaboration in public construction—contractual incentives, partnering schemes and trust

  • Dec 01, 2012
  • Engineering Project Organization Journal
  • Geert Dewulf +1
  • Book Chapter

Suggestions for implementing geotechnical risk management

  • Jun 01, 2009
  • Martin Th Van Staveren
  • Conference Article

Principles of using project management tools and techniques of mitigate components causing delays and disruption in public and private construction projects in Iraq

  • Jan 01, 2022
  • AIP conference proceedings
  • Layth Qasim Shakir +1
  • Research Article
  • Citations3

Critical Success Factors for Public Sector Projects in Lagos

  • Apr 17, 2023
  • Organization and Human Capital Development
  • Yusuf Adedayo Lawal +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.