• Home
  • Search
  • A Vertical Mining System Concept Using DTH for Seafloor Mining
  • Cite Icon3
  • https://doi.org/10.4043/25825-msCopy DOI Icon

A Vertical Mining System Concept Using DTH for Seafloor Mining

  • May 4, 2015
  • Watanabe Keisuke +3 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Abstract In the concept of subsea mining field development, a subsea crawler generally has a big drill and scrapes the mineral deposit horizontally. In this "Horizontal Mining System (HMS)", ores vary in size and large chunks should be crushed into transportable particles. So the Subsea Crushing and Feeding Unit (SCFU) must be required for efficient slurry transportation to use the traditional riser system. In this paper, we introduce and discuss our "Vertical Mining System (VMS)" concept, which consists of a Down-The-Hole Drill (DTH) unit mounted on a jack up platform. This vertical mining system can be used for both exploration and production of the subsea mineral deposit. The DTH unit makes the mineral deposit into powder-like particles while it digs into the hole. We executed drilling experiments on land with a granite rock using a DTH unit. The result showed the drilled particle size were less than 1mm, which indicates that this method allows us to transport the ore slurry directly through the traditional riser/pump system. Because the ore particle is even and small enough, the Subsea Crushing Unit (SCU) can be eliminated. So we believe the total project cost and period can be reduced compared to the HMS concept. The maximum drill length can be from 30 to 50 m. The mining speed per a DTH is determined by the drill diameter and the drilling speed depending on the rock strength. At present, in our granite experiments, the DTH drilling speed was around 3.0 cm/sec. The desired production amount is achieved by installing plural drilling units. We deploy the jack up platform instead of a crawler considering several reasons. The priority is we need to keep the xy coordinate of the drilling unit precisely controlled for efficient field layout. The second reason is we should keep the drill stem vertically even though the seabed has a slope or it is uneven. It is a gravity type jack up with 4 legs and has a set of xy horizontally sliding actuators which enables us to position the drill units automatically on the seabed. The horizontal size of the jack up is around 15 m times 15 m. The position of the platform will be changed continuously by suspending it with the support vessel's crane after it digs the 10 meters square seabed area. A subsea ore separator will be settled near the platform to select high-grade ore from low-grade ore on the seabed, which reduces not only the transportation cost/time but also the amount of marine disposal from the surface facility.

Similar Papers
  • Research Article
  • Citations450

Thermal osteonecrosis and bone drilling parameters revisited

  • Aug 30, 2007
  • Archives of Orthopaedic and Trauma Surgery
  • Goran Augustin +5
  • Research Article
  • Citations43

Sensitivity analysis of drill wear and optimization using Adaptive Neuro fuzzy –genetic algorithm technique toward sustainable machining

  • Oct 30, 2017
  • Journal of Cleaner Production
  • Lip Huat Saw +6
  • Research Article
  • Citations1

Drilling Of Tio2 and Zns Filled Gfrp Composites: A Taguchi Approach

  • Jan 01, 2014
  • International Journal of Manufacturing, Materials, and Mechanical Engineering
  • Arun K V +2
  • Research Article

DRILLING MECHANISM BASED ON THE APPLICATION OF DIAMOND DRILLING BITS

  • Apr 25, 2022
  • PAHTEI-Procedings of Azerbaijan High Technical Educational Institutions
  • Azad Bagirov Azad Bagirov +1
  • Research Article
  • Citations1

Multi-Response Optimization in Drilling of Composites: Introduction of a Similarity Based Approach in Combination with Taguchi's Philosophy

  • Nov 28, 2014
  • Journal for Manufacturing Science and Production
  • Kumar Abhishek +2
  • Conference Article
  • Citations20

Practical Approach To Achieve Accuracy In Sanding Prediction

  • Sep 11, 2006
  • K Qiu +5
  • PDF
  • Research Article
  • Citations4

Research on the Optimization of Cutting Path of Cantilever Roadheader in Large Section Excavation

  • Apr 28, 2022
  • Sustainability
  • Chengjun Hu +6
  • Conference Article

Analysis And Model Testing Of Flexible Riser Tie-Ins

  • May 02, 1994
  • A E Potts +2
  • Research Article
  • Citations18

Laser Induced Breakdown Spectroscopy (LIBS) for whole rock geochemistry

  • Jan 20, 2023
  • Journal of Geochemical Exploration
  • Fernando F Fontana +7
  • Research Article
  • Citations24

Extraction of Copper from a Low-Grade Ore by Rhamnolipids

  • Jun 15, 2004
  • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
  • Behnaz Dahrazma +1
  • Conference Article
  • Citations11

Sand Production Prediction for Horizontal Wells in Gas Storage Reservoirs

  • Nov 06, 2000
  • P J Mclellan +2
  • Research Article
  • Citations47

Recovery Improvement of Fine Iron Ore Particles by Multi Gravity Separation

  • Jun 25, 2009
  • The Open Mineral Processing Journal
  • Subrata Roy
  • Research Article

Utilization of Metabolic Citric Acid from <i>As</i><i>pergillus</i> <i>niger</i> Using Corn Starch in the Nickel Leaching of Indonesian Saprolitic Ore

  • Nov 01, 2015
  • Advanced Materials Research
  • Widi Astuti +3
  • Research Article
  • Citations9

Simulation Modeling of an Iron Ore Operation to Enable Informed Planning

  • Jan 01, 2010
  • Interdisciplinary Journal of Information, Knowledge, and Management
  • Jim Everett
  • PDF
  • Research Article
  • Citations5

Study and Application of Rock Drilling Resistance Characteristics in the Jiyang Depression Formation

  • May 08, 2024
  • Processes
  • Xiaoyong Ma +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.