• Home
  • Search
  • Access Delay Analysis in String Multi-hop Wireless Network Under Jamming Attack
  • https://doi.org/10.1007/978-3-030-05063-4_41Copy DOI Icon

Access Delay Analysis in String Multi-hop Wireless Network Under Jamming Attack

  • Jan 1, 2018
  • Jianwei Liu +1 more
Show More
  • Abstract
  • Literature Map
  • References
  • Similar Papers
Abstract

Wireless networks can be easily attacked by jammers due to their shared nature and open access to the wireless medium. Jamming attack can degrade the network performance significantly by emitting useless signals to the wireless channel, i.e. the access delay of nodes’ packets will increase under jamming scenarios. In order to analyze the impact of jamming attack, this paper investigates the access delay of nodes’ packets in a string multi-hop wireless network. Specially, a ring-based model is put forward to calculate the existing probability of the jammer based on the stochastic geometry theory. Then, the collision probabilities of the nodes in different locations are derived while considering the impact of neighbor nodes and jammers. At last, the access delay of the packets under IEEE 802.11 protocols is obtained. A series of numerical tests are conducted to illustrate the impact of different jamming probabilities or jammer densities on the access delay.

Similar Papers
  • Conference Article
  • Citations9

Providing survivability against jamming attack via joint dynamic routing and channel assignment

  • Oct 01, 2009
  • Shanshan Jiang +1
  • Conference Article
  • Citations2

An Improved Least-square based Jammer Localization Algorithm

  • Jan 01, 2023
  • Ruiqiong Tong +3
  • Conference Article
  • Citations1391

The feasibility of launching and detecting jamming attacks in wireless networks

  • May 25, 2005
  • Wenyuan Xu +3
  • Research Article
  • Citations8

Opportunistic Wiretapping/Jamming: A New Attack Model in Millimeter-Wave Wireless Networks

  • Dec 01, 2023
  • IEEE Transactions on Wireless Communications
  • Yuanyu Zhang +6
  • Research Article

Optimal Design for One-Dimensional ALOHA Ad Hoc Networks Based on Stochastic Geometry

  • Sep 01, 2015
  • International Journal of Distributed Sensor Networks
  • Seunghee Lee +1
  • Research Article
  • Citations120

Jamming attack detection in a pair of RF communicating vehicles using unsupervised machine learning

  • May 22, 2018
  • Vehicular Communications
  • Dimitrios Karagiannis +1
  • Research Article
  • Citations4

Defending wireless networks from radio interference attacks

  • Jan 01, 2007
  • Rutgers University Community Repository (Rutgers University)
  • Wade Trappe +1
  • PDF
  • Research Article
  • Citations4

On Optimal Antijamming Strategies in Sensor Networks

  • Apr 01, 2012
  • International Journal of Distributed Sensor Networks
  • Yanmin Zhu +1
  • Research Article
  • Citations10

The wireless network jamming problem subject to protocol interference

  • Nov 27, 2015
  • Networks
  • Hugh R Medal
  • Conference Article
  • Citations5

A new approach to detect radio jamming attacks in wireless networks

  • Apr 01, 2010
  • Ming Yu +3
  • Research Article
  • Citations3

Density Estimation in Randomly Distributed Wireless Networks

  • Aug 01, 2022
  • IEEE Transactions on Wireless Communications
  • Lorenzo Valentini +2
  • Research Article
  • Citations64

Mobility-Aware Coded Probabilistic Caching Scheme for MEC-Enabled Small Cell Networks

  • Jan 01, 2017
  • IEEE Access
  • Xinwei Liu +3
  • Research Article
  • Citations17

Effects of Jamming Attacks on Wireless Networked Control Systems Under Disturbance

  • Feb 01, 2023
  • IEEE Transactions on Automatic Control
  • Ahmet Cetinkaya +2
  • Conference Article
  • Citations7

LoRaWAN Performance Evaluation and Resilience under Jamming Attacks

  • Sep 01, 2022
  • Vaia Kalokidou +2
  • Conference Article
  • Citations6

Maximization of Wireless Mesh Networks Survivability to Assure Service Continuity under Intelligent Attacks

  • Mar 01, 2013
  • Yu-Shun Wang +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.