• Home
  • Search
  • Adaptive Production Control with Negotiating Agents in Modular Assembly Systems
  • Cite Icon11
  • https://doi.org/10.1109/smc.2019.8914498Copy DOI Icon

Adaptive Production Control with Negotiating Agents in Modular Assembly Systems

  • Oct 1, 2019
  • Sebastian Mayer +3 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

An increasing number of product variants caused by individualization drives industry to develop flexible modular assembly systems. In such systems, automated guided vehicles handle the material transport between decoupled workstations. This enables jobs to be flexibly routed through production, utilizing order and operation flexibility. Order flexibility denotes a partially flexible order of a job's operations, whereas operation flexibility is given, if at least one operation of a job is allocatable to more than one workstation. Managing the given flexibility and coordinating the automated guided vehicles in real production environments requires robust control algorithms. Exploiting the potential of Industry 4.0, this work presents a negotiation-based agent approach by decentralizing the problem: A job release agent defines the points in time and the product types of released jobs. Job routing agents negotiate with workstation agents to schedule their operations by minimizing makespan. Finally, a vehicle agent organizes the transports from workstation to workstation. The agent system has been successfully evaluated and achieved better results than earlier implementations.

Similar Papers
  • Single Book
  • Citations52

Production Planning and Scheduling in Flexible Assembly Systems

  • Jan 01, 1999
  • Tadeusz Sawik
  • Conference Article

Integrated Heterogeneous Micro-Nano Systems via Modular Designing and Flexible Assembly

  • Jan 01, 2011
  • Volume 11: Nano and Micro Materials, Devices and Systems; Microsystems Integration
  • Aditya Das +1
  • Research Article
  • Citations2

Modular production system concept for a water tap assembly

  • Jan 01, 1992
  • Computers and Electrical Engineering
  • P Voho +1
  • Research Article
  • Citations5

Simulation of a generic flexible assembly system

  • Jan 01, 2003
  • International Journal of Computer Integrated Manufacturing
  • N F Edmondson +1
  • Book Chapter

Flexible and Precision Assembly

  • Jan 01, 2023
  • Brian Carlisle
  • Conference Article
  • Citations3

Embedded flexible assembly system for car latch based on laser identification

  • Jan 01, 2006
  • Li Peiyu +2
  • Research Article
  • Citations19

Learning and reuse of engineering ramp-up strategies for modular assembly systems

  • Oct 18, 2013
  • Journal of Intelligent Manufacturing
  • Daniele Scrimieri +2
  • Research Article
  • Citations2

A concurrent development tool for flexible assembly systems

  • Jun 01, 1992
  • International Journal of Flexible Manufacturing Systems
  • Irving J Winters +1
  • Conference Article
  • Citations124

On operational flexibility in power systems

  • Jul 01, 2012
  • A Ulbig +1
  • Research Article
  • Citations17

A Flexible Robotic Assembly System Combining CAD Based Localization, Compliance Control, and a Multi-Modal Gripper

  • Oct 01, 2021
  • IEEE Robotics and Automation Letters
  • Gal Gorjup +3
  • Research Article
  • Citations13

Components of the Design Process of Flexible and Reconfigurable Assembly Systems

  • Jan 01, 2018
  • Procedia Manufacturing
  • Natalia Svensson Harari +2
  • Conference Article
  • Citations2

Simulation assisted design and installation of a flexible assembly system

  • Jan 01, 1989
  • J L Ballard +3
  • Research Article

Research on robot assembly technology based on adaptive impedance control

  • Jun 01, 2025
  • Journal of Physics: Conference Series
  • Junjun Feng +1
  • PDF
  • Book Chapter
  • Citations3

Adaptive Production Scheduling and Control in One-Of-A-Kind Production

  • Jan 11, 2012
  • Wei Li +1
  • Conference Article
  • Citations4

An OOT-supported migration approach to holonic robot assembly cell

  • May 26, 2004
  • Jianhui Li +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.