• Home
  • Search
  • An embedding formulation for the optimal scheduling and design of multipurpose batch plants
  • Cite Icon49
  • https://doi.org/10.1021/ie00061a027Copy DOI Icon

An embedding formulation for the optimal scheduling and design of multipurpose batch plants

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Summary of the Basic StepsThe basic steps in the suggested procedure for the optimal design of multi-purposebatch plants can be summarized as follows:1. List the candidate product groups.2. Obtain the super-structure that contains the candidate groups.3. Derive the horizon constraints..4. Examine the horizon constraints. If at least one horizon constraintimplicitly contains all the time periods, complete the merged formulationand solve the MINLP given in Equations (38) to (44) with the correspondinghorizon constraints. Otherwise, go to step 5.5. Select a product(s) that breaks the loop(s) in the super-structure. Treat thechosen product(s) as two or more artificial products.6. Revise the super-structure to include the additional products. Verify thatthe loop is broken. If this condition is met, go to step 7. Otherwise,return to step 5 and modify the products chosen for splitting.7. Derive the multi-period form of the constraints for the product(s) that aresplit into its (their) values for the time periods in which it (they) appear.Formulate the merged representation of the model for the rest of theproducts, including the horizon constraints. At least one horizonconstraint will contain implicitly all the time periods.Example 2The seven product, ten stage example problem of Suhami and Mah (1982) has beensolved to illustrate the design of a large multi-purpose batch plant. From the super-structure of this problem (Figure 4), the horizon constraints shown in Table II arederived.Using these constraints, the example has been solved with the merged formulation.Data for this problem appears in Table III. In addition, the following specificationshave been used: H = 6200 hr, a = 250 SFr, fi = 0.6, 1 < N <, 3, and 250 < V£ 10,000. As seen in Table IV, the MINLP formulation involves 48 variables and 67constraints. MINOS/Augmented (Murtagh and Saunders, 1980) required 16.09 secondsof CPU-time on a DEC-20 computer to solve the relaxed nonlinear program.

Similar Papers
  • Research Article
  • Citations14

Design and Synthesis of Multipurpose Batch Plants Using a Robust Scheduling Platform

  • Nov 07, 2013
  • Industrial &amp; Engineering Chemistry Research
  • Esmael R Seid +1
  • Research Article
  • Citations130

Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation

  • May 01, 2001
  • Computers &amp; Chemical Engineering
  • X Lin +1
  • Research Article
  • Citations121

Continuous-Time Models for Short-Term Scheduling of Multipurpose Batch Plants: A Comparative Study

  • Jul 28, 2006
  • Industrial &amp; Engineering Chemistry Research
  • Munawar A Shaik +2
  • Research Article
  • Citations5

Modeling and Optimization for Short-term Scheduling of Multipurpose Batch Plants

  • Apr 21, 2014
  • Chinese Journal of Chemical Engineering
  • Guohui Chen +2
  • Book Chapter

A novel mathematical formulation for short-term scheduling of multipurpose batch plants in chemical manufacturing

  • Jan 01, 2023
  • Computer Aided Chemical Engineering
  • Dan Li +2
  • Book Chapter
  • Citations19

Short-Term Scheduling

  • Nov 03, 2009
  • Thokozani Majozi
  • Research Article
  • Citations177

Continuous-discrete interactions in chemical processing plants

  • Jul 01, 2000
  • Proceedings of the IEEE
  • S Engell +3
  • Research Article
  • Citations12

Integrated batch plant design: A polymer plant case study

  • Jan 01, 1996
  • Computers &amp; Chemical Engineering
  • N Shah +3
  • Research Article
  • Citations4

Flexible Batch Process and Plant Design Using Mixed-Logic Dynamic Optimization: Single-Product Plants

  • Jun 26, 2014
  • Industrial &amp; Engineering Chemistry Research
  • Marta Moreno-Benito +2
  • Research Article
  • Citations34

Novel Continuous Time MILP Formulation for Multipurpose Batch Plants. 2. Integrated Planning and Scheduling

  • Oct 18, 2001
  • Industrial &amp; Engineering Chemistry Research
  • X X Zhu +1
  • Book Chapter

Network formulations for the design and scheduling of multiproduct batch plants with parallel lines

  • Jan 01, 2018
  • Computer Aided Chemical Engineering
  • Floor Verbiest +3
  • Book Chapter

A Continuous-time MILP Model for Direct Heat Integration in Batch Plants

  • Jan 01, 2015
  • Computer Aided Chemical Engineering
  • Pedro M Castro +2
  • Research Article
  • Citations6

Optimal design of batch plants under economic and ecological considerations: Application to a biochemical batch plant

  • Jan 24, 2007
  • Mathematical and Computer Modelling
  • A Dietz +3
  • Research Article
  • Citations2

A new methodology for the optimal design of batch fermentation plants

  • Sep 02, 2005
  • Biochemical Engineering Journal
  • Ricardo Simpson +2
  • Research Article
  • Citations99

Incorporating scheduling in the optimal design of multiproduct batch plants

  • Jan 01, 1989
  • Computers &amp; Chemical Engineering
  • D.B Birewar +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.