• Home
  • Search
  • An improved moss growth optimization algorithm for multi-equipment cooperative scheduling in automated container terminals under AGV failures
  • https://doi.org/10.1080/19427867.2026.2619410Copy DOI Icon

An improved moss growth optimization algorithm for multi-equipment cooperative scheduling in automated container terminals under AGV failures

Show More
  • Abstract
  • Literature Map
  • References
  • Similar Papers
Abstract

ABSTRACT The automated guided vehicle (AGV) failures cause operational interruptions in automated container terminals. This study investigates the multi-equipment cooperative scheduling problem involving quay cranes, AGVs, and yard cranes. A new mathematical programming model is formulated to minimize the operational makespan and energy consumption. Considering AGV failures, the deviation of rescheduling plan is concerned to propose a rescheduling optimization model. An improved moss growth optimization (IMGO) algorithm is designed with the Logistic-Tent mapping, adaptive disturbance strategy, and parallel computing method. Experimental results demonstrate the models could solve small-scale cases optimally. By comparison, the IMGO algorithm exhibits significantly faster solving time, and the average deviations from exact solutions are quite small. For medium/large-scale cases, the IMGO algorithm outperformed the standard MGO algorithm and co-learning imperial competition algorithm in solution quality and efficiency. Furthermore, the impacts of different operation modes and equipment configuration ratios on the operational efficiency and energy consumption are analyzed.

Similar Papers
  • PDF
  • Research Article
  • Citations25

A Hybrid Dynamic Method for Conflict-Free Integrated Schedule Optimization in U-Shaped Automated Container Terminals

  • Aug 25, 2022
  • Journal of Marine Science and Engineering
  • Bowei Xu +5
  • Research Article

Joint Quay Crane and Automated Guided Vehicle Scheduling Optimization in Automated Container Terminals Considering Spare Battery Constraints

  • Mar 05, 2026
  • Journal of Marine Science and Engineering
  • Zhen Yang +3
  • Research Article
  • Citations16

Trajectory planning for AGVs in automated container terminals using avoidance constraints: a case study

  • Jan 01, 2014
  • IFAC Proceedings Volumes
  • Jianbin Xin +2
  • Conference Article
  • Citations16

A hybrid genetic-heuristic algorithm for scheduling of automated guided vehicles and quay cranes in automated container terminals

  • Jul 01, 2009
  • S.M Homayouni +4
  • Book Chapter
  • Citations96

Simulation-based performance evaluation of transport vehicles at automated container terminals

  • Mar 01, 2004
  • Chang Ho Yang +2
  • Research Article
  • Citations12

Integrated optimization of automated guided vehicles and yard cranes considering charging constraints

  • Nov 25, 2023
  • Engineering Optimization
  • Xiaoju Zhang +2
  • Conference Article
  • Citations2

Design and Simulation of a Conceptual Automated Yard using New Combination System

  • Jan 01, 2006
  • Hong-Fa Ho +1
  • PDF
  • Research Article
  • Citations17

Storage Allocation in Automated Container Terminals: the Upper Level

  • Oct 01, 2016
  • Polish Maritime Research
  • Xia Mengjue +2
  • Research Article
  • Citations196

A Look-Ahead Dispatching Method for Automated Guided Vehicles in Automated Port Container Terminals

  • May 01, 2004
  • Transportation Science
  • Kap Hwan Kim +1
  • Research Article
  • Citations19

Flexible yard space allocation plan for new type of automated container terminal equipped with unilateral-cantilever rail-mounted gantry cranes

  • Oct 01, 2023
  • Advanced Engineering Informatics
  • Xurui Yang +2
  • Book Chapter
  • Citations1

Global Trends of the Cargo Handling Operations Automatization at Container Terminals

  • Jan 01, 2022
  • Igor Rusinov +2
  • Research Article
  • Citations22

Dispatching Electric AGVs in Automated Container Terminals with Long Travelling Distance

  • Mar 03, 2015
  • Journal of Coastal Research
  • Zhicheng Bian +3
  • PDF
  • Research Article
  • Citations42

Yard Operations and Management in Automated Container Terminals: A Review

  • Mar 15, 2022
  • Sustainability
  • Hang Yu +4
  • Research Article

Energy-aware dispatching for automated container terminals

  • Oct 15, 2025
  • Transportmetrica A: Transport Science
  • Lianhua An +5
  • Research Article
  • Citations185

Design, simulation, and evaluation of automated container terminals

  • Mar 01, 2002
  • IEEE Transactions on Intelligent Transportation Systems
  • C.-I Liu +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.