• Home
  • Search
  • An Innovative Inflow Control Device Technology with Sliding Sleeve Functionality Maximizes Recovery in Horizontal Wells
  • Cite Icon1
  • https://doi.org/10.2118/172642-msCopy DOI Icon

An Innovative Inflow Control Device Technology with Sliding Sleeve Functionality Maximizes Recovery in Horizontal Wells

  • Mar 8, 2015
  • Byung Lee +4 more
Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

Abstract Horizontal wells drilled in heterogeneous reservoirs present several challenges for reservoir management. Issues like early water breakthrough and inefficient drainage around the well in a reservoir with high contrast in permeability are very common in horizontal wells. An effective approach to address the challenges of horizontal wells and to increase the oil recovery is to complete the wells with inflow control device (ICD) technology. Most ICD technologies available in the market are passive inflow control devices that do not have the ability to change properties when unwanted fluids break through. The new ICD not only incorporates the benefits of passive ICD technology, it also incorporates sliding sleeves in the module that can be closed whenever the ICD starts producing water. This helps maximize the oil production from the well and reduces the problems related to handling of water at the surface facilities. This paper will demonstrate the effectiveness of the new hybrid ICD design. It is novel viscosity insensitive and may provide higher restriction to water over oil, and the successful operation of the sliding sleeve feature through a field case of a well drilled in a carbonate field in Middle East. Bottomhole pressure and weight indication observed through specialized fiber optic-installed coiled tubing confirmed the operability of technology by proper opening and closing of sliding sleeve. A fluid flow profile recorded by a production logging tool (PLT) on the same CT proved that the completion effectively equalized flow along the wellbore and will delay eventual water breakthrough while still producing at the desired production rates. PLT proved that the custom-designed completion with its appropriate number of compartments, number of ICD joints and flow resistance rating, achieved an optimized ICD completion.

Similar Papers
  • Conference Article
  • Citations14

Passive Inflow Control Device (ICDs) Aplication in Horizontal Wells Completions in Rubiales Area, Heavy Oil Reservoir

  • Sep 24, 2014
  • M Gómez Gualdrón +5
  • Conference Article
  • Citations4

Case Study- Real Time Downhole Telemetry CCL and Tension Compression, a Differentiator for Successful Manipulation of ICD's in Horizontal Wells

  • Dec 15, 2021
  • Usman Ahmed +2
  • Research Article
  • Citations3

Predicting Performance of High Deliverability Horizontal Gas Wells and Control of Water Cresting in Tertiary Sands East Africa

  • Jan 01, 2019
  • International Journal of Petroleum and Petrochemical Engineering
  • John Michael Tesha +3
  • Conference Article
  • Citations15

Multi-Phase (Oil-Water) Loop Flow Test for Helical and Hybrid Passive Inflow Control Devices

  • Mar 26, 2013
  • Byung O Lee +4
  • Conference Article
  • Citations13

ICD Design Optimisation with Single-Well Dynamic 3D Modelling and Real-Time Operation Support

  • Nov 12, 2016
  • Linda Van Der Bol +7
  • Conference Article
  • Citations13

Autonomous Inflow Control Valve Applications Creating Better Wells: A Review of Design Optimization and Associated Benefits

  • Mar 16, 2021
  • Mahmoud Abd El-Fattah +4
  • Conference Article
  • Citations8

Designing, Planning and Installation of an 8-Zone All-Electric Intelligent Completion System in an Extreme Reservoir Contact Well

  • Sep 15, 2015
  • S Jacob +3
  • Conference Article
  • Citations51

An Investigation of the Economic Benefit of Inflow Control Devices on Horizontal Well Completions Using a Reservoir-Wellbore Coupled Model

  • Oct 29, 2002
  • Jody R Augustine
  • Conference Article

Learnings from Inflow Control Devices (ICD) Design Optimization Utilizing Dynamic Reservoir Simulation Modeling

  • Feb 12, 2024
  • W Hidayat +2
  • Conference Article
  • Citations2

Production Logging Techniques Enable Appraising Emulsified Horizontal Boreholes Equipped with Inflow Control Devices

  • Jan 13, 2020
  • Ahmed Ghanmi +2
  • Conference Article
  • Citations9

Extended Reach Horizontal Well Development with Downhole Flow Control and Gravel Packing Sand Control: First Pilot in S-Field with Production Success

  • Oct 23, 2018
  • Dahlila Kamat +19
  • Conference Article
  • Citations8

Improving the Performance of EOR in Unconventional Oil Reservoirs Using Advanced Completion Technology

  • Apr 14, 2018
  • Michael Konopczynski +1
  • Conference Article
  • Citations3

Integration of Dynamic Modeling of ICD Completion Design and Well Placement Technology: A Case Study of GOM Shelf Reservoir

  • Oct 30, 2011
  • A Sharma +6
  • Conference Article
  • Citations3

Optimizing Production & Operation through Automated Well & Network Modeling

  • Oct 11, 2015
  • Mriganga Das +2
  • Conference Article
  • Citations4

Near Well Simulation and Modelling of Oil Production from Heavy Oil Reservoirs

  • Nov 25, 2015
  • Anjana Malagalage +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.