• Home
  • Search
  • An integrated decision support system for building asset management based on BIM and Work Breakdown Structure
  • Cite Icon60
  • https://doi.org/10.1016/j.jobe.2020.101959Copy DOI Icon

An integrated decision support system for building asset management based on BIM and Work Breakdown Structure

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

An integrated decision support system for building asset management based on BIM and Work Breakdown Structure

Similar Papers
  • Supplementary Content

Development of a Building Information Modelling Asset (BIMAsset) value realisation model

  • May 14, 2020
  • University of Liverpool
  • Mustapha Munir
  • Research Article
  • Citations1

Management of Land and Building Assets in Tolotio Village, Tibawa District, Gorontalo Regency

  • Mar 30, 2022
  • Journal La Bisecoman
  • Dian Fitriani Karim +2
  • Research Article
  • Citations39

Building information modelling to support maintenance management of healthcare built assets

  • Feb 13, 2019
  • Facilities
  • Nadeeshani Wanigarathna +3
  • Research Article
  • Citations26

Leveraging the relationship between BIM and asset management

  • Mar 01, 2014
  • Infrastructure Asset Management
  • David Pocock +3
  • PDF
  • Research Article
  • Citations46

BIM AND GIS INTEGRATION FOR INFRASTRUCTURE ASSET MANAGEMENT: A BIBLIOMETRIC ANALYSIS

  • Sep 03, 2020
  • ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences
  • M Garramone +5
  • Research Article
  • Citations60

A framework for the engineering asset management system

  • Oct 21, 2013
  • Journal of Quality in Maintenance Engineering
  • Khaled El-Akruti +1
  • Research Article
  • Citations108

Moving from building information models to digital twins for operation and maintenance

  • Jan 31, 2020
  • Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction
  • Qiuchen Lu +4
  • Research Article
  • Citations10

Information Quality for Effective Asset Management: A literature review

  • Jan 01, 2022
  • IFAC-PapersOnLine
  • Janet Y Chang +4
  • PDF
  • Research Article
  • Citations60

A Systematic Review of the Extent to Which BIM Is Integrated into Operation and Maintenance

  • Jul 15, 2022
  • Sustainability
  • Dania K Abideen +3
  • Research Article
  • Citations9

Building Information Modelling (BIM) for Facility Management (FM): Industry Survey of Building Assets

  • Jan 01, 2019
  • Journal of Facility Management Education and Research
  • Brandi Williams +3
  • Research Article

Scan to BIM for Building Asset Management

  • Oct 17, 2024
  • Proceedings of International Exchange and Innovation Conference on Engineering & Sciences (IEICES)
  • Hafizah Ramli +2
  • PDF
  • Book Chapter
  • Citations1

A Framework for Developing Information Requirements for Built Asset Management Based on Organisational Sustainability Objectives

  • Jan 01, 2024
  • Yujie Dong +3
  • Research Article
  • Citations124

WBS-based dynamic multi-dimensional BIM database for total construction as-built documentation

  • Jan 30, 2017
  • Automation in Construction
  • Jaehyun Park +1
  • Book Chapter

Bridging the gap between drainage design and BIM modelling

  • Jan 01, 2021
  • Richard Schofield +4
  • Conference Article
  • Citations3

Managing Sustainable Asset Networks using Advanced Information Systems

  • Dec 12, 2021
  • David Thorpe +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.