Abstract

Large scale manufacturing companies are growing along with ever-increasing demand from consumers, one of which is the heavy equipment industry. Excavators are the products of the heavy equipment division at XYZ Corp, where the Excavator assembly lines are single-model. Based on observations of existing conditions that occur at XYZ Corp, the production still cannot meet the demands of consumers. In the assembly process, the Excavator has a significant time difference from each work station, the distribution of work elements in the assembly process is uneven. In the Final assembly section (Zone C) there is a discrepancy between the takt time of Excavator products which is one reason for not achieving the demand. In resolving these problems, a line balancing process is needed, namely balancing workloads on each workstation. This study applies the Heuristic Priority Rules method as an initial solution and allocation constraint should be added as input from the Genetic Algorithms method to complete line balancing with a single-model system. Problems can be solved by increasing line efficiency from existing conditions by 60.4% to 91.74% and Smoothness index which decreases from 955.54 to 158.3977. The proposed result of balancing the final assembly of the excavator results in a better balance of assembly lines.

Similar Papers
  • Research Article
  • Citations10

An assembly line design and construction for a small manufacturing company

  • Apr 18, 2008
  • Assembly Automation
  • Ramazan Yaman
  • Research Article
  • Citations6

Optimizing Assembly Line Production through Line Balancing: A Case Study

  • May 18, 2015
  • Applied Mechanics and Materials
  • Adi Saptari +2
  • Research Article
  • Citations18

An approach to find task sequence for re‐balancing of assembly lines

  • Sep 28, 2010
  • Assembly Automation
  • Kürşad Ağpak
  • Research Article
  • Citations1

A Simulation Study on the Layout Design of Micro Assembly Line for Lens Module

  • Jan 01, 2014
  • IFAC Proceedings Volumes
  • Dug Hee Moon +4
  • Research Article
  • Citations10

Assembly Lines with Overlapping Work Stations

  • Sep 01, 1975
  • A I I E Transactions
  • Ravinder Nanda +1
  • Research Article

Handling product configuration changes during assembly

  • Jan 01, 2023
  • Procedia CIRP
  • Marcel Öfele +2
  • Research Article
  • Citations19

Line balancing of PCB assembly line using immune algorithms

  • Aug 01, 2003
  • Engineering with Computers
  • L.P Khoo +1
  • Research Article
  • Citations38

Enumerations and stability analysis of feasible and optimal line balances for simple assembly lines

  • Sep 18, 2015
  • Computers & Industrial Engineering
  • Yuri N Sotskov +3
  • Research Article
  • Citations102

Summary of a Heuristic Line Balancing Procedure

  • Oct 01, 1960
  • Management Science
  • Fred M Tonge
  • Research Article
  • Citations15

A bi‐objective ergonomic assembly line balancing model with conic scalarization method

  • Jul 26, 2022
  • Human Factors and Ergonomics in Manufacturing & Service Industries
  • Busra N Yetkin +1
  • PDF
  • Research Article
  • Citations4

Evaluation of redundant configurations in assembly lines with fractional tasks

  • Jun 07, 2022
  • Production Engineering
  • Paolo Renna
  • Research Article
  • Citations4

Calculation of Labor Amount with Theory of Constraints and Line Balancing Method in PT. XYZ Fish Crackers Factory

  • Jul 01, 2020
  • IOP Conference Series: Materials Science and Engineering
  • Lina Gozali +2

Optimasi Kapasitas Produksi Assembly Line LED Downlight PT. DEF

  • Apr 21, 2016
  • Ririn Desfiasri Desfiasr +1
  • Research Article
  • Citations9

RNA-Seq dataset of thoracic ganglia transcriptome across four ovarian development stages in Fenneropenaeus merguiensis

  • Apr 20, 2021
  • Data in Brief
  • Prasert Yodsawat +3
  • Book Chapter
  • Citations2

A Decision Support System for Assembly and Production Line Balancing

  • Apr 01, 2010
  • A. S. SIMARIA +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.