• Home
  • Search
  • Asymptotics for a bidimensional delay-claim risk model with subexponential claims and arbitrary dependence between the generic inter-arrival time pair
  • Cite Icon2
  • https://doi.org/10.1080/03610926.2023.2293642Copy DOI Icon

Asymptotics for a bidimensional delay-claim risk model with subexponential claims and arbitrary dependence between the generic inter-arrival time pair

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

This article considers a bidimensional delay-claim renewal risk model with a constant interest force, in which it is assumed that each main claim and its corresponding delayed claim from one business line satisfy a general dependence structure and the generic inter-arrival time pair from the two lines of main claims is arbitrarily dependent. In the presence of subexponential main and delayed claims, the corresponding asymptotic formulae for four types of finite-time ruin probabilities are established which extend some existing ones in the literature.

Similar Papers
  • Research Article
  • Citations6

On asymptotic finite-time ruin probabilities of a new bidimensional risk model with constant interest force and dependent claims

  • Jun 22, 2021
  • Stochastic Models
  • Bingzhen Geng +2
  • Research Article
  • Citations9

Asymptotics for a time-dependent renewal risk model with subexponential main claims and delayed claims

  • Jun 05, 2021
  • Statistics & Probability Letters
  • Yang Liu +2
  • Dissertation
  • Citations1

Study on insurance risk models with subexponential tails and dependence structures

  • Jan 01, 2009
  • Yiqing Chen
  • Conference Article

Extension of Some Asymptotic Results on Finite Time Ruin in Compound Poisson Model with Constant Interest Force and Diffusion

  • Aug 01, 2010
  • Tao Jiang +1
  • PDF
  • Research Article
  • Citations8

Ruin probabilities for a perturbed risk model with stochastic premiums and constant interest force

  • Sep 09, 2016
  • Journal of Inequalities and Applications
  • Jianhua Cheng +2
  • Research Article
  • Citations22

Asymptotic ruin probabilities for a bidimensional renewal risk model

  • Jan 10, 2017
  • Stochastics
  • Haizhong Yang +1
  • Research Article
  • Citations3

Asymptotic ruin probability for a by-claim risk model with pTQAI claims and constant interest force

  • Apr 03, 2019
  • Communications in Statistics - Theory and Methods
  • Cen Chen +1
  • Research Article
  • Citations1

Ruin Probability in a Semi-Markov Risk Model with Constant Interest Force and Heavy-Tailed Claims

  • Jul 01, 2013
  • Acta Mathematica Scientia
  • Hu Yang +1
  • Research Article
  • Citations5

UNIFORM ASYMPTOTICS FOR THE FINITE-TIME RUIN PROBABILITY IN A GENERAL RISK MODEL WITH PAIRWISE QUASI-ASYMPTOTICALLY INDEPENDENT CLAIMS AND CONSTANT INTEREST FORCE

  • Mar 31, 2013
  • Bulletin of the Korean Mathematical Society
  • Qingwu Gao +1
  • Research Article
  • Citations4

Asymptotics for random-time ruin probability in a time-dependent renewal risk model with subexponential claims

  • Apr 01, 2015
  • Journal of Industrial and Management Optimization
  • Qingwu Gao +3
  • Research Article
  • Citations6

THE ULTIMATE RUIN PROBABILITY OF A DEPENDENT DELAYED-CLAIM RISK MODEL PERTURBED BY DIFFUSION WITH CONSTANT FORCE OF INTEREST

  • May 31, 2015
  • Bulletin of the Korean Mathematical Society
  • Qingwu Gao +2
  • Research Article
  • Citations1

Upper bounds for ultimate ruin probabilities in the Sparre Andersen risk model with interest and a nonlinear dividend barrier

  • Jul 26, 2008
  • Statistics and Probability Letters
  • Wenquan Yang +1
  • PDF
  • Discussion
  • Citations6

Comment on the work of Zhang et al. (2017, Journal of Inequalities and Applications)

  • Jul 04, 2019
  • Journal of Inequalities and Applications
  • Yiqing Chen
  • Research Article
  • Citations2

Infinite-time absolute ruin in dependent renewal risk models with constant force of interest

  • Sep 28, 2016
  • Stochastic Models
  • Jiajun Liu +1
  • PDF
  • Research Article
  • Citations6

Numerical Ruin Probability in the Dual Risk Model with Risk-Free Investments

  • Oct 01, 2018
  • Risks
  • Sooie-Hoe Loke +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.