Automating Bridge Construction Scheduling Data with BIM and Machine Learning

  • Jan 1, 2024
  • Israel Simon Mariaca Clavel +2 more
Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

Conventional construction scheduling techniques often fall short due to inefficiencies, the prevalence of human error, and the lack of reliable scheduling data. Despite efforts to obtain better scheduling data and automate the process using Building Information Modelling (BIM) as a primary source of information, challenges persist. BIM models contain inconsistencies that can compromise their scheduling effectiveness. Moreover, existing automation efforts face obstacles, including complexity and scalability issues. These efforts frequently overlook the intricacies of accurately modelling construction tasks, neglecting resource considerations, subprocesses, and structured information management, which further complicates the creation of reliable and efficient construction schedule data. This research proposes a framework designed to systematically obtain scheduling data in an automated manner, aligning with a Work Breakdown Structure (WBS) to ensure organisational clarity. By incorporating subprocesses and focusing on resource constraint calculations and balancing. Furthermore, the framework structures scheduling data into a CSV format, facilitating easier analysis and integration with project management tools. The research follows the Design Science Research methodology. This multi-stage framework integrates BIM data extraction, automated element labelling, creation of a custom WBS, construction sequence, and resource balancing. The framework was developed using Python coding and libraries, facilitating seamless transitions between stages without manual intervention. The framework's performance is evaluated using 4D BIM software, assessing the generated data and logic in a girder bridge projects. This innovative framework enhances the accuracy and efficiency of construction data scheduling through automation. It reduces manual intervention, organises data effectively, and improves project timeline reliability. The use of 4D BIM further illustrates the practical application of this data in bridge projects, showcasing a scalable and robust contribution to construction automation.

Similar Papers
  • Research Article
  • Citations60

Application, Advantages, and Methods Associated with Using BIM in Commercial Construction

  • Mar 24, 2014
  • International Journal of Construction Education and Research
  • Clifton B Farnsworth +3
  • PDF
  • Research Article
  • Citations10

INTEGRATION OF BUILDING INFORMATION MODELING AND AGENT-BASED MODELING FOR EVACUATION SIMULATION

  • Dec 23, 2021
  • The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences
  • C Beyaz +4
  • Research Article
  • Citations12

Healthy BIM: the feasibility of integrating architecture health indicators using a building information model (BIM) computer system

  • Dec 18, 2020
  • Archnet-IJAR: International Journal of Architectural Research
  • Louis Rice
  • PDF
  • Research Article
  • Citations5

Thermal Performance Visualization Using Object−Oriented Physical and Building Information Modeling

  • Aug 25, 2020
  • Applied Sciences
  • Woonseong Jeong +2
  • Research Article

From 3D to 4D BIM: A Framework for Automating Construction Planning and Resource Optimization

  • Dec 25, 2025
  • Proceedings of Smart and Sustainable Built Environment Conference Series
  • Abdelrahman Khaled Mohamed Fakeeh Elsayed +2
  • Research Article
  • Citations2

Implementasi Sistem Building Information Modeling (BIM) Untuk Analisis Waktu dan Biaya (Studi Kasus Proyek Pembangunan Gedung Rumah Sakit Universitas Islam Malang)

  • Jul 26, 2023
  • Jurnal Ilmiah Universitas Batanghari Jambi
  • Rini Pebri Utari +1
  • Conference Article

Towards The Creation of BIM-Based Decision Support System to Assist Designers To Design-Out Brownfield Site Hazards

  • Jan 01, 2024
  • C Mahammedi +3
  • Research Article
  • Citations1

Literature Review: Pemanfaatan Building Information Modeling (BIM) dalam Konstruksi sebagai Alat Komunikasi dan Kolaborasi dalam Integrated Project Delivery (IPD)

  • Aug 12, 2025
  • Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil
  • Firman Parama Yudha +1
  • Research Article
  • Citations124

WBS-based dynamic multi-dimensional BIM database for total construction as-built documentation

  • Jan 30, 2017
  • Automation in Construction
  • Jaehyun Park +1
  • Research Article
  • Citations14

Exploring the rate of adoption and implementation depth of building information modeling (BIM): A case of Kuwait

  • Nov 04, 2023
  • Journal of Engineering Research
  • Haya Al-Roumi +1
  • Conference Article
  • Citations25

BIMCloud: A Distributed Cloud-Based Social BIM Framework for Project Collaboration

  • Jun 17, 2014
  • Moumita Das +2
  • Research Article

Implementation of BIM (Building Information Modeling) in the Construction Project of Coal Terminal

  • Dec 01, 2025
  • IOP Conference Series: Earth and Environmental Science
  • Hokky Santoso Sie +3
  • Book Chapter

Bridging the gap between drainage design and BIM modelling

  • Jan 01, 2021
  • Richard Schofield +4
  • PDF
  • Addendum
  • Citations5

Retraction Notice: Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-Span Steel-Box Arch Bridge Project

  • Jul 01, 2015
  • International Journal of Advanced Robotic Systems
  • Wenping Liu +3
  • PDF
  • Research Article
  • Citations10

Maintenance of Buildings Using BIM Methodology

  • Dec 31, 2014
  • The Open Construction and Building Technology Journal
  • A.Z Sampaio +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.