• Home
  • Search
  • Balancing assembly lines operating with heterogeneous workers under uncertainty in task processing times
  • Cite Icon7
  • https://doi.org/10.1108/ec-09-2020-0507Copy DOI Icon

Balancing assembly lines operating with heterogeneous workers under uncertainty in task processing times

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

PurposeThis paper considers the assembly line worker assignment and balancing problem of type-2 (ALWABP-2) with fuzzy task times. This problem is an extension of the (simple) SALBP-2 in which task times are worker-dependent and concurrently uncertain. Two criteria are simultaneously considered for minimization, namely, fuzzy cycle time and fuzzy smoothness index.Design/methodology/approachFirst, we show how fuzzy concepts can be used for managing uncertain task times. Then, we present a multiobjective genetic algorithm (MOGA) to solve the problem. MOGA is devoted to the search for Pareto-optimal solutions. For facilitating effective trade-off decision-making, two different MO approaches are implemented and tested within MOGA: a weighted-sum based approach and a Pareto-based approach.FindingsExperiments over a set of fuzzified test problems show the effect of these approaches on the performance of MOGA while verifying its efficiency in terms of both solution and time quality.Originality/valueTo the author’s knowledge, no previous published work in the literature has studied the biobjective assembly line worker assignment and balancing problem of type-2 (ALWABP-2) with fuzzy task times.

Similar Papers
  • Research Article
  • Citations81

ErgoALWABP: a multiple-rule based constructive randomized search algorithm for solving assembly line worker assignment and balancing problem under ergonomic risk factors

  • Jul 12, 2016
  • Journal of Intelligent Manufacturing
  • Sebnem Demirkol Akyol +1
  • Research Article
  • Citations38

Enumerations and stability analysis of feasible and optimal line balances for simple assembly lines

  • Sep 18, 2015
  • Computers & Industrial Engineering
  • Yuri N Sotskov +3
  • Research Article
  • Citations38

Uncertain programming models for multi-objective shortest path problem with uncertain parameters

  • Oct 24, 2019
  • Soft Computing
  • Saibal Majumder +3
  • Research Article
  • Citations92

Profit-oriented partial disassembly line design: dealing with hazardous parts and task processing times uncertainty

  • Jan 15, 2018
  • International Journal of Production Research
  • Mohand Lounes Bentaha +4
  • Research Article
  • Citations59

The assembly line worker assignment and balancing problem with stochastic worker availability

  • Nov 26, 2015
  • International Journal of Production Research
  • Marcus Ritt +2
  • Research Article
  • Citations9

Minimizing maximum cost for a single machine under uncertainty of processing times

  • Apr 09, 2020
  • European Journal of Operational Research
  • Ilia Fridman +2
  • Research Article
  • Citations43

Model and migrating birds optimization algorithm for two-sided assembly line worker assignment and balancing problem

  • Dec 06, 2018
  • Soft Computing
  • Mukund Nilakantan Janardhanan +2
  • Research Article
  • Citations68

A population-based algorithm for the bi-objective assembly line worker assignment and balancing problem

  • Dec 09, 2015
  • Engineering Applications of Artificial Intelligence
  • P Th Zacharia +1
  • Research Article
  • Citations81

A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem

  • Feb 27, 2009
  • International Journal of Production Research
  • R Gamberini +3
  • Conference Article
  • Citations2

Multi-objective genetic algorithm for integrated process planning and scheduling with fuzzy processing time

  • Oct 01, 2013
  • Xiaoyu Wen +4
  • Research Article
  • Citations28

Risk-averse assembly line worker assignment and balancing problem with limited temporary workers and moving workers

  • Nov 26, 2021
  • International Journal of Production Research
  • Ming Liu +5
  • Book Chapter
  • Citations12

Advances in robust optimization approaches for scheduling under uncertainty

  • Jan 01, 2005
  • Computer Aided Chemical Engineering
  • Stacy L Janak +1
  • Research Article

An Integrated Stochastic Optimization and Simulation Approach to SERU vs. Assembly Line Manufacturing Systems

  • Nov 13, 2024
  • Journal of Applied Business and Economics
  • Gokhan Egilmez +2
  • Conference Article
  • Citations16

A Multi-objective Fuzzy Genetic Algorithm for Job-shop Scheduling Problems

  • Nov 01, 2006
  • Y.J Xing +3
  • Research Article
  • Citations32

A fuzzy assembly line balancing problem with physical workload constraints

  • Aug 24, 2012
  • International Journal of Production Research
  • Özcan Mutlu +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.