• Home
  • Search
  • Bi-objective optimization of flexible flow shop scheduling problem with multi-skilled human resources
  • Cite Icon20
  • https://doi.org/10.1016/j.engappai.2024.108094Copy DOI Icon

Bi-objective optimization of flexible flow shop scheduling problem with multi-skilled human resources

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Bi-objective optimization of flexible flow shop scheduling problem with multi-skilled human resources

Similar Papers
  • Research Article
  • Citations21

Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping

  • Nov 08, 2021
  • Computers & Operations Research
  • Ali Hasani +1
  • Research Article
  • Citations45

Combined strategy of improved simulated annealing and genetic algorithm for inverse problem

  • May 01, 1996
  • IEEE Transactions on Magnetics
  • Tang Renyuan +4
  • Research Article
  • Citations2

Flexible flow shop scheduling problem with setup times and blocking constraint via genetic algorithm and simulation

  • Oct 01, 2019
  • IOP Conference Series: Materials Science and Engineering
  • Meng Zhang
  • Conference Article
  • Citations3

Metaheuristics for two-stage no-wait flexible flow shop scheduling problem

  • Mar 01, 2015
  • Mageed A Ghaleb +2
  • Research Article
  • Citations42

A swarm optimization approach for flexible flow shop scheduling with multiprocessor tasks

  • Dec 04, 2011
  • The International Journal of Advanced Manufacturing Technology
  • Manas Ranjan Singh +1
  • Research Article
  • Citations30

Scheduling of multi-component products in a two-stage flexible flow shop

  • Mar 25, 2015
  • Applied Soft Computing
  • Fatemeh Nikzad +3
  • Research Article
  • Citations13

Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem

  • Feb 06, 2023
  • Computers & Operations Research
  • Shuang Zheng +4
  • Research Article
  • Citations17

Scheduling rules for two-stage flexible flow shop scheduling problem subject to tail group constraint

  • Aug 30, 2013
  • International Journal of Production Economics
  • Zhan-Tao Li +4
  • Research Article
  • Citations25

Novel computing paradigms for parameter estimation in Hammerstein controlled auto regressive auto regressive moving average systems

  • Apr 17, 2019
  • Applied Soft Computing
  • Ammara Mehmood +3
  • Book Chapter
  • Citations1

Chaos/Cloud Theories to Avoid Trapping into Local Optimum

  • Jan 01, 2013
  • Wei-Chiang Hong
  • Research Article
  • Citations54

Flexible flow shop scheduling with uniform parallel machines

  • Feb 01, 2006
  • European Journal of Operational Research
  • George J Kyparisis +1
  • Conference Article
  • Citations10

Solving the forward kinematics of the 3RPR planar parallel manipulator using a hybrid meta-heuristic paradigm

  • Dec 01, 2009
  • Rohitash Chandra +2
  • Research Article
  • Citations38

A new hybrid ant colony algorithm for scheduling of no-wait flowshop

  • Jul 04, 2016
  • Operational Research
  • Vahid Riahi +1
  • PDF
  • Research Article
  • Citations3

A bi-objective simulation-optimization approach for solving a no-wait two stages flexible flow shop scheduling problem with rework ability

  • Nov 16, 2017
  • International Business Research
  • Mohammad Rahmanidoust
  • Research Article
  • Citations58

Effective constructive heuristics for distributed no-wait flexible flow shop scheduling problem

  • Jul 22, 2021
  • Computers & Operations Research
  • Weishi Shao +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.