BIM-and Simulation-Based Site Layout Planning

  • Jun 17, 2014
  • H Astour +1 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

In the course of the research project, a prototype system has been developed at the Institute of Construction Management in the University of Kassel, Germany. The developed system performs its task in two phases: BIM-based (BIM: Building Information Modeling) generation of 3D-site layout plan, and simulation-based evaluation of the site layout plan. BIM-based generation of site layout plan takes place within a BIM environment based on an optimization methodology for automated dimensioning and locating of the site facilities. This methodology depends on geometry data of the building and obstacles at the site. It also depends on the equipment which is available for the project, the number of staff, the construction methods to be used, as well as the necessary safety measures at the site. For the sake of generation process, a 3D-parametric library has been developed; the elements of which are used as basic components for the site layout plan. The degree of utilization of the site equipment is determined in the “simulation-based evaluation of the site layout plan” phase. For this phase, an agent-based simulation model has been developed. This model is capable of simulating the behavior of all elements on the site and the interaction between them and their environment. The required data for the simulation is read from the BIM environment and input via the built-in and self-developed user interface within the BIM environment. This paper describes the site layout planning problem and the previous efforts to solve it by using computers. It also illustrates the necessity for effective site layout planning system and clarifies the system architecture which is developed for this purpose.

Similar Papers
  • Research Article

Optimal Technological Approaches for Enhancing Construction Site Layout Planning Efficiency

  • Jan 01, 2025
  • International Journal of Research and Scientific Innovation
  • Nur Fadilah Darmansah +4
  • Research Article

PLANNING OF CONSTRUCTION SITE LAYOUT: A REVIEW

  • Sep 30, 2022
  • Journal of Science and Engineering Applications
  • Al Kulabi Kamil +1
  • Research Article
  • Citations55

Multi-objective Construction Site Layout Planning Using Genetic Algorithms

  • Jan 01, 2016
  • Procedia Engineering
  • Ioanna N Papadaki +1
  • Conference Article
  • Citations15

Congestion Analysis for Construction Site Layout Planning using Real-Time Data and Cell-Based Simulation Model

  • Jun 17, 2014
  • N Pradhananga +1
  • PDF
  • Research Article
  • Citations26

Accessibility evaluation system for site layout planning – a tractor trailer example

  • Dec 01, 2013
  • Visualization in Engineering
  • Jacob Je-Chian Lin +3
  • Conference Article

Integration of Computer-Aided Solar Energy System Design in Building Information Modeling

  • Jun 17, 2014
  • Hung-Ming Chen +1
  • Research Article
  • Citations6

An automated model for selecting the optimum mobile crane model and on-site position using genetic algorithms

  • Jun 01, 2015
  • Open Collections
  • Tarek Zaki +2
  • Research Article
  • Citations18

Evolutionary optimization technique for site layout planning

  • Nov 17, 2013
  • Sustainable Cities and Society
  • A.M El Ansary +1
  • Research Article
  • Citations11

Framework for increasing sustainability of factory systems by generative layout design

  • Jan 01, 2022
  • Procedia CIRP
  • Marian Süße +2
  • Book Chapter
  • Citations1

Integration of BIM and Generative Design for Earthbag Projects

  • Sep 29, 2019
  • Deborah M Santos +1
  • PDF
  • Research Article
  • Citations28

Opportunities for Using Building Information Modeling to Improve Worker Safety Performance

  • Feb 08, 2017
  • Safety
  • Kasim Alomari +2
  • Research Article
  • Citations139

Proximity hazard indicator for workers-on-foot near miss interactions with construction equipment and geo-referenced hazard areas

  • Oct 22, 2015
  • Automation in Construction
  • Jochen Teizer +1
  • Research Article
  • Citations42

Intelligent optimal design of floor tiles: A goal-oriented approach based on BIM and parametric design platform

  • Mar 30, 2021
  • Journal of Cleaner Production
  • Shihai Wu +3
  • Research Article
  • Citations80

Leveraging BIM and Big Data to deliver well maintained highways

  • Oct 03, 2017
  • Facilities
  • Zeeshan Aziz +2
  • Research Article
  • Citations104

Towards sustainable construction: BIM-enabled design and planning of roof sheathing installation for prefabricated buildings

  • Jul 07, 2019
  • Journal of Cleaner Production
  • Hexu Liu +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.