• Home
  • Search
  • Blocking-Waived Estimation: Improving the Worst-Case End-To-End Delay Analysis in Switched Ethernet
  • https://doi.org/10.1109/lcn60385.2024.10639705Copy DOI Icon

Blocking-Waived Estimation: Improving the Worst-Case End-To-End Delay Analysis in Switched Ethernet

  • Oct 8, 2024
  • Lijie Yang +3 more
Show More
  • Abstract
  • Literature Map
  • References
  • Similar Papers
Abstract

As time-sensitive networks must guarantee the end-to-end delay requirement of data flows, the worst-case delay (WCD) analysis is mandatory. To date, several analytical approaches have been proposed for WCD analysis, mainly in two classes: network-calculus approaches (NC), and real-time scheduling-oriented approaches such as response-time analysis (RTA), and compositional performance analysis (CPA). In spite of advances in WCD analysis techniques, the computation of the exact worst-case delay faces combinatorial explosion issues, therefore several approaches have been developed to provide an upper bound with more or less pessimism. Nevertheless, reducing pessimism remains challenging, and each approach differs from others in specific scenarios. In this context, this paper provides a comprehensive comparative study that analyzes the results of WCD calculation approaches under the Non-preemptive Fixed Priority Scheduling Policy. To further reduce the pessimism, we propose a new algorithm BWE (Blocking-Waived Estimation) built for switched network architectures upon RTA, which further investigates the relationship between blocking time and transmission time of the flow of interest (e.g., virtual link in AFDX) in adjacent hops. As illustrated in an example network architecture, the result produced by BWE is generally less pessimistic (the WCD is reduced by at maximum 34.34%) compared to the state-of-the-art RTA/CPA calculation results.

Similar Papers
  • Research Article

Time in Focus: The Strategic Application of Impacted As-Planned Method of Delay Analysis in Construction Dispute Resolution

  • May 01, 2024
  • Arbitration: The International Journal of Arbitration, Mediation and Dispute Management
  • Shubham Singh +1
  • Research Article
  • Citations7

BUILDING INFORMATION MODELING AND FORENSIC ANALYSIS OF DELAY AND DISRUPTION

  • May 01, 2016
  • Proceedings of International Structural Engineering and Construction
  • Ageliki Valavanoglou +1
  • Research Article
  • Citations1

EFFECTIVE CRITERIA FOR SELECTING DELAY ANALYSIS METHODOLOGIES FOR CONSTRUCTION PROJECT IN ABU DHABI

  • Jun 01, 2022
  • ASEAN Engineering Journal
  • Shahnaz Ali Abdalla Mohammed +1
  • Research Article
  • Citations3

Improving existing delay analysis techniques for the establishment of delay liabilities

  • Mar 01, 2004
  • Construction Innovation
  • S T Ng +3
  • PDF
  • Research Article
  • Citations5

CONSTRUCTION DELAY ANALYSIS USING DAILY WINDOWS TECHNIQUE

  • Jan 01, 2011
  • Journal of Engineering
  • Sawsan Rasheed Mohammed +1
  • Conference Article
  • Citations29

A Structural Analysis of Network Delay

  • May 01, 2011
  • Atef Abdelkefi +1
  • Conference Article

Avoiding false paths caused by resource binding in RTL delay analysis

  • Jan 01, 1996
  • M Nourani +1
  • Research Article
  • Citations1

Construction Delay Analysis and early Warning Model Based on Design Structure Matrix

  • Aug 08, 2013
  • Applied Mechanics and Materials
  • De Yin Liu +1
  • Research Article
  • Citations5

Delay Analysis Statements in the Presence of Debatable Concerns in Construction Projects

  • Dec 01, 2021
  • IEEE Engineering Management Review
  • Abanoub Wasfy +1
  • Research Article
  • Citations70

Construction Decision Support System for Delay Analysis

  • Jun 01, 1993
  • Journal of Construction Engineering and Management
  • J K Yates
  • Conference Article
  • Citations5

Gateway Modeling and Response Time Analysis on CAN Clusters of Automobiles

  • Aug 01, 2015
  • Guoqi Xie +4
  • Conference Article
  • Citations1

Approximate analysis of the average delay in parallel program execution

  • Jan 05, 1993
  • B Rajaraman +1
  • Research Article

Analysis of Packet Delay for an Integrated Voice-Data System

  • Sep 01, 1990
  • IETE Journal of Research
  • Rong-Feng Chang +1
  • Book Chapter
  • Citations2

Application of Dimensionless Method to Estimate Traffic Delays at Stop-Controlled T-Intersections

  • Jan 01, 2021
  • Mohammad Ali Sahraei +2
  • Conference Article
  • Citations5

Analysis of Delay Causes for Pipeline Projects in Sewage System: Taiwan Cases

  • Jul 17, 2008
  • Jyh-Bin Yang +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.