  • Challenges of Large Diameter Horizontal Directional Drills
  • Cite Icon1
  • https://doi.org/10.1061/41187(420)55Copy DOI Icon

Challenges of Large Diameter Horizontal Directional Drills

  • Jul 28, 2011
  • Daniel Applegate +2 more
Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

The City of Fort Worth will complete the construction in April 2011 on a 12-mile reclaimed water pipeline extending from the Village Creek Water Reclamation Center (VCWRC) in Fort Worth to the south end of the Dallas/Fort Worth (D/FW) International Airport. The pipeline alignment was determined based on the close proximity to the initial wholesale customers including the Cities of Arlington, Euless, and Dallas/Fort Worth International Airport as well as future expansion. This resulted in the majority of the pipeline being designed within existing right-of-ways creating numerous conflicts that had to be resolved within the limited working room allowed. To overcome these challenges three 30-inch diameter horizontal directional drills (HDD) were designed, one of which being the longest large diameter ductile iron pipe HDD in the state of Texas. The first horizontal directional drill was approximately 1,005 LF of 30-inch ductile iron pipe to allow the pipeline to cross the West Fork of the Trinity River. The location of the crossing located adjacent to the VCWRC is on land owned by the City which allowed for adequate room to construct and string the pipeline but also resulted in high operating and surge pressures especially considering the depth necessary to cross the river. The second horizontal directional drill was approximately 955 LF of 20-inch PVC carrier pipe inside 30-inch steel casing pipe to cross State Highway (S.H.) 360. The pipeline alignment was shifted north outside of F.A.A. Boulevard right-of-way to prevent the road from being closed during construction requiring permanent and temporary construction easements on both sides of the freeway. F.A.A. Boulevard has not been constructed on the east side of S.H. 360 but the right-of-way has been dedicated allowing this area to be used for stringing the pipeline and staging for the drill. The design of this drill was challenging due to the deep and narrow highway depression, the minimal construction area on private property, and varying geologic soil conditions located within the Woodbine Formation including the possibility of large crystalline boulders. The third horizontal directional drill was approximately 1,015 LF of 20-inch PVC carrier pipe inside 30-inch steel casing pipe to cross S.H. 183. The pipeline alignment parallels an existing natural gas transmission main leading to a gas well pad site at D/FW International Airport. This resulted in limited construction space between the gas pad site and Texas Department of Transportation (TxDOT) right-of-way which required a temporary easement on private property during drilling in order to string the pipeline. The predominant challenge for this drill was due to the deep and wide highway right-of-way created by the on and off ramps at the intersection of S.H. 360 and S.H. 183.

Similar Papers
  • Conference Article
  • Citations1

HDD — Cartridge Method and 24-Inch (610mm) Ductile Iron Pipe Key to Minimizing Surface Disruption in Hillsborough County

  • Jul 28, 2006
  • Ebrahim Maidani +2
  • Research Article
  • Citations25

Design and feasibility analysis of a fluidic jet oscillator with application to horizontal directional well drilling

  • Nov 01, 2015
  • Journal of Natural Gas Science and Engineering
  • Jiang-Fu He +5
  • Conference Article
  • Citations1

Multiple HDD Applications for Portland Airport Deicing Enhancement Project

  • Jul 28, 2011
  • Jack R Ostlund, Jr +1
  • Conference Article
  • Citations1

Impacts of Aircraft Deicer and Anti-icer Runoff on Receiving Waters from Dallas/Fort Worth International Airport, Texas

  • Jan 01, 2007
  • Glenn R Harwell +3
  • Conference Article
  • Citations5

The Local Area Augmentation System: an airport surface guidance application supporting the NASA runway incursion prevention system demonstration at the Dallas/Fort Worth International Airport

  • Oct 14, 2001
  • R Thomas +1
  • Conference Article

Application of Microtunnelling in Oil & Gas Projects for the Installation of Multiple Pipelines

  • Nov 03, 2025
  • Pankaj Sharma
  • Research Article

Construction of an acoustic information transmission system of a horizontal directional drilling device

  • Feb 01, 2024
  • Radioengineering
  • A.V. Vagin +1
  • Conference Article
  • Citations2

Corrosion Protection of a Pipeline Section Inside an HDD Coastal Landfall

  • Sep 29, 2014
  • Bruno Reis Antunes +4
  • Conference Article
  • Citations1

Emergency Relocation of 20 Inch Sewer Force Main (HDD)

  • Aug 17, 2012
  • Arnelio Alfonso +1
  • Book Chapter
  • Citations4

Corrosion Rates of Ductile Iron Pipe in Drilling Fluids: A Comparison of ASTM Electrochemical Standards G59, G102, and G106 to ASTM Weight Loss Standard G162

  • Feb 27, 2019
  • Mike Horton
  • PDF
  • Research Article
  • Citations5

Development of a rapid field testing method for metals in horizontal directional drilling residuals with XRF sensor

  • Feb 16, 2021
  • Scientific Reports
  • Hailin Zhang +2
  • Conference Article
  • Citations1

HDD Installation Practices for Buried Pipeline Energy Infrastructure in China

  • Jul 30, 2014
  • Pipelines 2014
  • Maureen Carlin +3
  • Conference Article

Least Cost Solution for "Short-Haul" Fights from Regional Airports to Dallas/Fort Worth International Airport (DFW)

  • May 29, 2014
  • Ziaur Rahman +2
  • Conference Article
  • Citations2

Coastal Shoreline Crossing Using Horizontal Directional Drilling for Pipeline Installation Achieves Excellent Environmental and Social Outcomes

  • Sep 11, 2012
  • L Howitt +3
  • Conference Article

Application of a Fluidic Actuator to Horizontal Directional Well Drilling

  • Jan 01, 2015
  • Jiangfu He +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.