• Home
  • Search
  • Choosing Between Two Kind of Sampling Patterns Using Geostatistical Simulation: Regularly Spaced or at High Uncertainty Locations?
  • Cite Icon14
  • https://doi.org/10.1007/s11053-011-9141-5Copy DOI Icon

Choosing Between Two Kind of Sampling Patterns Using Geostatistical Simulation: Regularly Spaced or at High Uncertainty Locations?

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Data from a mineral deposit are commonly obtained by core drilling. This kind of sampling involves high costs, limiting the number of drill holes. Additional holes should be located to bring the maximum benefit. The benefit can be evaluated by various ways and must take into account the goals of sampling. This article presents a case study where the deposit has been sampled and the new drillings must be added to reduce the uncertainty about a transfer function, Net Present Value (NPV) of the mining project. There are basically two ways to choose locations where new drillings should be placed for cases where the aim of sampling is to reduce uncertainty about a global function: the addition of new drillings outlining a quasi regular grid with previously collected drillings or the addition of new drillings on the locations of high uncertainty about the attribute of interest (or the attribute that is considered most influential in the transfer function). The performances of these patterns on reducing the uncertainty measured by the function selected are compared. The results point out that the most efficient pattern relates to the distribution (histogram) of the uncertainty about the attribute of interest. Thus, the choice of which sampling pattern should be adopted varies depending on data distribution and its influence on the transfer function.

Similar Papers
  • Research Article
  • Citations13

Investment Project Valuation: A New Equity Perspective

  • Jun 08, 2009
  • The Engineering Economist
  • Denis Babusiaux +1
  • PDF
  • Research Article
  • Citations10

Balancing Project Schedule, Cost, and Value under Uncertainty: A Reinforcement Learning Approach

  • Aug 21, 2023
  • Algorithms
  • Claudio Szwarcfiter +2
  • Research Article

METHOD AND SYSTEM FOR EQUALIZING A LOUDSPEAKER IN A ROOM

  • Jan 01, 2012
  • The Journal of the Acoustical Society of America
  • Jan Abildgaard Pedersen
  • Research Article
  • Citations70

Stochastic mine design optimisation based on simulated annealing: pit limits, production schedules, multiple orebody scenarios and sensitivity analysis

  • Jun 01, 2009
  • Mining Technology
  • F R Albor Consuegra +1
  • Research Article
  • Citations12

Application of risk assessment to improve sustainability in bauxite mining

  • Sep 13, 2021
  • Resources Policy
  • Jonas Kloeckner +5
  • Research Article
  • Citations11

Multivariate geostatistical simulation with sum and fraction constraints

  • Jun 19, 2018
  • Applied Earth Science
  • Marcel Antonio Arcari Bassani +2
  • Conference Article
  • Citations4

Optical Measurement of Local and Global Transfer Functions for Equivalence Ratio Fluctuations in a Turbulent Swirl Flame

  • Jun 03, 2013
  • Bernhard C Bobusch +3
  • Research Article

Integrated model of risk-oriented strategizing of the economic behaviour of a pharmaceutical enterprise

  • Dec 17, 2025
  • Strategy of Economic Development of Ukraine
  • Andrii Horin
  • PDF
  • Research Article
  • Citations1

Using multiple random walk simulation in short-term grade models

  • Jun 01, 2017
  • REM - International Engineering Journal
  • Rafael Moniz Caixeta +2
  • Research Article
  • Citations6

Potential and Benefit of Green Roof Energy Renovation of Existing Residential Buildings with a Flat Roof in Belgrade

  • Jun 21, 2023
  • Applied Sciences
  • Zoran Perovic +3
  • PDF
  • Research Article
  • Citations24

Uncertainty Quantification in Mineral Resource Estimation

  • Aug 11, 2024
  • Natural Resources Research
  • Oltingey Tuya Lindi +3
  • Research Article
  • Citations7

The Net-Present-Value Paradox: Criticized by Many, Applied by All

  • Aug 17, 2017
  • SPE Economics & Management
  • Bart J Willigers +2
  • Conference Article
  • Citations7

Quantifying the Importance of Decisions and the Impact of Data Acquisition on Decisions in Hydrocarbon Field Re-Developments

  • Dec 01, 2020
  • Dominik Steineder +1
  • Conference Article

A Methodology for Gauging the Sensitivity of Project Value During Concept Comparison and Selection

  • Dec 01, 2008
  • Mark Darren Neuhold +2
  • Book Chapter

Dealing with Risk in Investment Decisions

  • Jan 01, 1998
  • Financial Management
  • Geoffrey Knott
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.