• Home
  • Search
  • Colombian Underbalanced Drilling Operations - Start Up Experience
  • Cite Icon5
  • https://doi.org/10.2118/37677-msCopy DOI Icon

Colombian Underbalanced Drilling Operations - Start Up Experience

  • Mar 4, 1997
  • T.w Hogg +1 more
Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

SPE/IADC Members Abstract This is a study of BPX Colombia's initial experience introducing under balanced drilling technology to their Piedemonte licence. The intention was to prove that a step change in performance could be achieved by application of this technology. Thus significantly reducing traditionally very high operational costs due to the faulted and over thrust nature of this developing mountain region. The occurrence of over thrust sheets which contain very hard sandstone and shale sequences have in the past proven particularly difficult to drill, slow and therefore very expensive. BPX Colombia researched the options available in this developing technique considering, proven and developing technology in order to prepare a strategy leading to the evaluation of under balanced drilling on two wells in the Piedemonte Licence. Introduction BP Exploration Colombia in the past few years has made significant discoveries in the Colombian foothills. Building upon these discoveries, exploration has successfully continued North into the Piedemonte licence (figure 1). In order to develop the Cusiana and Cupiagua fields, BPX Colombia and it's Partners conducted significant research to provide solutions to the difficult drilling problems. However even with the application of that knowledge Piedemonte wells are significantly more difficult to drill due to the more complex geology. This is characterised by high horizontal stresses, steeply dipping beds, numerous faults and alternating sand shale sequences combined with the El Morro thrust structure containing the very hard Mirador and Barco sandstone which has proven particularly difficult to drill using optimised conventional techniques. The El Morro thrust sheet is not present in the Cusiana and Cupiagua fields. Traditionally drilling the El Morro thrust sheet alone has taken upwards of 72 bits and 100 days per well. Under balanced drilling was identified as a technology which had the potential to deliver significant performance improvements, even by solely doubling the ROP which has been currently achieved. The decision was taken to investigate the potential for it on two wells which were in the planning stage. Initial planning consisted of a literature review and site visits to operations in South and Central America where various aspects of under balanced drilling operations were ongoing. In parallel with this effort all the contractors associated with BPX Colombia reviewed their own immediate in house experience in under balanced drilling. The net was then cast further to identify as much experience and technology as possible prior to determining what aspects of the technologies would be evaluated on these two wells. At a series of open meetings with all the contractors, they outlined the knowledge and technology which existed within their organisations. Each technology and technique was examined in order to identify where it could contribute towards a step change in performance in the Piedemonte licence. This identified at an early stage that only a few companies had specific knowledge in a narrow sphere, but no one company had all the experience. The air drilling Service Contractor had an overall perspective, however the Colombian Llanos foothills and specifically the Piedemonte licence was a new area to them, hence operational experience still had to be developed. It was recognised and acknowledged by BPX Colombia that the limited experience available indicated that under balanced drilling operations required a period of time to tailor it to a specific area, as experienced in other geological regions of the world. As this initial planning process progressed it confirmed the magnitude of the possible prize. It was decided to evaluate under balanced drilling techniques using Foam, Aerated Water Based Mud (WBM) and Nitrified Oil Based Mud (OBM) on two Piedemonte wells which were at the planning stage. Several options identified other than the selected under balanced drilling techniques are still being monitored or pursued by BPX Colombia in order to provide additional step changes in performance. P. 891^

Similar Papers
  • Research Article
  • Citations12

Rheological studies and numerical investigation of barite sag potential of drilling fluids with thermochemical fluid additive using computational fluid dynamics (CFD)

  • Nov 02, 2022
  • Journal of Petroleum Science and Engineering
  • Olalekan Alade +2
  • Research Article
  • Citations36

Potential Leakage Paths along Cement-formation Interfaces in Wellbores; Implications for CO2 Storage

  • Jan 01, 2014
  • Energy Procedia
  • Nils Van Der Tuuk Opedal +3
  • Conference Article
  • Citations7

Assessment of Environmental Impacts from Drilling Muds and Cuttings Disposal, Offshore Brunei

  • Mar 20, 2002
  • S Sayle +2
  • Research Article
  • Citations17

A Microbit Investigation of the Potential For Improving the Drilling Rate of Oil-Base Muds in Low-Permeability Rocks

  • May 01, 1974
  • Journal of Petroleum Technology
  • John E Fontenot +1
  • Conference Article

First GCC Utilization of Superior Primary Solids Control Equipment Reduces Surface Mud Losses and Minimizes Environmental Impact

  • Jan 13, 2020
  • Tulio Olivares +1
  • Conference Article
  • Citations10

Novel Drill Bit Materials Technology Fusion Delivers Performance Step Change in Hard and Difficult Formations

  • Mar 05, 2013
  • Alexis García +6
  • Conference Article
  • Citations25

Experimental Approach to Characterize Drilling Mud Invasion, Formation Damage and Cleanup Efficiency in Horizontal Wells with Openhole Completions

  • Feb 23, 2000
  • D G Longeron +3
  • Conference Article
  • Citations36

High-Performance Water-Based Mud Using Nanoparticles for Shale Reservoirs

  • Aug 14, 2013
  • Chang Min Jung +3
  • Conference Article

Brazilian Pre-Salt Paradigm Shift: Drilling Reservoir with Exposed Salt for Open Hole Completion with Oil-Based Mud

  • Oct 21, 2025
  • OTC Brasil
  • F Fabri +4
  • PDF
  • Research Article
  • Citations28

Experimental study on water-based mud: investigate rheological and filtration properties using cupressus cones powder

  • Feb 22, 2022
  • Journal of Petroleum Exploration and Production Technology
  • Imtiaz Ali +2
  • Conference Article
  • Citations1

Ultrasonic Borehole Imaging in the Logging While Drilling Domain in All Mud Types, a Case Study in Offshore Abu Dhabi

  • Oct 02, 2023
  • Hassan Mohamed +4
  • Conference Article
  • Citations2

Low Noise Transducer for Logging While Drilling Borehole Imaging in Oil Based and Water-Based Muds

  • Oct 27, 2020
  • Jing Jin +3
  • Conference Article
  • Citations8

Successful Application of Unique High-Density Water-Based Drilling Fluid Used in Zhaotong Shale Gas Horizontal Wells

  • Oct 20, 2015
  • Lili Yan +6
  • Single Report
  • Citations4

JOINT-INDUSTRY PARTNERSHIP TO DEVELOP A HOLLOW SPHERE DUAL-GRADIENT DRILLING SYSTEM

  • May 01, 2003
  • William C Maurer +2
  • Conference Article
  • Citations1

High-Resolution LWD Acoustic Borehole Imaging in WBM and OBM: New Interpretation Possibilities from Combination with Ele

  • Jun 11, 2018
  • Proceedings
  • S Morris +7
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.