Comparative Time–Cost Analysis of Modular and Conventional Construction Using Primavera P6

Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

Abstract This paper examines the time comparing efficiency between the two approaches namely the modular building system and the common ways of building a construction and cost efficiency with an emphasis on whether Primavera P6 is used as a means of project scheduling and project optimization. Using modules, prefabricated off site and assembled on site, modular construction does provide the opportunity to shorten project schedules through simultaneous work on activities, reduced occurrence of weather delays, and enhanced quality management. Nevertheless, adoption by industry is a problem related to difficulty in initial manufacturing costs, involved logistics of production, specialized labour, and also having an equal scarcity in domestic supply chains. Case study method was used which is comparative, focusing on two same-type multi-story buildings constructions, with the same type of products, but one is built using standard methods and the other with modular construction. Primavera P6 was used to model both scenarios so that they could be handled with the same delivery timing, career and cost control. Also, 25 professionals in the industry have been surveyed and the relative importance index (RII) was applied to their responses to measure benefits and barriers impression. The findings indicated that the modular approach to construction saved 65 days (12.7 percent) on the project and this was largely due to concurrent fabrication of the modules off-site and on-site site preparations. The total costs however, rose up by about 8.1 percent with the catalyst being fabrication, transport, crane procedures and special assembly needs. RII analysis proved that the most appreciated benefits were time savings and improved profitability and the most hindering barriers were high initial costs and constraints regarding logistics. This conclusion implies that modular construction can be vitally fast in delivering the projects when coupled with an advanced project management tool such as Primavera P6. Greater investments in strategic supply chain management development, training of the workforce and regulatory backing of the modular practices should be encouraged to render the modular practices cost-competitive and more popular. Keywords- Building performance, Cost optimization, Modular construction, Prefabricated systems, Primavera P6 scheduling, Time efficiency

Similar Papers
  • PDF
  • Research Article
  • Citations21

Suitability of Modular Technology for House Construction in Sri Lanka: A Survey and a Case Study

  • Oct 13, 2023
  • Buildings
  • Thisari Munmulla +5
  • Research Article
  • Citations56

Multiple Modular Building Construction Project Scheduling Using Genetic Algorithms

  • Oct 31, 2018
  • Journal of Construction Engineering and Management
  • Jeonghoon Lee +1
  • Research Article
  • Citations18

A novel mathematical optimisation model for the scheduling of activities in modular construction factories

  • Nov 18, 2019
  • Construction Management and Economics
  • Ahmed Wa Hammad +4
  • Research Article

Evaluating Waste Reduction In Sustainable Modular Construction Over Conventional Building Practices: A Case Study Of Suraksha Smart City, Vasai

  • May 10, 2025
  • International Journal of Environmental Sciences
  • Mr Pankaj Kumar Yadav +2
  • Research Article
  • Citations107

An Investigation of Critical Factors and Constraints for Selecting Modular Construction over Conventional Stick-Built Technique

  • Jul 01, 2013
  • International Journal of Construction Education and Research
  • Salman Azhar +2
  • Research Article
  • Citations1

Approaching zero-carbon development through modular construction: A case study of healthcare buildings in London

  • Jul 01, 2025
  • Indoor and Built Environment
  • Dingyue Cui +2
  • Research Article
  • Citations1

Modular construction as a promising alternative for the construction of affordable and quality housing

  • Jan 01, 2024
  • MATEC Web of Conferences
  • Duarte R.P.B Antunes +2
  • Research Article
  • Citations86

A-State-Of-The-Art review on modular building connections

  • Sep 09, 2021
  • Structures
  • Heshachanaa Rajanayagam +6
  • Research Article
  • Citations18

Integrated carbon emission estimation method for construction operation and project scheduling

  • Aug 31, 2015
  • KSCE Journal of Civil Engineering
  • Tae-Kyung Lim +3
  • Research Article

Construction Project Planning and Scheduling: A Case of Inlet Separator Fabrication

  • Nov 11, 2021
  • Journal of Economics, Finance And Management Studies
  • Wiwik Handayani
  • Research Article
  • Citations5

A novel advanced block assembly method with 3D printed channel systems

  • Sep 23, 2024
  • Composite Structures
  • Tae Hee Lee +2
  • Research Article
  • Citations2

Risk Analysis and Control Strategies for the Assembly of Major Structure Module in AP1000 Nuclear Power Project

  • Sep 01, 2017
  • Energy Procedia
  • Tiezhu Hu +1
  • Conference Article
  • Citations3

Fatigue-resistant design of modular bridges made of precast concrete elements

  • Jan 01, 2022
  • Report
  • David Schaarschmidt +1
  • Research Article

Assessment of challenges confronting construction industry professionals in implementing sustainable practices on construction sites

  • Feb 10, 2026
  • Environmental Technology and Science Journal
  • A Uthman +1
  • Research Article

Shaping tomorrow's skylines: A review of emerging methods and technologies in sustainable structural engineering

  • Jan 01, 2025
  • i-manager's Journal on Structural Engineering
  • Mengesha Azanaw Girmay
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.