- Conference Article
9
- 10.2118/105065-ms
Multiskilling as a Key Factor for Economically Viable Operations in a Mature Oil Province: Oseberg East as a Case Example
- Feb 20, 2007
- Jan Ove Dagestad + 3 more +3
Innovative solutions for development of new technology and business models are needed to meet the economic challenges of declining production from the mature North Sea oil province. Bed space limitations imposed by platform redesign and modification at Oseberg East as part of the operator's improved oil recovery (IOR) strategy dictate a manning solution which significantly reduces persons on board (POB) if tail production is to be economically viable. Previous POB reduction models have typically focused on reducing the drilling contractor and production-phase manning levels on the platform. This study extends operational efficiency by employing an Integrated Services Model that encompasses multiple service providers in addition to the drilling contractor. Considering the entire crew in the context of "manning by tasks instead of manning by services" results in a substantial reduction of headcount whilst maintaining quality of execution. The solution developed covers directional drilling, downhole fluids, cementing, logging while drilling and completion operations, as well as drilling contractor and operator tasks. Emphasis has been put on transfering all work tasks that do not require physical presence at the rigsite to the onshore organization, for which use of modern communication technology is key. The business model promotes operational efficiency between service companies and drilling contractor through the development of non-traditional working processes that transgress individual company boundaries. Employees from third parties will be cross-trained such that their presence onboard is utilized in mission critical operations even where responsibility for the operation does not rest with their home organization. Maximising the effectiveness of onboard headcount is considered a first step in developing long-term, cost-effective solutions that will help ensure the longevity of mature assets. This paper describes solutions developed during the detailed planning phase of the Oseberg East tail production project, challenges to implementation, and expected benefits of the new service delivery model.
Read more