Coordination in project supply chain based on uncertainty theory

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

In this paper, we investigate channel coordination of project supply chain based on uncertainty theory. The project is conducted by one manufacturer, whose materials are provided by different suppliers. To complete the project before its deadline, the manufacturer needs to consider two elements – the on-site task duration and the material delivery lead time. Due to the lack of historical data, these two elements are assumed as uncertain variables. Through modeling and analyzing, the time-based contract is proved to achieve channel coordination if the manufacturer can decide the following two terms: the targeted material delivery date, and the fraction and the timing of the delayed payment. The manufacturer and his suppliers can have a win-win outcome by contract design. The impacts of variables’ uncertainty degrees are discussed as well. Generally speaking, uncertainty degrees’ increases bring more risks to the project’s completion. However, it is proved that the manufacturer can still keep his profit by changing the bonus and penalty even if the on-site duration and material delivery lead time’s uncertainty degrees increase.

Similar Papers
  • Research Article
  • Citations6

Distance and similarity measures between uncertain variables

  • Jun 23, 2015
  • Journal of Intelligent & Fuzzy Systems
  • Xiaozhong Li +1
  • Research Article
  • Citations72

Some results of moments of uncertain variable through inverse uncertainty distribution

  • Aug 05, 2014
  • Fuzzy Optimization and Decision Making
  • Yuhong Sheng +1
  • PDF
  • Research Article

Supply Chain Commitment Contract Model Based on Uncertainty Theory under Uncertain Market Information

  • Jan 01, 2015
  • Applied Mathematics
  • Yuquan Cui +2
  • Research Article
  • Citations25

Mean-variance model for portfolio optimization with background risk based on uncertainty theory

  • Dec 22, 2017
  • International Journal of General Systems
  • Jia Zhai +1
  • Research Article
  • Citations24

Assessing Effectiveness of Coordination in Food Supply Chain

  • Jul 01, 2014
  • International Journal of Information Systems and Supply Chain Management
  • Rajesh Kr Singh
  • Book Chapter
  • Citations4

Formulas to Calculate the Variance and Pseudo-Variance of Complex Uncertain Variable

  • Jan 01, 2017
  • Xiumei Chen +2
  • Research Article

Contributors

  • Dec 01, 2010
  • Operations Research
  • Research Article
  • Citations51

A study on supply chain investment decision-making and coordination in the Big Data environment

  • Feb 13, 2017
  • Annals of Operations Research
  • Pan Liu +1
  • Research Article
  • Citations24

An uncertain sustainable supply chain network

  • Mar 31, 2020
  • Applied Mathematics and Computation
  • Jiayu Shen
  • PDF
  • Research Article
  • Citations6

A Joint Location–Allocation–Inventory Spare Part Optimization Model for Base-Level Support System with Uncertain Demands

  • Jan 01, 2023
  • Axioms
  • Peixuan Li +3
  • Research Article
  • Citations21

A new method of level-2 uncertainty analysis in risk assessment based on uncertainty theory

  • Jun 19, 2018
  • Soft Computing
  • Qingyuan Zhang +2
  • PDF
  • Research Article
  • Citations17

A bi-objective model for uncertain multi-modal shortest path problems

  • Apr 08, 2015
  • Journal of Uncertainty Analysis and Applications
  • Yan Zhang +3
  • Research Article
  • Citations14

Reliability Mathematical Models of Repairable Systems With Uncertain Lifetimes and Repair Times

  • Jan 01, 2018
  • IEEE Access
  • Ying Liu +3
  • Book Chapter

Investment Strategies of Digital Music Copyright in Uncertain Environment

  • Jan 01, 2023
  • Xixi Wang +1
  • Research Article
  • Citations6

A new uncertain enhanced index tracking model with higher-order moment of the downside

  • May 19, 2023
  • Soft Computing
  • Tingting Yang +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.