• Home
  • Search
  • Critical path analysis considering the signal transition time
  • Cite Icon1
  • https://doi.org/10.1109/icvc.1999.820813Copy DOI Icon

Critical path analysis considering the signal transition time

  • Oct 26, 1999
  • Sang-Yaol Hao +2 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

This paper proposes a critical path analysis algorithm that considers the effects of the signal transition time. First, the proposed algorithm finds the possible minimum transition time and the possible maximum transition time. Then, within the range, it extracts the maximum delay of each gate and computes the PERT delay. Finally, it performs depth first search under searching condition that the sum of a current searching path and a PERT delay is larger than that of critical path evaluated already. Experimental results show that the proposed algorithm finds the correct critical paths of the ISCAS 85 benchmark circuits where the existing critical path analysis methods fail. Experimental results also show that the complexity of the proposed algorithm is linear with the circuit size.

Similar Papers
  • Research Article
  • Citations1

Analysis Project Management on Cv. Nbw. Id by Cpm Method (Critical Path Method)

  • Mar 21, 2024
  • Jurnal Sinar Manajemen
  • Hikmad Tullah Ahmad +2
  • Conference Article
  • Citations46

Critical path analysis of the TRIPS architecture

  • Mar 19, 2006
  • R Nagarajan +4
  • Research Article
  • Citations32

Assessment of critical path analyses of the relationship between permeability and electrical conductivity of pore networks

  • Jul 13, 2011
  • Advances in Water Resources
  • Todd H Skaggs
  • PDF
  • Research Article
  • Citations6

Using the critical path method (CPM) for evaluating allocation potential of temporary housing units

  • Mar 27, 2025
  • Journal of Housing and the Built Environment
  • Daniel V Perrucci +6
  • Research Article
  • Citations2

Analysis of Consultant Building Project Management Using the CPM (Critical Path Method)

  • Jun 10, 2024
  • Journal of Business Management and Economic Development
  • Tandi Kadang +4
  • Conference Article
  • Citations173

Critical path analysis for the execution of parallel and distributed programs

  • Jun 13, 1988
  • C.-Q Yang +1
  • Research Article

PENJADWALAN PROYEK PEMBANGUNAN RUANG KELAS BARU SMK NEGERI 1 LUWUK MENGGUNAKAN METODE CRITICAL PATH METHOD

  • Nov 30, 2025
  • SIPARSTIKA: Jurnal Ilmiah Ilmu-Ilmu Teknik
  • Putu Suartana +2
  • PDF
  • Research Article
  • Citations6

Fuzzy Critical Path Method Based on Lexicographic Ordering

  • Jan 03, 2012
  • Pakistan Journal of Statistics and Operation Research
  • Phani Bushan Rao P +1
  • Research Article

Software Application and Algorithm Designed for Power Systems Equipment and Network Construction Optimization

  • Dec 01, 2018
  • Journal of Physics: Conference Series
  • M Frigura-Iliasa +5
  • Research Article
  • Citations2

Determining k-possible critical paths using Tawanda's non-iterative optimal tree algorithm for shortest route problems

  • Jan 01, 2018
  • International Journal of Operational Research
  • Trust Tawanda
  • Conference Article
  • Citations7

A Scalable and Fast Microprocessor Design Space Exploration Methodology

  • Sep 01, 2015
  • Lei Wang +6
  • Research Article
  • Citations1

ANALISIS PELAKSANAAN PENJADWALAN PROYEK PEMBANGUNAN GEDUNG CLUBHOUSE DENGAN PENDEKATAN CPM DAN PERT PADA PT. XY

  • Apr 30, 2018
  • JKIE (Journal Knowledge Industrial Engineering)
  • Kasid Kasid +1
  • Dissertation

Analysis and design of high performance 128-bit parallel prefix end-around-carry adder

  • Jan 01, 2011
  • Ogun Turkyilmaz
  • Research Article
  • Citations1

A Comparative Analysis of the CPM and PERT Methods in Project Time Management for a High-Rise Building Construction Project in Yogyakarta

  • May 01, 2025
  • Sustainable Civil Building Management and Engineering Journal
  • Fazabella Wijaya Santoso +2
  • Research Article
  • Citations14

Supplementation and inhibition of nitric oxide synthesis influences bacterial transit time during bacterial translocation in rats.

  • Apr 01, 2003
  • Shock (Augusta, Ga.)
  • Stephan Samel +7
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.