• Cite Icon13
  • https://doi.org/10.1007/s11235-005-4317-0Copy DOI Icon

Delay Analysis of a HOL Priority Queue

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Priority scheduling for packets is a hot topic, as interactive (voice, video) services are being integrated in existing data networks. In this paper, we consider a discrete-time queueing system with a non-preemptive (or Head-Of-the-Line) priority scheduling discipline and a general number of priority classes. Packets of variable length arrive in the queueing system. We derive expressions for the probability generating functions of the packet delays. From these functions, some performance measures (such as moments and approximate probabilities) are calculated. We illustrate the performance measures by means of some numerical examples and show how to apply the theoretical results to a queue that handles arriving multimedia traffic.

Similar Papers
  • Book Chapter
  • Citations15

Performance Analysis of Priority Queueing Systems in Discrete Time

  • Jan 01, 2011
  • Joris Walraevens +2
  • Research Article
  • Citations23

System delay versus system content for discrete-time queueing systems subject to server interruptions

  • Nov 01, 2006
  • European Journal of Operational Research
  • Bart Vinck +1
  • Conference Article
  • Citations13

A probabilistic priority scheduling discipline for high speed networks

  • May 29, 2001
  • Yuming Jiang +2
  • Conference Article
  • Citations1

Research on real-time of hybrid scheduling for mine industrial Ethernet with network calculus

  • Jul 01, 2010
  • Yanjing Sun +2
  • Conference Article
  • Citations1

Analysis of networks buffer using discrete-time queueing models

  • Jan 01, 2009
  • Syed Asif Ali Shah +3
  • Research Article
  • Citations2

An arriving decision problem in a discrete-time queueing system

  • Jan 21, 2019
  • Advances in Computational Mathematics
  • Ivan Atencia +4
  • Research Article

Frame-bound priority scheduling in discrete-time queueing systems

  • Jun 01, 2011
  • Journal of Industrial and Management Optimization
  • Herwig Bruneel +3
  • Research Article
  • Citations18

Achieving differentiated services through multi-class probabilistic priority scheduling

  • Jul 01, 2002
  • Computer Networks
  • Chen-Khong Tham +2
  • Conference Article

A discrete-time queueing system under frame-bound priority

  • Jul 24, 2010
  • Sofian De Clercq +3
  • Research Article
  • Citations12

Queueing models for the analysis of communication systems

  • May 10, 2014
  • TOP
  • Herwig Bruneel +3
  • Research Article
  • Citations13

Analytical Results for Waiting Time and System Size Distributions in Two Parallel Queueing Systems

  • Jun 01, 1990
  • SIAM Journal on Applied Mathematics
  • Zhensheng Zhang
  • Research Article
  • Citations4

Delay performance of a selective-repeat ARQ scheme with a Markovian error channel

  • Jun 01, 1998
  • Electronics and Communications in Japan (Part I: Communications)
  • Shumji Fujii +1
  • Research Article
  • Citations5

A performance analysis of discrete-time tandem queues with Markovian sources

  • Mar 25, 2009
  • Performance Evaluation
  • X Song +1
  • Research Article
  • Citations49

Random algorithms for scheduling multicast traffic in WDM broadcast-and-select networks

  • Jun 01, 1999
  • IEEE/ACM Transactions on Networking
  • E Modiano
  • Research Article
  • Citations15

Performance evaluation of CAI and RAI transmission modes in a GI-G-1 queue

  • Jul 26, 2001
  • Computers & Operations Research
  • Dieter Fiems +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.