• Home
  • Search
  • Delay analysis of a probabilistic priority discipline
  • Open Access IconOpen Access
  • Cite Icon22
  • https://doi.org/10.1002/ett.4460130603Copy DOI Icon

Delay analysis of a probabilistic priority discipline

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Abstract In computer networks, the Strict Priority (SP) discipline is perhaps the most common and simplest method to schedule packets from different classes of applications, each with diverse performance requirements. With this discipline, however, packets at higher priority levels can starve packets at lower priority levels. To resolve this starvation problem, we propose to assign a parameter to each priority queue in the SP discipline. The assigned parameter determines the probability or extent by which its corresponding queue is served when the queue is polled by the server. We thus form a new packet service discipline, referred to as the Probabilistic Priority (PP) discipline. By properly adjusting the assigned parameters, not only is the performance of higher priority classes satisfied, but also the performance of lower priority classes can be improved. This paper analyzes the delay performance of the PP discipline. A decomposition approach is proposed for calculating the average waiting times and their bounds are studied. Two approximation approaches are proposed to estimate the waiting times. Simulation results that validate the numerical analysis are presented and examined. A numerical example which demonstrates the use of the PP discipline to achieve service differentiation is presented. This example also shows how the assigned parameters can be determined from the results of analysis mentioned above.

Similar Papers
  • Conference Article
  • Citations13

A probabilistic priority scheduling discipline for high speed networks

  • May 29, 2001
  • Yuming Jiang +2
  • Research Article
  • Citations18

Achieving differentiated services through multi-class probabilistic priority scheduling

  • Jul 01, 2002
  • Computer Networks
  • Chen-Khong Tham +2
  • Book Chapter

Improving Bandwidth Efficiency in a Multi-service Slotted Dual Bus Optical Ring Network

  • Jan 01, 2006
  • Mohamad Chaitou +2
  • Research Article

Lessons from the Epicenter of the COVID-19 Pandemic: An Analysis of the Surgical Completion Rates between Priority Classes and Procedure Types.

  • Sep 09, 2022
  • Plastic & Reconstructive Surgery
  • Rebecca Suydam +3
  • Research Article
  • Citations71

Extending the effective bandwidth concept to networks with priority classes

  • Jan 01, 1998
  • IEEE Communications Magazine
  • A.W Berger +1
  • Research Article
  • Citations1

Optical MAN ring performance with traffic aggregations

  • Apr 24, 2010
  • Computer Communications
  • Hind Castel-Taleb +2
  • Conference Article
  • Citations4

A two-stage discretionary priority service system with Markovian arrival inputs

  • Dec 01, 2010
  • Ning Zhao +1
  • Research Article
  • Citations96

Novel Methodology for Triage and Prioritizing Using “Big Data” Patients with Chronic Heart Diseases Through Telemedicine Environmental

  • Sep 01, 2017
  • International Journal of Information Technology & Decision Making
  • O H Salman +4
  • Research Article
  • Citations10

Polynomial goal programming: A procedure for modeling preference trade-offs

  • Dec 01, 1988
  • Journal of Operations Management
  • Richard F Deckro +1
  • Research Article
  • Citations9

A New Two‐Bin Policy for Inventory Systems with Differentiated Demand Classes

  • May 01, 2015
  • Production and Operations Management
  • Sugoutam Ghosh +2
  • Book Chapter
  • Citations1

Achieving Relative Differentiated Services Using Proportional Probabilistic Priority Scheduling on Network Processor

  • Jan 01, 2003
  • Chee-Wei Tan +1
  • Research Article
  • Citations3

Bounds on the Mean Delay in Multiclass Queueing Networks under Shortfall-Based Priority Rules

  • Jul 01, 1998
  • Probability in the Engineering and Informational Sciences
  • Sridhar Seshadri +1
  • Conference Article
  • Citations8

An effective scheme for pre-emptive priorities in dual bus Metropolitan Area Networks

  • Jan 01, 1992
  • Jörg Liebeherr +2
  • Supplementary Content

Design of a Fast Location-Based Handoff Scheme for Vehicular Networks

  • Jan 01, 2013
  • uO Research (University of Ottawa)
  • Yikun Wang
  • Conference Article
  • Citations1

Control system development for test handler

  • Dec 19, 2002
  • K John
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.