• Home
  • Search
  • Delay analysis of the approximate maximum weight scheduling in wireless networks
  • Cite Icon5
  • https://doi.org/10.1109/iwcmc.2013.6583532Copy DOI Icon

Delay analysis of the approximate maximum weight scheduling in wireless networks

  • Jul 1, 2013
  • Cem Boyaci +1 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

We provide bounds for the expectations of the stationary delay and the sum of the stationary queue sizes under the approximate maximum weight scheduling (MWS) policy and under the longest-queue-first (LQF) policy in one-hop wireless networks. For MWS, our results improves the previously provided bounds; for LQF, the results are new. In the derivation of the new bounds, a connection with certain graph theory quantities has been established. We also derive bounds for the sum of the second moments of the stationary queue sizes, which are also bounds for the sum of the queue-size variances. The method is general and it can be used to derive bounds for the sum of even higher moments of the stationary queue sizes. However, for the approximate MWS policy, the bounds for the second or higher moments are only valid when the average arrival rate vector is confined to a subset of the capacity region that depends on the order of the moment.

Similar Papers
  • Conference Article
  • Citations14

Data aggregation scheduling in wireless networks with Cognitive Radio capability

  • Jun 01, 2014
  • Mingyuan Yan +4
  • Conference Article
  • Citations13

Connection-level scheduling in wireless networks using only MAC-layer information

  • Mar 01, 2012
  • Javad Ghaderi +2
  • Conference Article
  • Citations2

Fractional wireless link scheduling and polynomial approximate capacity regions of wireless networks

  • May 01, 2017
  • Peng-Jun Wan +3
  • Conference Article
  • Citations4

Stability of longest-queue-first scheduling in linear wireless networks with multihop traffic and one-hop interference

  • Dec 01, 2013
  • Xiaohan Kang +2
  • Conference Article
  • Citations1

The impact of queue length information on buffer overflow in parallel queues

  • Sep 01, 2009
  • Krishna Jagannathan +1
  • Research Article

Innovative Approaches using Generative Artificial Intelligence (GAI) with Diffusion Models, GANs, and Optimization of Spectrum, Power, Routing, and Network Scheduling in Wireless Networks

  • Nov 19, 2025
  • INTERNATIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT
  • Sarthak Prakash +5
  • Research Article
  • Citations6

Opportunistic scheduling for an OFDMA system with multi‐class services

  • Nov 17, 2010
  • Wireless Communications and Mobile Computing
  • Jeong-Ahn Kwon +1
  • Book Chapter

Inter-service Time Guaranteed Scheduling in Wireless Networks

  • Jan 01, 2014
  • Xu Zheng +2
  • Conference Article
  • Citations11

A Distributed Transmission Scheduling Algorithm for Wireless Networks Based on the Ising Model

  • Jun 01, 2018
  • Xi Li +3
  • Research Article
  • Citations2

Downlink data transmission scheduling algorithms in wireless networks

  • Nov 27, 2010
  • Simulation Modelling Practice and Theory
  • Keqin Li
  • Research Article
  • Citations4

End-to-End Delay Guaranteed Proportional Fair Scheduling for Wireless Networks

  • Apr 01, 2011
  • IEEE Communications Letters
  • Jae-Han Jeon +2
  • Research Article
  • Citations121

Super-fast delay tradeoffs for utility optimal fair scheduling in wireless networks

  • Aug 01, 2006
  • IEEE Journal on Selected Areas in Communications
  • M.J Neely
  • Conference Article
  • Citations19

A new opportunistic MAC layer protocol for cognitive IEEE 802.11-based wireless networks

  • Sep 01, 2009
  • Abderrahim Benslimane +3
  • Research Article
  • Citations12

An improved approximation algorithm for the shortest link scheduling in wireless networks under SINR and hypergraph models

  • Jun 04, 2015
  • Journal of Combinatorial Optimization
  • Cui Wang +4
  • Research Article
  • Citations6

Joint routing and scheduling in multi-Tx/Rx wireless mesh networks with random demands

  • Feb 03, 2016
  • Computer Networks
  • Luyao Wang +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.