• Home
  • Search
  • Designing an organization structure for large and complex IT programs using the Viable System Model(VSM)
  • Cite Icon5
  • https://doi.org/10.1109/tencon.2015.7372958Copy DOI Icon

Designing an organization structure for large and complex IT programs using the Viable System Model(VSM)

  • Nov 1, 2015
  • Supriya Kummamuru +1 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Management of large and complex Information Technology (IT) programs, involving a combination of several Software development projects along with non IT projects which form part of an organizational program is an enormous challenge. It becomes increasingly difficult, given the numerous stakeholders, dimensions and aspects it has to deal with, which includes changing business environments, project types, business domains and technology. Programs are generally planned and delivered through the industry standard frameworks like Managing Successful Programs (MSP®) of the Her Majesty's Office of Government and Commerce OGC of UK or Program Management Professional (PgMP) of the Project Management Institute PMI. These industry standard program management frameworks provide program governance structures that are hierarchical. The organization structure of such a system or program often leads to inadequacies in the roles and responsibilities which are defined and also added on an ad hoc basis. The mechanistic approach to the structure of a large programs leads to inadequacies leading to a struggle dealing with large programs. Therefore designing the Program management functions requires understanding the aspects of its operations, structure, governance, processes and competencies. It is a complex interface between several aspects. A metaphor like a Viable System Model (VSM) will help us identify a structure which will make management of the programs viable and manageable. This paper presents a design for an organization structure to manage large programs from the perspective of the cybernetic theory of organization structure, namely the Viable System Model. The design includes inputs of a survey conducted across a cross section of IT program managers from various business domains namely insurance, telecom and healthcare. It ensures roles are defined to handle program related responsibilities in a coherent way.

Similar Papers
  • Research Article
  • Citations22

IT program management challenges: insights from programs that ran into difficulties

  • Jan 27, 2022
  • International Journal of Information Systems and Project Management
  • R Alexander Teubner
  • Research Article

Digital Workforce Screening: A SWOT Perspective on IT Program Readiness in Malaysian Vocational Education

  • Nov 30, 2025
  • e-Bangi Journal of Social Science and Humanities
  • Nurbaya Mohd Rosli +2
  • Research Article

Improve the Scrum Process Model for the Structure and Behavior of the IT Organization using the Viable System Model

  • May 18, 2025
  • Information Sciences with Applications
  • Muhammad Hamid +2
  • Research Article
  • Citations6

Diagnosis of Software Projects Based on the Viable System Model

  • May 16, 2019
  • Systemic Practice and Action Research
  • Julio César Puche-Regaliza +2
  • Research Article
  • Citations30

Balanced IT-Decision-Card Ein Instrument für das Investitionscontrolling von IT-Projekten

  • Jun 01, 2004
  • Wirtschaftsinformatik
  • Andreas Jonen +3
  • Conference Article
  • Citations1

Research on organizational structure based on Viable System Model: How to diagnose the problem of management from the view of knowledge

  • May 01, 2011
  • Haibo Li +1
  • Research Article
  • Citations1

Improving the Efficacy of On-the-Job Training Course in the Context of a Private Higher Education Institution Offering a Bachelor of Science in Information Technology Program

  • Nov 30, 2024
  • Asia Pacific Journal of Management and Sustainable Development
  • Maria Cristina Ramos
  • Research Article
  • Citations11

Evaluating collaborative R&D programmes in information technology: the case of the U.K. Alvey programme

  • Dec 01, 1988
  • Technovation
  • Michael Hobday
  • Research Article

Taxing the Taxpayers: Examining the Drivers of Rebaselining in US Federal Government IT Programs

  • Jul 20, 2017
  • Academy of Management Proceedings
  • Dwaipayan Roy +2
  • Research Article
  • Citations5

Multilateral analysis of stakeholder integration, project complexity and project performance on information technology (IT) projects

  • Sep 19, 2024
  • International Journal of Productivity and Performance Management
  • Diana Ominde +2
  • Conference Article
  • Citations5

Revising the ABET Information Technology Criteria to Reflect the IT 2017 Curriculum Guidelines

  • Sep 14, 2018
  • Scott Murray +3
  • Research Article
  • Citations1

Viable System Model (VSM): A New Approach to Accounting Information System Development Model

  • May 03, 2024
  • KnE Social Sciences
  • Arista Hakiki +3
  • Discussion
  • Citations9

Theoretical notes regarding the practical application of Stafford Beer’s viable system model

  • Nov 27, 2017
  • Kybernetes
  • Markus Orengo
  • Research Article
  • Citations6

Coordination Mechanisms Illustrated with Project Management Using the Viable System Model (VSM) as Organizational Framework

  • Dec 01, 2012
  • Jindal Journal of Business Research
  • Miguel A Morales-Arroyo +4
  • Research Article
  • Citations10

IFORS' Operational Research Hall of Fame Stafford Beer

  • Oct 16, 2006
  • International Transactions in Operational Research
  • Jonathan Rosenhead
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.