• Home
  • Search
  • Detecting and estimating the time of a step-change in multivariate Poisson processes
  • Cite Icon14
  • https://doi.org/10.1016/j.scient.2011.11.044Copy DOI Icon

Detecting and estimating the time of a step-change in multivariate Poisson processes

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

In multi-attribute process monitoring, when a control chart signals an out-of-control condition indicating the existence of a special cause, knowing when the process has really changed (the change point) accelerates the identification of the source of the special cause and makes the corrective measures to be employed sooner. This, of course, results in a considerable amount of savings in time and money. Since many real world multi-attribute processes are Poisson and most process changes are step-change, a new method is proposed, in this paper, to derive the maximum likelihood estimator of the time of a step-change in the mean vector of multivariate Poisson processes. In this method, two transformations are first employed to almost remove the inherent skewness involved in multi-attribute processes and make them almost multivariate normal, and also to almost diminish correlations between the attributes. Then, a T2 control chart is employed for out-of-control detection and a maximum likelihood estimator is used to estimate the change point. The performance of the proposed methodology is illustrated using some simulation experiments in which we show that the proposed procedure is relatively accurate and reliable in detecting and estimating the change point.

Similar Papers
  • Research Article
  • Citations19

Estimating the time of step change with Poisson CUSUM and EWMA control charts

  • Apr 30, 2010
  • International Journal of Production Research
  • Marcus B Perry +1
  • Research Article
  • Citations49

Skewness Reduction Approach in Multi-Attribute Process Monitoring

  • Sep 04, 2007
  • Communications in Statistics - Theory and Methods
  • Seyed Taghi Akhavan Niaki +1
  • Research Article
  • Citations13

Bayesian Change Point Detection in Monitoring Cardiac Surgery Outcomes

  • Jul 01, 2011
  • Quality Management in Health Care
  • Hassan Assareh +2
  • Research Article
  • Citations7

Multi-Objective Genetic Algorithm for Economic Statistical Design of the T2 Control Chart with Variable Sample Size: The Updated Markov Chain Approach

  • Feb 06, 2018
  • Journal of Testing and Evaluation
  • Asghar Seif
  • Research Article
  • Citations1

Use of statistical process control charts to identify impactful implementation strategies for an ePRO-based symptom management program across the SIMPRO Consortium.

  • Jun 01, 2023
  • Journal of Clinical Oncology
  • Jim W Doolin +10
  • Research Article
  • Citations29

Fuzzy multivariate exponentially weighted moving average control chart

  • Dec 30, 2009
  • The International Journal of Advanced Manufacturing Technology
  • Hossein Alipour +1
  • Research Article
  • Citations11

On the location‐based memory type control charts under modified successive sampling scheme

  • Dec 27, 2021
  • Quality and Reliability Engineering International
  • Mehvish Hyder +4
  • Research Article
  • Citations62

A hybrid fuzzy-statistical clustering approach for estimating the time of changes in fixed and variable sampling control charts

  • Jan 22, 2009
  • Information Sciences
  • Adel Alaeddini +2
  • Research Article
  • Citations14

Identifying the time of step change in binary profiles

  • Feb 15, 2012
  • The International Journal of Advanced Manufacturing Technology
  • Alireza Sharafi +2
  • Research Article

Statistical Process Control (SPC) 101

  • Sep 01, 2022
  • On-Demand Webinars
  • Ron Lasky +1
  • Research Article

Robustness of retrospective weighted control charts

  • Jan 01, 2016
  • European J. of Industrial Engineering
  • Shih Chou Kao
  • Conference Article
  • Citations2

Identifying the time of a step change with MEWMA control charts by artificial neural network

  • Dec 01, 2008
  • F Ahmadzade +1
  • Research Article
  • Citations157

Should Observations Be Grouped for Effective Process Monitoring?

  • Oct 01, 2004
  • Journal of Quality Technology
  • Marion R Reynolds +1
  • Research Article
  • Citations1

Bayesian estimation of the change point in a gamma process using control chart

  • Jun 29, 2015
  • Communications in Statistics - Simulation and Computation
  • M Esmail Dehghan Monfared +1
  • Research Article
  • Citations35

Autoregressive coefficients based Hotelling’s T2 control chart for structural health monitoring

  • Apr 21, 2008
  • Computers & Structures
  • Zengrong Wang +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.