• Home
  • Search
  • Development of a verification method of estimated indicators for their use as an optimization criterion
  • Open Access IconOpen Access
  • Cite Icon50
  • https://doi.org/10.15587/1729-4061.2017.95914Copy DOI Icon

Development of a verification method of estimated indicators for their use as an optimization criterion

Show More
  • Abstract
  • Highlights & Summary
  • PDF
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

The optimization criterion is that reference point of the controlled systems, which provides the maximum coherence of the operational process results with the purpose of its owner. Difficulties of solving the tasks, connected with the choice of an adequate optimization criterion are caused by the fact that a large number of indicators intended for use as an optimization criterion have been developed and continue to be developed now. The verification process of the indicator, which can potentially be used as an optimization criterion, is rather difficult. This difficulty is caused by the fact that the identification process is based on an exclusion method. Those indicators that have shown contradictory results on the classes of operations models identified by the rating efficiency should be excluded from the “contenders”. During the researches, the hypothesis on the possibility of creating the reference models, allowing the development of direct verification methods wasn’t confirmed. However, the comparative research of cybernetic models of operations with different duration for consistency has allowed setting a restriction on the formation rules of models of this class and defining the rules of their equivalent converting. Besides, during the researches, the method of creating a class of simple operation models with the predetermined identification, concerning their rating efficiency, has been developed. This means that the rating creation of these models doesn't require determination of local efficiency criteria. Creation of a new class of reference models expands the possibilities of the estimated indicator verification method. At the same time, the positive effect of expansion of the opportunities of the verification method is shown not so much in an increase in the probability of excluding the inadequate estimated indicator, but in the introduction of a restriction on the rules of creating the classes of reference operation models. Introduction of a restriction prevents the possibility of excluding the adequate estimated indicator from consideration.

Loading PDF

Similar Papers
  • PDF
  • Research Article
  • Citations3

Development of test operations of different duration in terms of input for the verification of efficiency formula

  • Sep 13, 2018
  • Eastern-European Journal of Enterprise Technologies
  • Igor Lutsenko +4
  • Research Article
  • Citations1

Selection of Appropriate Criteria for Optimization of Ventilation Element for Protective Clothing Using a Numerical Approach

  • May 02, 2024
  • Computation
  • Sanjay Rajni Vejanand +2
  • Research Article
  • Citations21

Models for university technology transfer operation: patent agency and 2g

  • Jan 01, 2006
  • International Journal of Technology Transfer and Commercialisation
  • Einar Rasmussen
  • Dissertation
  • Citations5

Compositional modelling using Petri nets with the analysis power of stochastic hybrid processes

  • May 20, 2019
  • Mariken Everdij
  • PDF
  • Research Article

THE STRUCTURE AND PRINCIPLES OF OPERATION OF A PREDICTIVE MODEL RAILWAY DIRECTIONS

  • Sep 13, 2015
  • Transport systems and transportation technologies
  • Л О Єльнікова +1
  • Research Article

Institution-specific pre-treatment quality assurance control and specification limits: a tool to implement a new formalism and criteria optimization using statistical process control and heuristic methods

  • Jan 28, 2026
  • Physics in Medicine & Biology
  • Aspasia E Evgeneia +5
  • Research Article
  • Citations3

Application of a Simple Decision Model for Soil Vapor Extraction System Operation

  • Sep 01, 2006
  • Groundwater Monitoring & Remediation
  • David L Barnes +1
  • Single Book
  • Citations498

Trace Theory for Automatic Hierarchical Verification of Speed-Independent Circuits

  • Sep 07, 1989
  • David L Dill
  • Research Article
  • Citations1

Probability models of wastewater treatment plant operation

  • Feb 01, 1976
  • Journal of Hydrology
  • Jonathan W Bulkley
  • Research Article
  • Citations1

Two-stage stochastic programming model and solution strategy for proactive planning and reactive operations of resilient power systems under disruptions

  • Dec 01, 2025
  • International Journal of Electrical Power & Energy Systems
  • Seolhee Cho +1
  • Research Article
  • Citations128

Physical and Mathematical Modelling of Steelmaking Tundish Operations: A Review of the Last Decade (1999–2009)

  • Jan 01, 2010
  • ISIJ International
  • Kinnor Chattopadhyay +2
  • Research Article
  • Citations9

A stochastic model for heterogeneous computing and its application in data relocation scheme development

  • Jan 01, 1998
  • IEEE Transactions on Parallel and Distributed Systems
  • Min Tan +1
  • Research Article
  • Citations32

Linear Filtering of Sample Covariances for Ensemble-Based Data Assimilation. Part II: Application to a Convective-Scale NWP Model

  • May 01, 2015
  • Monthly Weather Review
  • Benjamin Ménétrier +3
  • Conference Article
  • Citations6

Designing fuzzy logic controllers for DC servomotors supported by fuzzy logic control development environment

  • Nov 29, 2001
  • M.K Habib
  • Research Article
  • Citations1

Reliable Accuracy of On-line Permanent Magnet Synchronous Machine Parameters’ Identification Process by Using a Meta-heuristic Optimization Algorithm

  • Nov 09, 2023
  • Electric Power Components and Systems
  • Khayra Roummani +5
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.