• Home
  • Search
  • Dynamic scheduling model for the construction industry
  • Open Access IconOpen Access
  • Cite Icon15
  • https://doi.org/10.1108/bepam-02-2019-0021Copy DOI Icon

Dynamic scheduling model for the construction industry

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

PurposeBasic project control through traditional methods is not sufficient to manage the majority of real-time events in most construction projects. The purpose of this paper is to propose a Dynamic Scheduling (DS) model that utilizes multi-objective optimization of cost, time, resources and cash flow, throughout project construction.Design/methodology/approachUpon reviewing the topic of DS, a worldwide internet survey with 364 respondents was conducted to define end-user requirements. The model was formulated and solution algorithms discussed. Verification was reported using predefined problem sets and a real-life case. Validation was performed via feedback from industry experts.FindingsThe need for multi-objective dynamic software optimization of construction schedules and the ability to choose among a set of optimal alternatives were highlighted. Model verification through well-known test cases and a real-life project case study showed that the model successfully achieved the required dynamic functionality whether under the small solved example or under the complex case study. The model was validated for practicality, optimization of various DS schedule quality gates, ease of use and software integration with contemporary project management practices.Practical implicationsOptimized real-time scheduling can provide better resources management including labor utilization and cost efficiency. Furthermore, DS contributes to optimum materials procurement, thus minimizing waste.Social implicationsOptimized real-time scheduling can provide better resources management including labor utilization and cost efficiency. Furthermore, DS contributes to optimum materials procurement, thus minimizing waste.Originality/valueThe paper illustrates the importance of DS in construction, identifies the user needs and overviews the development, verification and validation of a model that supports the generation of high-quality schedules beneficial to large-scale projects.

Similar Papers
  • PDF
  • Research Article
  • Citations2

Optimization of warship formation air defense combat model based on dynamic scheduling of combat resources

  • Jul 01, 2018
  • Advances in Mechanical Engineering
  • Liang Ma +1
  • Research Article
  • Citations9

Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand

  • Apr 05, 2022
  • Smart and Sustainable Built Environment
  • Mahesh Babu Purushothaman +1
  • Book Chapter
  • Citations4

Dynamic Production Scheduling Modeling and Multi-objective Optimization for Automobile Mixed-Model Production

  • Jan 01, 2018
  • Zhenyu Shen +5
  • Conference Article

Research on dynamic scheduling method of railway transportation based on pre-classification

  • May 17, 2022
  • Yanzhi Pang +3
  • Research Article
  • Citations58

Dynamic scheduling in steelmaking-continuous casting production for continuous caster breakdown

  • Dec 21, 2016
  • International Journal of Production Research
  • Jianyu Long +2
  • Conference Article
  • Citations1

A New Joint Data-Model Driven Dynamic Scheduling Architecture for Intelligent Workshop

  • Jun 10, 2019
  • Kunkun Peng +4
  • Research Article
  • Citations15

Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups

  • Jan 01, 2007
  • European J. of Industrial Engineering
  • Xuefeng Yu +2
  • Conference Article

Dynamic Scheduling Strategy of Single Process Intelligent RGV

  • Dec 01, 2020
  • Chunyan Liu
  • PDF
  • Research Article
  • Citations37

Collaborative Scheduling of On-Site and Off-Site Operations in Prefabrication

  • Nov 08, 2020
  • Sustainability
  • Wei Chen +4
  • Research Article
  • Citations21

Business Reputation and Labor Efficiency, Productivity and Cost

  • Jul 16, 2009
  • SSRN Electronic Journal
  • Martin T Stuebs +1
  • Research Article
  • Citations1

Finance for Managers

  • Jun 13, 2019
  • SSRN Electronic Journal
  • Pablo Fernandez
  • Research Article
  • Citations3

Meta-heuristics for dynamic real time scheduling of diffusion furnace in semiconductor manufacturing industry

  • Jan 01, 2020
  • International Journal of Industrial and Systems Engineering
  • M Vimala Rani +1
  • Research Article
  • Citations85

Joint Scheduling and Beamforming Coordination in Cloud Radio Access Networks With QoS Guarantees

  • Jul 01, 2016
  • IEEE Transactions on Vehicular Technology
  • Xiaoyan Huang +3
  • Conference Article

Developing Mathematical Model for Dynamic Energy-Aware Scheduling of Diffusion Furnaces with Machine Eligibility and Waiting Time Restrictions

  • Feb 18, 2025
  • Anusheya M +1
  • Research Article
  • Citations13

Labor-use efficiency and New York dairy farm financial performance

  • Sep 17, 2019
  • Agricultural Finance Review
  • Jing Yi +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.