  • Early-tardy scheduling under fuzzy due dates using a genetic algorithm
  • Cite Icon3
  • https://doi.org/10.1109/cec.1999.782542Copy DOI Icon

Early-tardy scheduling under fuzzy due dates using a genetic algorithm

  • Jul 6, 1999
  • S.s Lam +1 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

We consider the problem of scheduling n jobs on a single machine. Each job i has a processing time p/sub i/, a weight w/sub i/, and a due date D/sub i/, which is a fuzzy number with a triangular membership function. The problem is to determine: (i) a job sequence, and (ii) a set of idle times each before one job, so as to minimize the total weighted earliness and tardiness cost under the fuzzy due dates. We first introduce a fuzzy distance function to measure the deviation of the completion time of a job from its fuzzy due date. We show that, given a job sequence, the problem of determining the optimal idle times is a continuous and convex optimization problem with a differentiable objective function, although the objective function after applying the fuzzy distance measure becomes nonlinear. We devise a genetic algorithm (GA) to tackle the problem, using a pigeon-hole coding scheme to represent a sequence and a nonlinear optimizer to determine the idle times. We evaluate the solutions obtained by such a GA as compared to the solutions obtained by treating the due dates as crispy numbers equal to the mean values of its fuzzy partners.

Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.