• Home
  • Search
  • Efficient block-based parameterized timing analysis covering all potentially critical paths
  • Open Access IconOpen Access
  • Cite Icon9
  • https://doi.org/10.1109/iccad.2008.4681570Copy DOI Icon

Efficient block-based parameterized timing analysis covering all potentially critical paths

  • Nov 1, 2008
  • Khaled R Heloue +2 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

In order for the results of timing analysis to be useful, they must provide insight and guidance on how the circuit may be improved so as to fix any reported timing problems. A limitation of many recent variability-aware timing analysis techniques is that, while they report delay distributions, or verify multiple corners, they do not provide the required guidance for re-design. We propose an efficient block-based parameterized timing analysis technique that can accurately capture circuit delay at every point in the parameter space, by reporting all paths that can become critical. Using an efficient pruning algorithm, only those potentially critical paths are carried forward, while all other paths are discarded during propagation. This allows one to examine local robustness to parameters in different regions of the parameter space, not by considering differential sensitivity at a point (which would be useless in this context) but by knowledge of the paths that can become critical at nearby points in parameter space. We give a formal definition of this problem and propose a technique for solving it that improves on the state of the art, both in terms of theoretical computational complexity and in terms of run time on various test circuits.

Similar Papers
  • Conference Article
  • Citations1

Critical view of three lens design methods: damped least squares, Spencer's and Glatzel's

  • Sep 19, 2002
  • Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE
  • Juan L Rayces +1
  • Conference Article
  • Citations25

Implementation of Hough Transform for image processing applications

  • Apr 01, 2014
  • L Chandrasekar +1
  • Research Article
  • Citations6

The binary black hole explorer: on-the-fly visualizations of precessing binary black holes

  • Apr 08, 2019
  • Classical and Quantum Gravity
  • Vijay Varma +2
  • Research Article

Sloppiness: Fundamental study, new formalism and its application in model assessment

  • Mar 08, 2023
  • PLOS ONE
  • Prem Jagadeesan +6
  • Research Article
  • Citations37

Exploring the likelihood of the 21-cm power spectrum with simulation-based inference

  • Jul 06, 2023
  • Monthly Notices of the Royal Astronomical Society
  • David Prelogović +1
  • Single Report

Precision Measurements in Supersymmetry [Thesis

  • May 01, 1995
  • Jonathan Feng
  • Research Article
  • Citations49

3D building roof reconstruction from airborne LiDAR point clouds: a framework based on a spatial database

  • Mar 09, 2017
  • International Journal of Geographical Information Science
  • Rujun Cao +3
  • Research Article
  • Citations9

Non-Hermitian minimal Kitaev chains

  • May 27, 2025
  • Physical Review B
  • Jorge Cayao +1
  • Book Chapter
  • Citations5

Free Flight in Parameter Space: A Dynamic Mapping Strategy for Expressive Free Impro

  • Jan 01, 2008
  • Palle Dahlstedt +1
  • PDF
  • Research Article
  • Citations30

Optimal template banks

  • Aug 24, 2021
  • Physical Review D
  • Bruce Allen
  • Research Article
  • Citations9

A laboratory study of global-scale wave interactions in baroclinic flow with topography I: multiple flow regimes

  • Apr 01, 2011
  • Geophysical & Astrophysical Fluid Dynamics
  • P L Read +1
  • Research Article
  • Citations2

On the selection of Morris trajectories for parametric sensitivity analysis in spectroscopic ellipsometry modeling

  • Nov 13, 2023
  • Journal of Applied Physics
  • D V Likhachev
  • Conference Article

Second level adaptive control based on combination multiple model

  • May 01, 2017
  • Yong Chen +2
  • PDF
  • Research Article

Multi-Wavelength Coherent-Perfect-Absorption−Laser Points and Half-Wave Phase Shift in Parity-Time-Reciprocal Scaling Symmetry Structure

  • Nov 21, 2023
  • Crystals
  • Yongjun Xiao +5
  • Research Article
  • Citations8

Cyclic Switching and Supervisory Control

  • Jun 01, 1995
  • IFAC Proceedings Volumes
  • A.S Morse
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.