• Cite Icon5
  • https://doi.org/10.2514/6.2008-3415Copy DOI Icon

ESOC Ground Segments - The Future?

  • May 12, 2008
  • Colin Haddow +3 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

A ground segment is essentially a “system of systems”, and as such possesses a high degree of complexity. This paper outlines what a typical ESA ground segment will look like in the near future and at how it is planned to evolve this to improve maintainability, increase reliability and decrease development costs. Also examined are ways of improving the utilisation of the hardware and increasing system longevity. I. Introduction HERE are a number of developments currently being carried out at the European Space Operations Centre (ESOC) which will have significant implications for the development, deployment, operation and maintenance of its ground segments. One of the main components of this is the ESA Ground Operation System (EGOS), an ambitious program to standardize the infrastructure used throughout its ground segments in an effort to improve the reliability, cost effectiveness and interoperability. Initially it is concentrating on 3 areas of the ground segment, the station baseband system, the mission control systems and the simulators. Implementation of the initial phases of this has recently begun and is based on the CORBA Component Model (CCM). Another significant element is this EGOS User Desktop, this is being developed with the goal of proving a standard desktop that can be used across a wide range of systems (ideally all) and provide a common “look and feel” across the ground segment. In parallel to this a number of other systems are being developed addressing needs in the areas of automation, service provision, allocation of ground network resources and interoperability. Further activities are also underway defining the requirements for future data distribution systems, database systems, the station computer and also at harmonizing interfaces to elements of the ground segment not currently covered by EGOS, in particular with the Flight Dynamics systems. Underlying all these activities is an approach that is based on, where possible, the adoption of internationally recognised standards, the standardisation of interfaces and designing the new systems with reuse in mind. Longevity of the systems is also an important issue, and investigations are ongoing into the use of virtualisation to improve the lifetime of the software systems and also to reduce the amount of physical hardware required. The possible implications for future ESOC ground segments of the above developments are significant. Developments of future ground segments should be simplified since many of the aspects of the various component systems will be standardised, plus development of any components or systems required should be more straightforward as these will be built on the standard infrastructure provided by EGOS. In addition the physical deployment of systems becomes more flexible and this, combined with the use of virtualisation technology, will enable a more resource efficient deployment of systems. By using virtualisation the amount of physical hardware required will be reduced and there will be a considerable increase in the ability to distribute resources as and when required, e.g. for critical mission phases. With this in mind possible future deployment scenarios are discussed. On the operational side the development of the automation aspects offer the potential to significantly offload the routine workload of the spacecraft controller, offering the possibility of reduced staffing levels by permitting one operator to monitor the operations on more than one spacecraft. More flexible and efficient allocation of ground station resources will give the potential for increased science return from the missions supported.

Similar Papers
  • Conference Article
  • Citations7

EGOS Architecture and the Impact on Existing ESOC Ground Data Systems

  • Jun 19, 2006
  • Yves Doat +4
  • Conference Article
  • Citations1

Dissection of the CCSDS Space Link Extension (SLE) Transfer Services

  • May 02, 2014
  • Juan Fernando Vizcaya Garcia +3
  • Discussion

World's largest space arena to be developed

  • Nov 01, 1988
  • Space Policy
  • Conference Article

The Quality Assurance Process in a Scientific Mission

  • May 17, 2004
  • D Ponz +1
  • Conference Article
  • Citations9

Mission Planning - Establishing a Common Concept for ESOC's Missions.

  • Apr 25, 2010
  • Colin Haddow +3
  • Book Chapter
  • Citations21

Information Mining in Remote Sensing Image Archives

  • Jan 01, 1999
  • Mihai Datcu +2
  • Research Article
  • Citations5

A QoE and Availability-Aware Framework for Network Slice Placement and Resource Allocation

  • Jan 01, 2025
  • IEEE Access
  • Gergely Dobreff +2
  • Research Article
  • Citations24

Rosetta mission operations for landing

  • Jan 22, 2016
  • Acta Astronautica
  • Andrea Accomazzo +2
  • Conference Article
  • Citations1

BepiColombo MPO SSMM and Data Downlink Modelling for Science Operations Analysis

  • May 02, 2014
  • Sara De La Fuente +5
  • Conference Article

Joint Optimization of Resource and Power Allocation in Heterogeneous Urban Dense Cellular Networks

  • May 30, 2018
  • Amira Bezzina +3
  • Conference Article
  • Citations4

A PSO approach to resource allocation in wireless networks

  • Jul 01, 2012
  • Sandra Scott-Hayward +1
  • Research Article
  • Citations91

RETRACTED ARTICLE: Dynamic resource allocation with optimized task scheduling and improved power management in cloud computing

  • Mar 02, 2020
  • Journal of Ambient Intelligence and Humanized Computing
  • J Praveenchandar +1
  • Research Article

Application of BP Neural Network to Optimize the Allocation of Art Teaching Resources

  • Sep 30, 2021
  • Tobacco Regulatory Science
  • Xu Yingjie
  • Research Article

Deployment of enviro system for obtaining geospatial data for forest monitoring and improving forest management and protection

  • Jan 01, 2022
  • AEROjournal
  • Matúš Materna +3
  • Research Article
  • Citations124

Biologically Inspired Resource Allocation for Network Slices in 5G-Enabled Internet of Things

  • Dec 01, 2019
  • IEEE Internet of Things Journal
  • Dapeng Wu +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.